    Have a look at the manual Mitel Sx-2000 Integrated Communications System Control Sheet Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 55 Mitel manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    Page
    of 526
    							, : 
    . . 
    m IA 
    SX-2000 S ICS Commissioning 
    (A)UPPERSHELF-SHELF2 
    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 16 19 20 
    * * * * * * 
    E 
    is 
    PERIPHERALINTERFACE CARDS 2 
    VJAXIMUM OF 12) 8 
    k-5 
    B 
    (S)LObVERSHELF-SHELF1 
    1 2 3 4 5 6 7 6 9 10 11 12 13 14 15 16 17 16 19 20 
    * * * * * * 
    I I I I I I I 
    PERIPHERALINTERFACE CARDS 
    (MAXIMUM OF 12) 
    NOTES: 1. Theminbnum~~musthavethecardsindicatedbyqnstalledhslotsssshown. 
    2. Digital Se&e Unih may be sny of thefdlawing: 
    Cmference card, DSI or CEPT Fumattec Cards, DTRX o( Ccmms Pmc’r cards. 
    3. Control RAM II card notrequired wilh Main Catdler II card. 
    Figure 4-l SX-2000s Circuit Card Locations 
    9125-060-204-NA Issue 1 Revision 0 204 4-5  
    						
    							Commissionina 
    load Commissioning Software 
    4.2 The following chart details the steps required to install commissioning software on 
    the SX-2000 S system. 
    Chart 4-3 Load Commissioning Software On Plane A 
    step Action Comments 
    1. Remove the ‘Write Protect” tab on the Commissioning 
    The diskette/tape and the HDMs 
    floppy diskette. are protected from corruption 
    since by default when tests are 
    If the commissioning software is stored on a cartridge run on these devices only 
    tape, then ensure that the RECORD tab is in the designated test pages are 
    RECORD position, 
    accessed by them. 
    2. Insert the commissioning floppy/tape in the external If the external storage device is an 
    storage device. FDU II, turn the latch to lock the 
    diskette in place. 
    3. Press and hold the PANEL ENABLE button on the The Main Controller executes a 
    Maintenance Panel, and press the PLANE A LOAD series of preloading tests. Refer to 
    button. Practice 9125-060-353-NA, 
    General Maintenance Information, 
    Note: DO NOT remove the diskette/tape from the for a description of the processor 
    external storage device. Both Main Controller card diagnostic tests. If errors 
    cards (on the redundant SX-2000 S system) occur, loading halts and an error 
    are trying to access the external storage code is returned on the Main 
    device. Controller numeric display. If an 
    error should occur, repeat step 3. 
    If the second loading attempt fails, 
    refer to Practice 
    9125-060-35O-NA, 
    Troubleshooting Procedures. 
    4. Check that the Maintenance Terminal returns the 
    following message: 
    SX-2000 (small) COMMISSIONING IN PROGRESS 
    (Date and name of load is output) 
    TIME: 0O:OO:OO 
    CONFIGURATION REPORT NOW BEING 
    GENERATED 
    5. 
    Check that after a delay, the system generates a The length of the delay is 
    configuration report for all installed cards. proportional to the number of 
    cabinets in the system. No output 
    appears at the terminal until all 
    cards are configured. 
    Refer to Appendix A., Table A2-1, 
    for an example of a configuration 
    report. 
    Page 1 of 2 
    264 4-6 Revision 0 912!!&60-204-NA Issue 1  
    						
    							m IA 
    SX-2000 S ICS Commissioning 
    Chart 4-3 Load Commissioning Software On Plane A 
    (continued) 
    and reinsert the incorrectly 
    configured card. Enter the 
    CONFIG command to generate a 
    new report, If the card still does 
    ONFIGURATION REPORT 
    ** ENTER  TO CONTINUE * 
    Press the space bar on the terminal. 
    returns the following message: 
    TIME 0O:nn:nn (where ‘n’ is a digit, O-9) 
    a bus error is likely to occur. The 
    system returns a bus error 
    indicating that the active Main Control is ready for 
    Any commands entered at the Maintenance Terminal 
    after this point require the Maintenance Terminal 
    RETURN key be pressed. Any command entered 
    hereafter is assumed to be terminated this way. message on the Maintenance 
    Terminal, including the address at 
    which the fault occurred. Note the 
    address and refer to Practice 
    9125-06%352-NA, Maintenance 
    Messages, to determine which 
    RAM card is faulty. Replace the 
    riate card and restart this 
    from step 3 before 
    completed, check that the display returns to a flashing 
    “11” indication. 
    10. Enter the following command: Enables the printing of error tables 
    for each test executed, in long 
    EPRINTL form (detailed tables). See 
    Appendix A., Table A2-6, for an 
    example. 
    11. Go to Chart 4-4 for commissioning tests. 
    Page 2 of 2 
    9125-060-204-NA Issue 1 
    Revision 0 
    204 4-7  
    						
    							Commissioning 
    Control and Peripheral Card Tests 
    4.3 The following chart details the steps required to perform Control and Peripheral 
    Interface card tests on Plane A of an SX-2000 S system. 
    Chart 4-4 SX-2000 S ICS Plane A Control and Peripheral Interface Card Tests 
    SW Actlon 
    Comments 
    1. 
    Enter the following commands to enable testing of the 
    mass storage devices: 
    EXTERNAL ON 
    HDM ON Enable external device testing; 
    Enable HDM testing; 
    MHDM ON 
    Enable mate HDM testing. 
    EXTERNAL ON test is not possible 
    if the write protect tab is in place on 
    the diskette or if the RECORD tab 
    is not in the RECORD position on 
    the cartridge tape. 
    By default, testing of mass storage devices is 
    disabled. Any of these commands can be 
    individually entered to enable 
    testing of a specific mass storage 
    device. 
    Testing of mass storage devices is 
    disabled by issuing one of the 
    following commands, as 
    appropriate: 
    EXTERNAL OFF 
    HDM OFF 
    MHDM OFF 
    2. 
    Enable testing of the Main and Peripheral Control 
    Subsystems by entering: 
    STEST 
    ETEST l-20 This enables testing of all cards in 
    slots 1 through 20 on the current 
    shelf, both Control cards and PICs. 
    The mass storage subsystem tests 
    are run when the slot 20 tests are 
    run. 
    3. 
    Set the number of test passes to 1 by entering the 
    Optional: the default number of 
    following command: 
    passes is 1. 
    PASS 1 
    4. 
    Start the test by entering: If the external device is a CTU the 
    TEST test will take approximately 30 
    If a slot passes the tests, the system responds with: minutes to complete. 
    0O:OO:OO 000 TEST COMPLETE - NO ERRORS ON Tests are executed from the lowest 
    SLOT NUMBER xx (shelf number) (cabinet number) to the highest slot. 
    (test number) (pass number) If errors are detected, error 
    and proceeds to test the next slot. messages are returned. Refer to 
    the Appendices for the messages 
    which may be encountered. 
    Page 1 of 3 
    204 4-6 
    Revision 0 9125-060-204-NA Issue 1  
    						
    							m Id 
    SX-2000 S ICS Commissioning 
    Chart 4-4 SX-2000 S ICS Plane A Control and Peripheral Interface Card Tests 
    (continued) 
    rrors on an 
    message 1s returne 
    external device appear against the 
    152 CARD NOT DETECTED - NO TEST RUN 17 Main Controller test. 
    (shelf number) (cabinet number) (test number) (pass 
    If a CR-II or CSM-II card or a PIC 
    fails a test, reinsert the failed card, 
    and rerun the test on that slot by 
    issuing the following command: 
    153 NO TEST AVAILABLE FOR THIS SLOT TEST (slot number) 
    These messages may be disregarded, since there is If the card in question fails again, 
    no testing available for any DSUs using 
    Commissioning software. 
    If the Main Controller must be 
    replaced, the system must be 
    restarted as described in 
    The system returns the following prompt, indicating 
    that Plane B is ready for testing: 
    If a Peripheral Switch Controller card is installed in 
    Shelf 2 of the Control Cabinet, enter the following 
    command to test it: The Plane B Peripheral Switch 
    Controller Card is only installed on 
    fully redundant systems. 
    If full redundancy is not provided 
    If the card passes the test, the system returns the on the system being 
    following message: commissioned, go to step 7. 
    0O:OO:OO 000 TEST COMPLETE - NO ERRORS ON Accessing Shelf 2 as a peripheral 
    SLOT NUMBER 16 01 02 (test number) 
    (pass shelf does not allow testing of the 
    other control cards (slots 17-20). 
    Suppress all previous testing. 
    Enable testing of slots 1 - 12. 
    Test cards in slots 1 - 12. 
    to the next slot. 
    messages are returned. Reinsert 
    the card and test again. Replace 
    Paae 2 of 3 
    9125-060-204-NA 
    Issue 1 Revision 0 
    204 4-9  
    						
    							Commissioning 
    Chart 4-4 SX-2000 S ICS Plane A Control and Peripheral Interface Card Tests 
    (continued) 
    SW Action Comments 
    a. If one or more Peripheral Cabinets is provided then To enable testing in another 
    repeat steps 6 and 7 for each shelf in each peripheral cabinet, enter the command: 
    cabinet. 
    SHELF (cabinet number), 
    (shelf number) 
    9. 
    Type “SHELF” to return to the  prompt. 
    Test all of the circuit switch links from the main control 
    to all of the peripheral shelves by entering the 
    following command: 
    TEST CIR LINKS 
    10. If Main Control redundancy is provided, go to 
    Chart 45. If the system is a non-redundant 
    configuration, go to Chart 4-6. 
    Page 3 of 3 
    load And Test Plane B And Mate links 
    4.4 Loading and testing of Plane B and its associated mate links on the SX-2000s 
    system is performed as described in the following chart. This procedure does not 
    apply to the not-t-redundant SX-2000s system since it only has one plane (Plane A). 
    ! Chart 4-5 SX-2000 S ICS Load and Test Plane B and Control Mate Links 
    step 
    Action Comments 
    1. On completion of the self-test, disconnect the 
    Maintenance Terminal from the TERMINAL A port on 
    the Maintenance Connector’s panel and connect it to 
    the TERMINAL 8 port. 
    2. Press and hold the PANEL ENABLE button on the 
    Maintenance Panel. Press the ACTIVITY SWITCH 
    button. Plane B is now active, and Plane A 
    is inactive. 
    3. 
    Hold down the PANEL ENABLE button and press the Commissioning software is loaded 
    PLANE B LOAD button. onto the Plane B Main Controller 
    from the external device. 
    - 
    Page 
    1 of 3 
    204 4-10 Revision 0 
    9125-060-204-NA Issue 1  
    						
    							m IA 
    SX-2000 S ICS Commissioning 
    Chart 4-5 SX-ZUOU S ICS Load and Test Plane B and Control Mate Links 
    (continued) 
    owing message: 
    SX-2000 (small) COMMISSIONING IN PROGRESS 
    (Date and name of load is output) 
    TIME: 0O:OO:OO 
    CONFIGURATION REPORT NOW BEING 
    ETEST l-20 Suppress all previous testing. 
    MATE LINK ON test, Commissioning must be 
    running and a maintenance 
    terminal must be connected to both 
    To disable the test, issue the command: 
    MATE LINK OFF 
    10. Test the Peripheral Mate Links in the first cabinet by It is not necessary to have both 
    issuing the following commands: main control planes since both 
    peripheral processors are 
    PERMATE LINK ON controlled by the active main 
    TEST 16 processor. 
    11. Enter the following command to enable testing of 
    Shelf 2 of the Control Cabinet: 
    SHELF 1,2 
    The system responds with:  
    Page 2 of 3 
    9125-060-204-NA Issue 1 Revision 0 
    204 4-11  
    						
    							Commissioning 
    Chart 4-5 SX-2000 S ICS Load and Test Plane B and Control Mate Links 
    (continued) 
    Step Action Comments 
    12. Test the Plane B Peripheral Switch Controller card by 
    entering the following command: 
    TEST 16 
    If the card passes the test, the system returns the 
    following message: 
    0O:OO:OO 000 TEST COMPLETE - NO ERRORS ON 
    SLOT NUMBER 16 01 02 (test number) (pass 
    number) 
    and then returns the peripheral prompt. 
    13. Begin testing of PlCs on Shelf 2 by entering: 
    STEST Suppress all previous testing. 
    ETEST 1-12 Enable testing of slots 1 - 12. 
    TEST Test cards in slots 1 - 12. 
    If the card passes the test, the system returns the 
    following message: 
    0O:OO:OO 000 TEST COMPLETE - NO ERRORS ON 
    SLOT NUMBER xx (cabinet number) (shelf number) If errors are detected, error 
    (test number) (pass number) messages are returned. Reinsert 
    the card and test again. Replace 
    and the system proceeds to the next slot. any cards which fail the second 
    test. 
    14. If one or more peripheral cabinets is provided, then 
    repeat steps 11 to 13 for each shelf in each peripheral 
    cabinet. 
    15. After all peripheral cabinets are tested, disable the 
    peripheral mate link tests, by issuing the command: 
    PERMATE LINK OFF 
    16. Go to Chart 4-6. 
    Page 3 of 3 
    204 4-12 Revision 0 9125-060-204-NA Issue 1  
    						
    							m IA 
    SX-2000 S ICS Commissioning 
    Maintenance Panel Commissioning 
    4.5 The following chart provides details on commissioning a maintenance panel on an 
    SX-2000 S system. 
    Chart 4-6 SX-2000 S Maintenance Panel Commissioning 
    TIVE plane on the Maintenance Connector 
    The system delivers the following message: 
    SYS ID MODULE PRESENT 
    Visual led test: Minor, Major, Criiical, All ON, OFF 
    Perform the following visual checks: 
    l Minor ALARM LED comes on and goes off. 
    0 Major ALARM LED comes on and goes off. 
    l Critical ALARM LED comes on and goes off. fro:Plane A in non-redundant 
    mber) (cabinet number) 
    SHOW PANEL 
    TERMINAL port on the Maintenance Connector panel 
    on the bottom rear of the Control Cabinet. Repeat 
    steps 2 through 4. 
    Page 1 of 2 
    9125-060-204-NA Issue 1 Revision 0 204 4-13  
    						
    							Commissioning 
    Chart 4-6 SX-2000 S Maintenance Panel Commissioning 
    (continued) 
    Step I Action Comments 
    I 
    6. Remove the commissioning diskette/tape from the 
    external device. 
    7;, Hardware commissioning is now complete. Refer to 
    Practice 9121-06&200, Installation, for software 
    installation. 
    Page 2 of 2 I 