Page 221
SATURN IIE EPABX A30808-X5130-BllO-l-8928 Installation Procedures Issue 1. May 1986 Slot .’ Number 1 Cable Connector for T & R Leads Cable pezt; or T&R Leads for SU16 slot Number Cable Connector for T 6 R Leads Cable Connector for E a M or T&R Leads for SW3 Channel Channel Group 0 Group 1 0245 02 Basic Shelf Assembly (Front View) Channel Channel Channel Channel Channel Group 2 Group 3 Group 4 Group 5 Group 6 0246 02 0246 02 02 I I I I J32 J34 / ; I J33 J36 Channel Channel...
Page 222
A30808-X5130-BllO-1-0928 issue 1, May 1986 ASSIGNMENT OF PENS Shelf (basic = 0, LTU = 1, 2, 3) &. Channel Group (O-7; see above ) Card Slot (O-6: see below for SLA16) Circuit (O-7; see below for StA16) I For SLA16 Boards: Circuits O-7: Use slot number (Y) as shown above. Circuits 8-15: Use slot number +l r/+1) EXAMPLE: SLA16 assigned to LTU Shelf 2, Channel Group 3, Slot 0 PENS of first 8 circuits: 2300 through 2307 T/R leads of circuits are located on connector J32 PENS of second 8...
Page 223
Siemens Practices Installation Series : A30808-X5130-8120-1-8928 1 Issue 1, May 1986 ’ 1 ! Issued by Office Systems Group 5500 Broken Sound Boulevard N.W., Boca Raton, Florida 33431 --___________- Siemcns Information Systems, Inc. (305) 994-8100 l Telex: 515052 ----- - ..- ----- Printed in U.S.A.
Page 224
SATURN IIE EPABX A30808X5130-8120-1-8328 Installation Test Procedures Issue 1, May 1906 SECTION PAGE l.CO INTRDCUCTlON ............ ; ............. .1-l Purpose .................................. l-l scope .................................... 1-l Siemens SATURN IIE Practices ................. l-l Siemens Customer Support Services. ........... l-l 2.00 PREP/%KGXIY ACTIVITY ................... 2-1 Cener21. ................................. 2-1 Test Equipment Required. ................... 2-l...
Page 225
SATURN IIE EPABX installation Test Procedures A30808-X5130-0120-l-0928 Issue 1, May 1986 . 1.01 Purpose. The equipment comprising the SATURN IiE (SATURN Ii-Expanded) System is compleYely tested at the fac- tory prior to shipment. The inspections and tests covered in this practice verify that the EPABX equipment has been properly installed; ensure that no damage wasIncurred dur- ing transit; and confirm that the sysiem is completely opera- tional. Table 1.00 defines the mnemonics usedthroughout...
Page 226
SATURN IIE EPABX Installation Test Procedures . Table 1.00 Mnemonics Used in This Practice (Continued) [\fiNEMDNIC * DEFINITION RAUP Remote Access Unit/Ports RGEN Ring Generator S-416 Subscriber Line Module Analog - 16 lines SLMA Subscriber Line Module Analog SLMA-S Subscriber Line Module Analog - Station SLMD Subscriber Line Module Digital SMXTG Signal Multiplexer/Tone Generator SPC Stored-Program-Controlled SPG Single Point Ground TMBA-2 Two-Wire E&M Trunk TMBA-4 Four-Wire E&M Trunk...
Page 227
SATURN IIE EPABX A30808-X5130-B120-l-8928 Installation Test Procedures Issue 1, May 1986 2.01 General. This section describes the test equipment re- quired to perform the installation test procedures, handling precautions for Printed Circuit Boards (PCBs) with Metal Ox- ide Semiconductor (MOS) integrated circuits, guidelines for removal and replacement of PCBs and powei supplies, and initial visual inspection procedures. 2.02 Test Equipment Required. The following test equip- ment is required to...
Page 228
- Table 2.00 PC3 and Power Supply Remcval Guidelines I’AODIJLE OR SERVEC” SPECIAL UNIT STATE INSTRUCTKWIS CIOP NA CONF . NA DTMF 00s FDDO, FDDl NA LTUC f NA LTUPS l NA MCA MEM3 kz MEM4 NA MSM l NA MSM Baitery l NA PIMD 00s PSC NA PSU NA RAUP NA SLAl6 00s SLMA-0 00s SLMA-S 003 SLMD 00s SMXTG ES TMBA-2 TMBA-4 00s TMBM 00s TMIE 00s -48PS.l NA -48PSt f NA * Optional depending upon customer/system requirements. NA = Not Applicable; 00s = Out-of-Service Notes 1 and 2...
Page 229
I .- A30808-X5130-B120-l-8928 Issue 1, May 1986 SATURN IIE EPABX Installation Test Procedures Table 2.01 Visual Inspection STEP VISUAL INSPECTION REFERENCE 1 Check that the cabinet ac power cord is not connected to an electrical outlet. 2 Check that the -48Vdc power supply is strapped for SATURN IIE EPABX Installation 11OVac or 22OVac. Procedures Practice (Section 4.00) 3 Check that all circuit breakers on the Power System Unit SATURN IIE EPABX Installation (PSU) are in the OFF position...
Page 230
w3 w13 - I I SATURN IIE EPABX ,xtallation Test Procedures A30808-X5130-B120-l-5928 Issue 1, May 1986 Figure 2.00 Signal Cable Distribution for the SATURN IIE System (Basic Cabinet)