Home > NEC > Communications System > NEC Neax 2400 Ipx Installation Manual

NEC Neax 2400 Ipx Installation Manual

Here you can view all the pages of manual NEC Neax 2400 Ipx Installation Manual. The NEC manuals for Communications System are available online for free. You can easily download all the documents as PDF.

Page 201

NDA-24306 CHAPTER 3
Page 173
Revision 1.0
NAP-200-010
Sheet 69/73
Cable Connections
Connection of 10 BASE-T cables 
(cross)If multiple HUB (PA-M96) cards are used in the step 
above, cascade each HUB card via the following 
physical cables:
 When HUB cards are cascaded within the same 
PIM: 
 When HUB cards are cascaded within the same 
IMG: 
 When HUB cards are cascaded across different 
IMGs in the same LN: 
 When HUB cards are cascaded across different 
LNs: 
Connection of additional 10 BASE-T...

Page 202

CHAPTER 3 NDA-24306
Page 174
Revision 1.0
Figure 010-38  Ether Cable Connection for ISW and LN (Example)
NAP-200-010
Sheet 70/73
Cable Connections
AT T E N T I O NContents
Static Sensitive
Handling
Precautions Required
TSWM0LPMTSWM1
LN1
TSWM0LPMTSWM1
LN2
TSWM0LPMTSWM1
LN3
ISWM
LPM
ISWFRONT VIEW
LPMTOPU
BASEU
PIM0
LPM
LN0
PIM0
IMG0
00PZ-PC19
00
CPU1
CPU0
LPM
00PZ- PC19
00
CPU1
CPU0
LPM
00PZ-PC19
00
CPU1
CPU0
LPM
PZ-PW92
PZ-PW92CPU1
CPU0
00
00PZ-PC19 PZ-PC19
HUB0HUB1
(11)
(2)
(1)
(3)
(4)
(5)
(6)...

Page 203

NDA-24306 CHAPTER 3
Page 175
Revision 1.0
Note:This table is only an example when the Ether cable connection is provided as shown in Figure 010-38. Ac-
tual cables to be used may differ, depending on your system configuration. See details in the flowchart on
the previous page (Sheet 70/73 and 71/73 in this NAP).
NAP-200-010
Sheet 71/73
Cable Connections
Table 010-22  Ether Cable Connections (Example)
No.FROM TO
CABLE NAME REMARKS
UNIT/
MODULECONNECTOR 
NAMEUNIT/
MODULECONNECTOR 
NAME
(1) LPM (LN0)CN...

Page 204

CHAPTER 3 NDA-24306
Page 176
Revision 1.0
Figure 010-39  Additional Ether Cable Connection When Second LANIs Are Used (Example)
NAP-200-010
Sheet 72/73
Cable Connections
AT T E N T I O NContents
Static Sensitive
Handling
Precautions Required
ISW
TSWM0 LPM
TSWM1
LN0
TSWM0
LPMTSWM1
LN1
FRONT VIEWLPM
BASEU PIM0
LN2
IMG0
03PZ-PC19
03
CPU1
CPU0PWR
PWR
LPM
03
PZ-PC19
03
CP U1
CPU0PWR
PWR
LPM
PZ-PC19CP U1
CPU0PWR
PWR
LPM
PZ-PW9203
PZ-PC19
PZ-PC19
(2)
(1)
(3)
(5)
(6)
(9)
(8)
(10)
(7)
CN
TSWM0TSWM1
LN3...

Page 205

NDA-24306 CHAPTER 3
Page 177
Revision 1.0
Note:This table is only an example when the Ether cable connection is provided as shown in Figure 010-39.
Actual cables to be used may differ, depending on your system configuration. See details in the flowchart
on the previous page (Sheet 70/73 and 71/73 in this NAP).
NAP-200-010
Sheet 73/73
Cable Connections
Table 010-23  Ether Cable Connections for Second LANI (Example)
No.FROM TO
CABLE NAME REMARKS
UNIT/
MODULECONNECTOR 
NAMEUNIT/
MODULECONNECTOR 
NAME
(1)...

Page 206

CHAPTER 3 NDA-24306
Page 178
Revision 1.0
This NAP describes front cable connections between circuit cards.
Note:Protection against static electricity:
A Portable Field Service Grounding Kit must be used to protect system components from static discharge.
Figure 011-1  Front Cable Connections between Circuit Cards for CCIS/ISDN
NAP-200-011
Sheet 1/1
Front Cable Connections between Circuit 
Cards
START
When CCH/DCH and DTI cards are mounted in PIM (For CCIS/ISDN), connect the front cable between 
CCH/DCH...

Page 207

NDA-24306 CHAPTER 3
Page 179
Revision 1.0
This NAP explains the following work items:
 Cable Running from the PBX to the MDF and ATTCON (Desk Console)
 Cable Running from the PBX to the MAT and SMDR
 Connections at the PBX Side
 Cable Tying at the Equipment Frame
Note:Compliance with EMI
To comply with EMI, Shielded cables with CHAMP connector should be used for the following installation
cables:
 Cable from the PBX to the MDF
 Cable from the PBX to Attendant Console
 Cable from the PBX to alarm...

Page 208

CHAPTER 3 NDA-24306
Page 180
Revision 1.0
1. CABLE RUNNING FROM THE PBX TO THE MDF AND ATTCON
NAP-200-012
Sheet 2/13
Cable Running from the PBX to MDF, 
ATTCON, MAT and SMDR
START
Cables (25P) for LT Connectors At the PBX side, verify the names of the connectors on 
the PIM backplane, then bring each LT cable up to the 
corresponding connector position.
Cables for Desk Console Connectors Referring to Figures 015-1 through 015-13 in NAP-
200-015, run the installation cables for the Desk 
Console to the...

Page 209

NDA-24306 CHAPTER 3
Page 181
Revision 1.0
NAP-200-012
Sheet 3/13
Cable Running from the PBX to MDF, 
ATTCON, MAT and SMDR
Cables for ODT Connectors Referring to description of 8TLT card in Circuit Card 
Manual, connect each 2400 ODT CABLE/2400 ODT 
CABLE-A and the corresponding installation cables.
At the PBX side, bring each 2400 ODT CABLE/2400 
ODT CABLE-A up to the connector position on the front 
of the 8TLT cards to be mounted in the PIM. 
At the MDF side, confirm the location of the Terminal...

Page 210

CHAPTER 3 NDA-24306
Page 182
Revision 1.0
Figure 012-1  LT Cable Routing
NAP-200-012
Sheet 4/13
Cable Running from the PBX to MDF, 
ATTCON, MAT and SMDR
(PIM3)
(TOPU)
(PIM2)
(PIM1)
(PIM0)
(LPM)
(BASEU) (FANU)
REAR VIEW 
Start reading NEC Neax 2400 Ipx Installation Manual

Related Manuals for NEC Neax 2400 Ipx Installation Manual

All NEC manuals