Page 321
NDA-24306 CHAPTER 4 Page 293 Revision 1.0 SYSTEM STARTUP Figure 021-2 LED Indications of IMG0 in Normal Operation (example) NAP-200-021 Sheet 3/5 Check of Lamp Indications and System Messages 13 14MUX ACTMUX(PH-PC36) MUX(PH-PC36) 13 14 MUX ACT MUX(PH-PC36) MUX(PH-PC36) 13 14 MUX ACT MUX(PH-PC36) MUX(PH-PC36) 13 14 MUX ACT 03 04 IOC(PH-1024) EMA(PH-PC40) OPEOPE/MB TO P U PIM3 PIM2 PIM1 PIM0 LPM BASEUFA N U FRONT VIEW : Lamp is ON (Green) : Lamp is OFF: Lamp is Flashing (Green) Legend CPU 0 -> ACT TSW 0...
Page 322
CHAPTER 4 NDA-24306 Page 294 Revision 1.0 SYSTEM STARTUP Figure 021-3 LED Indications of IMG1/2 in Normal Operation (example) NAP-200-021 Sheet 4/5 Check of Lamp Indications and System Messages This figure shows the LED indications (example) for a fully expanded IMG1/2. 13 14 MUX(PH-PC36) MUX(PH-PC36) 13 14 MUX(PH-PC36) MUX(PH-PC36) 13 14 MUX(PH-PC36) MUX(PH-PC36) MUX(PH-PC36) MUX(PH-PC36) 13 14 08 DLKC (PH-PC20) DLKC (PH-PC20) GT (PA-GT09) TSW 00 (PH-SW12) TSW 01 (PH-SW12) TSW 02 (PH-SW12) TSW 03...
Page 323
NDA-24306 CHAPTER 4 Page 295 Revision 1.0 SYSTEM STARTUP Figure 021-4 LED Indications of IMG3 in Normal Operation (example) NAP-200-021 Sheet 5/5 Check of Lamp Indications and System Messages This figure shows the LED indications (example) of a fully expanded system of IMG 3. 1314 MU X(PH-P C36) M UX(PH -PC36) 1314 MUX( PH-PC 36) MUX (PH-P C36) 131 4 MUX(P H-PC36 ) MUX (PH-PC 36) MUX(P H-PC36 ) MUX( PH-PC 36) 1314 TO PU PIM3 PI M2 PIM1 P IM0 D UMM Y BASE U FA NU FRO NT V IEW : L amp i s ON IMG 3 (L...
Page 324
CHAPTER 4 NDA-24306 Page 296 Revision 1.0 SYSTEM STARTUP Test Outline: The System has Alarm Lamps on the TOPU of ISW and IMG0 of each LN. Figure 022-1 shows the Alarm Lamps on the TOPU. For more information about each lamp, see the “System Operations and Maintenance Manual.” Figure 022-1 Alarm Lamps on the TOPU NAP-200-022 Sheet 1/2 Check of Alarm Lamps of the TOPU ATTENTIONContents Static Sensitive Handling Precautions Required GR R RR Y PWR ONMJ MN SMJ SMN SUP/IP ALM G : green R : red...
Page 325
NDA-24306 CHAPTER 4 Page 297 Revision 1.0 SYSTEM STARTUP NAP-200-022 Sheet 2/2 Check of Alarm Lamps of the TOPU START Test of MJ (MAJOR) Lamp Set the circuit breakers of the Power Supplies (PWR0, 1) in a PIM to OFF (About 10 seconds later, set the circuit breaker(s) back ON. Confirm that the MJ lamp (red) on the TOPU illuminates. Cancel the alarm indication by pressing the ALM RST button on the TOPU. Test of MN (MINOR) Lamp Take an act side RGU Fuse out of the PWR card. Confirm that the MN lamp...
Page 327
NDA-24306 CHAPTER 5 Page 299 Revision 1.0 CHAPTER 5 INSTALLATION TEST PROCEDURE 1. HOW TO ENTER DATA IN THE TEST CHECK COLUMN Each NAP in this chapter has check column for test result entry for each test item (see Figure 5-1). This para- graph explains the method of entering test result into the check column concerned using Figure 5-1 as an exam- ple. 1. Method of Entry Each check column consists of two sections of “PROVIDED” and “CHECK”. If the equipment or service feature pertaining to the test item is...
Page 328
CHAPTER 5 NDA-24306 Page 300 Revision 1.0 INSTALLATION TEST PROCEDURE Figure 5-1 Example of Entry to Test Check Column This example is NAP-200-024: Dial Tone Connection Test When “*” is already printed in the “PROVIDED” section, the item concerned is a basic function of the system. Test the item without exception. Check whether the OPE lamp (G) is turning ON on the RST circuit cards. Check whether the OPE lamp (G) is turning ON on the LC circuit cards. Lift handset. Confirm dial tone. Check whether...
Page 329
NDA-24306 CHAPTER 5 Page 301 Revision 1.0 INSTALLATION TEST PROCEDURE 2. BASIC CONNECTION TEST 2.1 Outline After the system has been started up, establish some basic connections and verify that the system operates nor- mally. 2.2 Basic Connection Test Procedure Perform tests on the operations of the processors and the system by referring to the NAP Number indicated to the right of each item in the following flowchart. If an operation cannot be performed satisfactorily, perform the necessary repair...
Page 330
CHAPTER 5 NDA-24306 Page 302 Revision 1.0 INSTALLATION TEST PROCEDURE NAP-200-023 Sheet 1/1 Dial Tone Connection Test START Check whether the OPE lamp (G) is illuminating on the RST circuit cards. Check whether the OPE lamp (G) is illuminating on the LC circuit cards. Lift handset. Confirm dial tone. Check whether the Busy lamp (R) is illuminating for the connected ORT and LC. Continue listening to dial tone for about 12 seconds. Confirm that dial tone changes to Reorder Tone. Continue listening to...