1. 2. 3. 4. 5. Table of Contents INTRODUCTION General ................................................................... 204 l-l Reasonforlssue ........................................................... 204 l-l Error Reporting ............................................................. 204 l-l Extent of Fault Isolation ...................................................... 204 l-l Differences in Product Terminology ............................................. 204 l-2 COMMISSIONING TESTS General ................................................................... 204 2-1 Test Preparation ............................................................ 204 2-l SX-ZOU@ VS ICS COMMISSIONING Install Circuit Cards and Load Commissioning Software ............................. 204 3-l Control and Peripheral Card Tests .............................................. 204 3-5 Maintenance and Hard Disk (MHD) Card Commissioning ............................ 204 3-7 SX-2000 S ICS COMMISSIONING Install Circuit Cards ......................................................... 204 4-l Non-RedundantSystem .................................................. 204 4-l RedundantSystem ....................................................... 204 4-2 Load Commissioning Software ................................................. 204 4-6 Control and Peripheral Card Tests .............................................. 204 4-6 Load and Test Plane B and Mate Links .......................................... 204 4-10 Maintenance Panel Commissioning ............................................. 204 4-l 3 SX-2000 SC ICS Commissioning Install Circuit Cards ......................................................... 204 5-l Load Commissioning Software ................................................. 204 !5-4 Main and Subsystem Control Tests ............................................. 204 5-6 Peripheral Subsystem Tests ................................................... 204 5-8 Load and Test Plane B and Mate Links .......................................... 204 5-11 Maintenance Unit Commissioning .............................................. 204 5-13 . 6. SX-2000 FD ICS Commissioning Install Circuit Cards ......................................................... 204 6-l Non-Redundant Control Node .............................................. 204 6-l RedundantControlNode .................................................. 204 6-2 PeripheralNodes ........................................................ 204 6-3 DSU Nodes ............................................................ 204 64 Load Commissioning Software ................................................. 204 6-7 LinkConfiguration ....................................................... 204 6-9 Control and Peripheral Node Tests .............................................. 204 6-11 Load and Test Plane B and Mate Links .......................................... 204 6-14 Control Panel Commissioning ................................................. 204 6-l 6 9125-060-204-NA Issue 1 Revision 0 . . . III

Commissionina APPENDIX A. HUMAN/MACHINE INTERFACE (HMI) Al. Commissioning Software HMI .............................................. 204 A-l General ............................................................... 204 A-i Command Description .................................................... 204 A-l A2 Sample Reports. ........................................................ 204 A-9 Configuration Reports .................................................... 204 A-9 SHOW PANEL Command Output ........................................... 204 A-13 EPRINTS and EPRINTL Command Output .................................... 204 A-14 A3. HELP Command Output .................................................. 204 A-16 SX-2000VSSystem ..................................................... 204 A-16 SX-2000SSystem ...................................................... 204 A-17 SX-2000SG System ..................................................... 204 A-19 SX-2000FDSystem ..................................................... 204 A-20 A4. Commissioning Tests Performed on Control Cards .............................. 204 A-22 SX-2000 FD, VS, and S ICS Card Tests ...................................... 204 A-22 SX-2000SGICSCardTests ............................................... 204 A-24 A5. Error Code Displays ...................................................... 204 A-28 SX-2000 FD, S, and VS ICS ............................................... 204 A-28 SX-2000SGICS.. ...................................................... 204 A-31 List of Figures Figure 3-l SX-2000 VS Circuit Card Locations .................................. 204 3-4 Figure 4-1 SX-2000 S Circuit Card Locations ................................... 204 4-5 Figure 5-l SX-2000 SG Card Configuration .................................... 204 5-3 Figure 6-l SX-2000 FD Control Node Circuit Card Locations ....................... 204 6-5 Figure 6-2 SX-2000 FD Peripheral and DSU Node Circuit Card Locations ............. 204 6-6 List of Tables - Table l-l Table 6-l Table 6-2 Table Al -1 Table A2-1 Table A2-2 Table A23 Table A2-4 Table A2-5 Table A2-6 Table A2-7 Terminology Differences .......................................... .204 l-2 Link Configuration for a Non-Redundant SX-2000 FD System ............. .204 6-9 Link Configuration for a Redundant SX-2000 FD System ................. .204 6-l 0 Commissioning Software Commands ................................ .204 A-2 SX-2000 S ICS Sample Configuration Report ......................... .204 A-9 SX-2000 SG ICS Sample Configuration Report ........................ .204 A-l 0 SX-2000 SG ICS Sample Peripheral And DSU Configuration Report ........ 204 A-11 SX-2000 FD ICS Sample Configuration Report ........................ ,204 A-12 SX-2000 FD, S and VS ICS Sample SHOW PANEL Output .............. .204 A-13 SX-2000 SG ICS Sample SHOW PANEL Output ....................... ,204 A-13 SX-2000 SG ICS Sample SHOW PANEL N Output ..................... ,204 A-14 iv Revision 0 9125-060-204-NA Issue 1

Table A2-8 Table A2-9 Table A3-1 Table A3-2 Table A3-3 Table A34 Table A4-1 Table A4-2 Table 84-3 Table A4-4 Table A5-1 Table A5-2 Chart 3-l Chart 3-2 Chart 3-3 Chart 4-l Chart 4-2 Chart 4-3 Chart 4-4 Chart 4-5 Chart 4-6 Chart 5-1 Chart 5-2 Chart 5-3 Chart 5-4 Chart 5-5 Chart 5-6 Chart 6-l Chart 6-2 Chart 6-3 Chart 6-4 Chart 6-5 Chart 6-6 Chart 6-7 Chart 6-8 SX-2000 S ICS Sample EPRINTL Output ............................. 204 A-14 SX-2000 S ICS Sample EPRINTS Report ............................. 204 A-15 HELP Command Output for the SX-2000 VS System .................... 204 A-l 6 HELP Command Output for the SX-2000 S System ...................... 204 A-l 7 HELP Command Output for the SX-2000 SG System ..................... 204 A-l 9 HELP Command Output for the SX-2000 FD System ..................... 204 A-20 List of Commissioning Tests Performed On Each Control Card (SX-2OOOFD,VS, and S ICS) ....................................... 204 A-22 List Of Commissioning Tests Performed On Each Slot (SX-2000 SG ICS) ..... 204 A-24 List Of Commissioning Tests Performed On SX-2000 SG Peripheral Shelf Cards .......................................................... 204 A-27 List Of Commissioning Tests Performed On SX-2000 SG Maintenance Units . . 204 A-27 Error Code Summary on the SX-2000 FD, S and VS ICS ................. 204 A-28 Error Code Summary on the SX-2000 SG ICS .......................... 204 A-31 List of Charts Install Circuit Cards and Load Commissioning Software .................. 204 3-l SX-2UOOVS ICS Control and Peripheral Interface Card Tests ............ 204 3-5 SX-2OOOVS Maintenance and Hard Disk (MHD) Card Commissioning ..... 204 3-7 Install Circuit Cards on a Non-Redundant SX-2000 S ICS ............... 204 4-l Install Circuit Cards on a Redundant SX-2000 S ICS ................... 204 4-2 Load Commissioning Software On Plane A ............................ 204 4-6 SX-2000 S ICS Plane A Control and Peripheral Interface Card Tests ....... 204 4-6 SX-2000 S ICS Load And Test Plane B And Control Mate Links ........... 204 4-10 SX-2000 S Maintenance Panel Commissioning ........................ 204 4-13 Install Circuit Cards on the SX-2000 SG ICS .......................... 204 5-l Load Commissioning Software On Plane A ............................ 204 5-4 SX-2000 SG Main and Subsystem Control Tests ....................... 204 56 SX-2000 SG Peripheral Subsystem Tests ........................... 204 5-6 Load and Test Plane B and Control Mate Links ........................ 204 5-11 SX-2000 SG Maintenance Unit Commissioning ........................ 204 5-13 Install Circuit Cards in the SX-2000 FD ICS Non-Redundant Control Node . . 204 6-l Install Circuit Cards in the SX-2000 FD ICS Redundant Control Node ...... 204 6-2 Install Circuit Cards in the SX-2000 FD ICS Peripheral Nodes ............ 204 6-3 Install Circuit Cards in the SX-2000 FD ICS Peripheral Nodes ............ 204 6-4 Load Commissioning Software On Plane A ............................ 204 6-7 SX-2000 FD ICS Control and Peripheral NodeTests .................... 204 6-11 Load and Test Plane B and Control Mate Links ......................... 204 6-14 SX-2000 FD Control Panel Commissioning ........................... 204 6-l 6 912W60-204-NA Issue 1 Revision 0 V

1 ’ INTRODUCTION 1.1 This Section outlines the steps involved in commissioning all variants of the SX-20008 Integrated CommunicationsTM System. The procedures in this Section consist of configuring and testing the major components of the system using a specially designed commissioning software package. Reason for Issue 1.2 This document is issued to provide commissioning procedures for the SX-2000 integrated Communications System. Documentation contained within this section reflects the contents of release of MS2006. Error Reporting 1.3 Two methods are provided for reporting errors in the system: the Maintenance Terminal, and the numeric displays located on each subsystem processor card. Normally, the Maintenance Terminal is the output used for error messages while the numeric displays show error codes in the event of a processor-related fault. When power is applied to a subsystem, or when a processor is reset, a resident processor self-test is executed. Errors detected during this self-test are only displayed on the subsystem processor numeric display and are not passed on to any other output device. Should an error occur during the commissioning procedure, error messages are delivered to the Maintenance Terminal. The same information is also stored in a Commissioning Error Log, which can be read at the Maintenance Terminal at any time for subsequent analysis. If a printer is connected, a hard copy of the logs can be generated. Extent of Fault Isolation 1.4 Faults are isolated down to the field-replaceable unit (FRU) level by using the built-in test facilities. However, a component on the FRU (e.g., an integrated circuit chip on a memory card) will not be identified. To correct such a fault, the entire FRU is replaced. 912!5-060-204-NA Issue 1 Revision 0 204 l-l

Commissioning Differences in Product Terminology 1.5 This document uses terminology which is common to the SX-2000 S system. However, where differences in terminology exist, a cross-reference to Table I-1, which lists the terms in this document which differ between product variants, will be given. Table l-l Terminology Differences SX-2000 FD ICS sx-2000 vs ICS sx-2000 s ICS SX-2000 SG ICS See Note 1. See Note 1. Floppy Disk Unit II (FDU ll)*. Floppy Disk Unit (FDU) Cartridge Tape Cartridge Tape Unit CTU Drive (CW Hard Disk Drive Hard Disk Hard Disk Module (HDM)** Hard Disk Unit (HDU) Control Panel Maintenance & Hard Maintenance Panel Maintenance Unit Disk Unit (MHD) Main Controller II MC II Main Controller or MC II (MC II) System Processor or MC II Peripheral Switch See Note 3. PSC Controller (PSC) Peripheral Switch Processor PANEL ENABLE PANEL ENABLE PANEL ENABLE PANEL SWITCH ENABLE RESET A LOAD PLANE A LOAD PLANE A LOAD SOURCE5* RESET B See Note 4. PLANE B LOAD PLANE B LOAD SOURCE5- ACTIVITY See Note 4. ACTIVITY SWITCH ACTIVITY TRANSFER SW ITCH Notes: 1. The SX-ZOOOVS and SX-2000 FD systems load from a cartridge tape, not a floppy diskette. There is no floppy disk drive for either system. 2. The SX-2000s system loads from the Hard Disk when the FDU II is not connected. 3. No Peripheral Switch Controller is required on the SX-2000VS system. 4. The SX-2000VS system is non-redundant. There is no Plane B, and an activity switch is not possible. 5. On the SX-2000SG system, PLANE ‘x’ LOAD SOURCE 1 refers to the hard disk unit, and PLANE ‘x’ LOAD SOURCE 2 refers to the floppy disk drive. 204 l-2 Revision 0 9125-060-204-NA Issue 1

2 ’ COMMISSIONING TESTS General 2.1 In order to simplify fault isolation and correction, the system is powered up in stages. Control cards are powered up first. Once these cards are operational, a special off-line commissioning test program is downloaded from cartridge tape or floppy diskette. The commissioning test program is provided for the SX-2000 SG system on a floppy diskette. The program is downloaded to the system from a Floppy Disk Unit (FDU). The commissioning test program is provided for the SX-2000 S system on either a floppy diskette or a cartridge tape. The commissioning software is downloaded to the system from diskette in the Floppy Disk Unit II (FDU II), or from cartridge tape in the Cartridge Tape Unit (CTU). A CTU may only be used if a Main Controller II card is installed in the system. The commissioning test program is provided for the SX-ZOOOVS and FD systems on a cartridge tape. The program is downloaded to the SX-ZOOOVS system from a CTU, and from an internal cartridge tape drive for the SX-2000 FD system. Standalone tests are performed on control cards and the off-line commissioning test program begins to run as soon as the download is completed. Test Preparation 2.2 The standalone hardware tests should be performed with no peripheral interface cabling (Tip and Ring cables) connected, to verify the correct operation of the system hardware. Refer to Mite1 Practices 912x-060-200-NA, Installation, and perform the verification and preparation procedures before proceeding to the following charts. To avoid possible damage to the system electronics due to static discharge, the installer must wear an antistatic wrist strap. 912!3-060-204-NA Issue 1 Revision 0 204 2-l

204 2-2 Revision 0 9125-060-204-NA issue 1 Commissioning I

3 . sx-2000 vs ICS COMMISSIONING Install Circuit Cards and load Commissioning Software Ensure that the Main and Peripheral Control cards, and Peripheral Interface and DSU cards are installed in the correct card slots before loading the commissioning software. The following chart describes the card installation procedure, and details the steps required to load commissioning software on the SX-ZOUOVS system. The SX-2OOOVS system has only one plane (Plane A). Chart 3-l Install Circuit Cards and Load Commissioning Sofhvare Shelf 1: slots 9 throu on the numeric display, reinsert the card. Reset the card by pressing PANEL ENABLE and LOAD on the faceplate of the MHD card. If the card fails f-test a second time, replace it. s are run on Page 1 of 3 9125--060-204-NA Issue 1 Revision 0 204 3-l

Commissioning Chart 3-l Install Circuit Cards and Load Commissioning Software (continued) Step Action Comments 7. Insert the commissioning tape in the Cartridge Tape Unit (CTU). 8;’ Press and hold the PANEL ENABLE button on the The MC II card executes a series MHD card, and press the LOAD button. of preloading tests. Refer to Practice 9125-060-353-NA, Note: DO NOT remove the tape from the CTU. The General Maintenance Information, MC II card is trying to access the CTU. for a description of the processor card diagnostic tests. If errors occur, loading halts and an error code is returned on the MC II card numeric display. If an error should occur, repeat step 8. If the second loading attempt fails, refer to Practice 9125-060-35&NA, Troubleshooting Procedures. 9. Check that the Maintenance Terminal returns the following message: SX-2000 (VS) COMMISSIONING IN PROGRESS (Date and name of load is output) TIME: 0O:OO:OO CONFIGURATION REPORT NOW BEING GENERATED 10. Check that after a delay, the system outputs a The length of the delay is configuration report. proportional to the number of Refer to Appendix A., Table A2-1, for an example of a cabinets in the system. No output configuration report. appears at the terminal until all cards are configured. 11. Check the configuration report against the cards Should the configuration report not actually installed in the system. match the cards installed, remove and reinsert the incorrectly configured card. Enter the CONFIG command to generate a new report. If the card still does not appear correctly, backplane or connector problems are indicated. Page 2 of 3 204 3-2 Revision 0 9125-060-204-NA Issue 1