NEC Neax 2400 Imx Fusion Network System Manual
Have a look at the manual NEC Neax 2400 Imx Fusion Network System Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 1168 NEC manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
CHAPTER 5 ND-70185 (E) Page 126 Revision 3.0 DATA PROGRAMMING Office Data Sheets FUSION POINT CODE (FPC) 1-253FCCH USE OR NOT USE (FCCH) 0/1 12345678 CONNECTION ROUTE (C_RT) 1-1023 FCCH NUMBER/FUSION POINT CODE NUMBER (FCHN/FPCN) 1-255/1-253
ND-70185 (E) CHAPTER 5 Page 127 Revision 3.0 DATA PROGRAMMING Office Data Sheets 8.13 Data Sheet for ACAN FUSION POINT CODE (FPC) 1-253FUSION CIC NUMBER (FCIC) 1-4095CONNECTION EQUIPMENT NUMBER (C_LENS)REMARKS
CHAPTER 5 ND-70185 (E) Page 128 Revision 3.0 DATA PROGRAMMING Office Data Sheets 8.14 Data Sheet for AFRT FCCH NUMBER (FCHN) 1-255CONNECTION ROUTE (C_RT) 1-1023 12345678
ND-70185 (E) CHAPTER 5 Page 129 Revision 3.0 DATA PROGRAMMING Office Data Sheets 8.15 Data Sheet for AETH DESTINATION FPC (FPC) 1-253GATEWAY USING FLAG (USE_GATE) 0/1FCCH NUMBER (FCHN) 1-255CONNECTION ROUTE (C_RT) 1-1023DESTINATION IP ADDRESS (DST_IP)NEXT IP ADDRESS (NEXT_IP)
CHAPTER 5 ND-70185 (E) Page 130 Revision 3.0 DATA PROGRAMMING Office Data Sheets 8.16 Data Sheet for AGIP LINE EQUIPMENT NUMBER OF FCCH (FCHEN)FGH IP ADDRESS (FGH_IP)IP ADDRESS FOR DEFAULT GATEWAY (DG_IP)FRAME TYPE OF ARP (ARP) 1/2VO I C E CHANNEL CONTROL TYPE (CONTTYP) 0/1QSIG-PRIME LINK NUMBER (LINK_NUM) 0-32CLIENT/ SERVER CONNECTION MAX. NUMBER (CSLINK_NUM) 0-15 MG U G LV
ND-70185 (E) CHAPTER 5 Page 131 Revision 3.0 DATA PROGRAMMING Office Data Sheets 8.17 Data Sheet for AFIP FCH NUMBER (FCHN)LINE EQUIPMENT NUMBER OF FGH (FGHEN)LINE EQUIPMENT NUMBER OF QSIG-PRIME Bch (LENS)ROUTER ACCESS NUMBER (RT_ACC) Max. 16 digits MG U G LV MG U G LV
CHAPTER 5 ND-70185 (E) Page 132 Revision 3.0 DATA PROGRAMMING Office Data Sheets 8.18 Data Sheet for AFRFL TN FPC (1-253)AC C MAX. 24 digits
ND-70185 (E) CHAPTER 6 Page 133 Revision 3.0 CHAPTER 6 POST INSTALLATION TEST This chapter covers how to perform installation tests focusing on the Fusion Call Control Signal (denoted in the remainder of this manual as FCCS) connections, after hardware installation and data assignment. This chapter describes the following tests: How to Check Fusion Link by LEDs on an FCH Card Repair Procedure When LED Indicates Abnormality FCCS Network Connection Test FCCS Alternate Routing Test Fusion and Non-Fusion Connection Test At the end of this chapter, the Fusion Link Test Sheet is attached. Make photo-copies of the sheet to record the test results. In this chapter, explanations are given using the following network numbering as an example. Figure 6-1 Fusion Network Note: The Individual Trunk Access feature is not available for Fusion Trunks. To seize a specific Fusion Trunk, use the MBCT command to make busy trunks which are not being tested. This command leaves the Fusion trunk to be tested in an idle state. 1. How to Check Fusion Link by LEDs on FCH Card Before performing the Fusion link test, be sure to check the Fusion Link LEDs. Refer to Figure 6-2. When the Fusion link is established, the LYR lamp lights green on the FCH (PA-FCHA) circuit card. However, if it re- mains off, the layer 2 (Link Layer) is not established. If this is the case, follow the repair procedure listed here. ............................................................ ............................................................FCCS TELN: 410000 STN: 2000 FCCS: Fusion Call Control Signal STN: Physical Station Number TELN: Telephone Number TELN: 420000 STN: 2000 Fusion Link FUSION Network NodeA (self-Node)STNB NodeB (other Node) STNA Node A Node B
CHAPTER 6 ND-70185 (E) Page 134 Revision 3.0 POST INSTALLATION TEST Repair Procedure When LED Indicates Abnormality 1.1 How to check LYR LED 1. Confirm the LYR LED lights green on the front edge of the FCH (PA-FCHA) circuit card. (See “LED Indication (A)” in Figure 6-2.) When the LED lights green, the fusion link is established. 2. Make sure that any alarm LED is not ON (red/yellow). (See LED Indication (B) in Figure 6-2.) When all alarm LEDs are OFF, the DTI (PA-24DTR) card is in normal operation. If any abnormal state is detected, please see the NEAX2400 IMX Circuit Card Manual. Figure 6-2 LED Indications on Fusion Link Related Circuit Cards 2. Repair Procedure When LED Indicates Abnormality If the LED indication appears abnormal, check the following items again: 2.1 Front Cable Make sure that front cable 10AL (10) FLT CA is securely inserted into the connectors. LYR LB LOADEST3 EST2 EST1 EST0 Payload Line Internal ON 8 OPEOPE Mode PCM FRM BER RMT AIS LED Indication (A) LED Indication (B) DTI FCH Front Cable LYR LB LOAD EST3 EST2 EST1 EST0Remains ON when available for Ethernet Remains ON when ready to broadcast data packets Note Link is established Receive Receive Polarity of pairwire is normalSend PA-FCHA DTI PA-24DTR Remains ON when Fusion Link is established PCM : On when PCM loss occurs. FRM : On when Frame Loss occurs. BER : On when Bit Error occurs. RMT : On when Remote Alarm is received. AIS : On when AIS signal is detected. If any LED is ON, refer to the Circuit Card Manual. FCH FRONT Note:When the FCH is a Root Bridge, the LOAD LED remains ON. When the FCH is Backup Bridge, the LOAD LED flashes (60INT).
ND-70185 (E) CHAPTER 6 Page 135 Revision 3.0 POST INSTALLATION TEST Repair Procedure When LED Indicates Abnormality FCH (PA-FCHA) switch setting Make sure that the following keys are set properly: Dch TS designation (0ch - 23ch: SW11, SW12, SW13) Data Link Signal Logic (positive/negative: SW14-1) Fusion Data Link Speed (48/56/64 kbps: SW14-2, 3) LAPD Signal Link (user/network: SW14-4) 24DTI (PA-24DTR) switch setting Make sure that the keys are properly set on the card. See the NEAX2400 IMX Circuit Card Manual. If the Fusion link is not established using this repair procedure, perform the Fusion Link Test. 2.2 How to Perform the Fusion Link Test 2.2.1 Fusion Link Test Mode Setting To set the FCH card in Fusion Link Test Mode, set the Mode Switch to 9. Initialize the FCH card using the MB key. When the Mode is 9, the Fusion Link Controller on the FCH card sends a test data pattern. When the same pattern is received again the PM activates the LYR LED, flashing the LED at 60-INT, which means the test result is OK. Figure 6-3 Fusion Link Test Mode Note: Be sure to initialize the FCH (PA-FCHA) card, after changing the setting of the Mode Switch. 2.2.2 Loopback Point Designation The DTI card can be set at one of the following loopback points: 1. Internal Loopback Note:Loopback points are set by a DTI card. 9Mode LYR9: Fusion Link Test Mode 8: Standard SettingFCH cardto DTI cardTest is OKLYR LED flashes. FCH front cable Flow of TestPA- FCHA Send Test Data Pattern Receive Test Data Pattern FRONT VIEW Fusion Link Controller sends test data pattern. DTI Interface D/I Fusion Link Controller LoopbackNote To perform a Fusion link test, set the Mode switch to 9.