Page 41

ND -4 6551 ( E)  CHAPTER 3
NAP-200-0 02
3 82 mm
25 0  m m
430 mm
PBX B OTT OM  P O SIT IO N
BO TTO M P OSITI ON 

Page 42

CHAPTER 3 ND-46551 (E)
Pag e 3 0
Revision 2.0
NAP-200-002
Sheet 3/3
Marking and Drilling
3. DRILLING 
• Drilling and installing anchor bolts
Figure 002-3  Instruction for Anchor Bolt
 
(1) DRILL A HOLE IN THE CONCRETE WITH A 
DRILL SUITABLE FOR A PLUG BOLT A LITTLE 
DEEPER THAN THE PLUG BOLT LENGTH.
(2) INSERT THE ANCHOR BOLT INTO THE HOLE.
(3) PUSH ANCHOR BOLT UNTIL THE BOLT 
STAYS PERMANENTLY IN PLACE.
(4) TURN BOLT COUNTERCLOCKWISE AND 
REMOVE.(1) (2) (3) (4) 

Page 43

ND-46551 (E) CHAPTER 3
Page 31
Revision 2.0
NAP-200-003
Sheet 1/21
Installation of Main Equipment
Install the main equipment according to the desired procedure for either Floor Standing, Wall-Mounting, 19-Inch
Rack-Mounting or Desk Top installation.
1. FLOOR STANDING INSTALLATION
(1) Attaching the BASE to the floor.
• Position the BASE over the holes drilled as shown in the figure below.
• Secure the BASE to the floor using anchor bolts.
Figure 003-1  Securing of the BASE
BASE
FRONT
INSTALLATION...

Page 44

CHAPTER 3 ND-46551 (E)
Pag e 3 2
Revision 2.0
NAP-200-003
Sheet 2/21
Installation of Main Equipment
(2) Mount the PIM on the BASE, and connect them together using 3 bolts (provided).
Figure 003-2  Mounting of the PIM
PIM
BASE
FRONT 

Page 45

ND-46551 (E) CHAPTER 3
Page 33
Revision 2.0
NAP-200-003
Sheet 3/21
Installation of Main Equipment
(3) Position the TOP COVER on the PIM, and connect them together with 4 screws (provided).
Figure 003-3  Mounting of the TOP COVER
TOP COVER
PIM
FRONT 

Page 46

CHAPTER 3  ND -4 6551 ( E)
NAP-2 00-0 03 

Page 47

ND -4 6551 ( E)  CHAPTER 3
NAP-200-0 03
SCR EW- A (4  p er PI M)
M4 M ACHINE SCRE W-B  (4 p er  P IM )
(W ALL)
38 2 m m(1 5.0  in ch )
ANCHO R (4  p er PI M)
RA CK PA RTS
(9 .8 i nch ) 

Page 48

CHAPTER 3  ND -4 6551 ( E)
NAP-2 00-0 03
(PI M)
(RE AR COVER)
 















 

Page 49

ND-46551 (E) CHAPTER 3
Page 37
Revision 2.0
NAP-200-003
Sheet 7/21
Installation of Main Equipment
(4) After hanging PIM onto the RACK PARTS, tighten each M4 machine screw using a phillips screw driver.
Figure 003-6  Screwing the PIM to the RACK PARTS
M4 MACHINE SCREW-B (X4)
PIMRACK PARTS 

Page 50

CHAPTER 3 ND-46551 (E)
Pag e 3 8
Revision 2.0
NAP-200-003
Sheet 8/21
Installation of Main Equipment
(5) Connect the TOP COVER, BOTTOM COVER and AC CORD-A-U to the PIM. The AC CORD-A-U is
pre-installed with the BOTTOM COVER.
Figure 003-7  Connecting the Covers and AC CORD to the PIM
TOP COVER
TO PZ-PW86 PIM
AC CORD-A-U
BOTTOM COVER
LOCAL CABLE DUCT 