Page 331
NDA-24306 CHAPTER 5 Page 303 Revision 1.0 INSTALLATION TEST PROCEDURE Note: For this test, there are three patterns for connections which possibly can be set up. Refer to Figure 024-1 on the next page. NAP-200-024 Sheet 1/2 Station to Station Connection Test START Confirm that a connection can be established between Station “A” and Station “B.” Station “A” goes off-hook. Station “A” hears dial tone. Station “A” dials the station number of Station “B.” Station “A” confirms that dial tone stops when the...
Page 332
CHAPTER 5 NDA-24306 Page 304 Revision 1.0 INSTALLATION TEST PROCEDURE Figure 024-1 Station-to-Station Connection Test NAP-200-024 Sheet 2/2 Station to Station Connection Test LC/ ELC ORT dial tone, reorder tone Self-Node (ex. LN0)Other Node (ex. LN1) ISW Fusion Link FCCS LinkFusion Link STN ASTN B RG Dial TE LN Di al TE LNDi al TE LN LC/ ELC ORT dial tone, reorder tone Self-Node (ex. LN0) ISW STN A STN B ORT dial tone, reorder tone Self-Node (ex. LN0) STN A ISW: Inter-node Switch LN: Local...
Page 333
NDA-24306 CHAPTER 5 Page 305 Revision 1.0 INSTALLATION TEST PROCEDURE 3. SYSTEM INITIALIZED TEST 3.1 Outline Tests are to be performed on the restart processing (reinitialization) and system changeover functions which en- able the system to restart its operations and services. 3.2 System Initialized Test Procedure The System Changeover Test and Initialization Tests are to be performed per the NAP Numbers indicated to the right of each item in the following flowchart. START System Changeover...
Page 334
CHAPTER 5 NDA-24306 Page 306 Revision 1.0 INSTALLATION TEST PROCEDURE Test Outline Tests are to be performed to see if the ACT/ST-BY of the following equipment is normally changed over: 1. Control Systems in each Local Node (LN) 2. Control Systems in ISW 3. Speech Path Systems in each LN (TSWM0/TSWM1) 4. Speech Path Systems in ISW + all LNs as a whole 5. PLO NAP-200-025 Sheet 1/13 System Changeover Test AT T E N T I O NContents Static Sensitive Handling Precautions Required
Page 335
NDA-24306 CHAPTER 5 Page 307 Revision 1.0 INSTALLATION TEST PROCEDURE 1. Control System changeover in each LN Follow the procedures below to perform the Control System changeover tests in each Local Node (LN). This test must be performed in each LN independently: Note:This changeover can also be performed via the CMODI/CMOD command. Refer to the “System Operations and Maintenance Manual.” Figure 025-1 DSP in ACT/ST-BY Mode (Local Node) NAP-200-025 Sheet 2/13 System Changeover Test START Control System...
Page 336
CHAPTER 5 NDA-24306 Page 308 Revision 1.0 INSTALLATION TEST PROCEDURE 2. Control System changeover in ISW Follow the procedures below to perform the Control System changeover tests in ISW: Note:This changeover can also be performed via the CMODI command. Refer to the “System Operations and Maintenance Manual.” Figure 025-2 DSP in ACT/ST-BY Mode (ISW) NAP-200-025 Sheet 3/13 System Changeover Test START Control System changeover via MBR key on the CPR DSP (PZ-DK224)On the CPR DSP on which CPU OPE lamp...
Page 337
NDA-24306 CHAPTER 5 Page 309 Revision 1.0 INSTALLATION TEST PROCEDURE 3. Speech Path System changeover in each ISW Follow the procedures below to perform the Speech Path System changeover tests in ISW: Note:This changeover can also be performed via the CMODI/CMOD command. Refer to the “System Operations and Maintenance Manual.” Note:If you change over from LNs, the entire system will be changed over. Therefore, it is best to change over from ISW. NAP-200-025 Sheet 4/13 System Changeover Test START Change...
Page 338
CHAPTER 5 NDA-24306 Page 310 Revision 1.0 INSTALLATION TEST PROCEDURE 4. Total Speech Path System changeover Perform the total Speech Path System changeover test by referring to the flowchart below. As suggested in the previous page, the ACT/ST-BY of Speech Path Systems can be differently set in every Local Node (LN). How- ever, excepting a particular case, the Speech Path changeover is normally performed on a system basis as shown in this page: Note:This changeover can also be performed via the...
Page 339
NDA-24306 CHAPTER 5 Page 311 Revision 1.0 INSTALLATION TEST PROCEDURE Figure 025-3 LEDs and Switches for Speech Path System Changeover NAP-200-025 Sheet 6/13 System Changeover Test AT T E N T I O NContents Static Sensitive Handling Precautions Required green TSW ACT MB MBR PH-GT10 IOGT: Active TSW ACT TSW ACTTSW ACT TSW ACT TSW ACTHSW ACT HSW ACTMUX ACTOPE/MB OPE/MB MUX ACT MBMB MB MB MB MB MBMBMB MBR TSW MBR TSW MBRTSW MB TSW MBRTSW MBTSW MBR TSW: Active HSW: Active TSW: Active MUX: Active DLKC:...
Page 340
CHAPTER 5 NDA-24306 Page 312 Revision 1.0 INSTALLATION TEST PROCEDURE 5. PLO changeover Perform the PLO changeover test referring to the flowchart below. NAP-200-025 Sheet 7/13 System Changeover Test START Change over the ACT/ST-BY of the PLO systems in each LN via key operation. On the active PLO (PH-CK16-A) card in TSWM0, flip the MB key DOWN → UP → DOWN (OFF → ON → OFF). Make sure that the ACT/ST-BY of the whole PLO systems (PLO in TSWM0 and CLK in TSWM1) in the same Local Node (LN) are totally...