Home > Mitel > Communications System > Mitel Sx-2000 Integrated Communications System Control Sheet Manual

Mitel Sx-2000 Integrated Communications System Control Sheet Manual

    Download as PDF Print this page Share this page

    Have a look at the manual Mitel Sx-2000 Integrated Communications System Control Sheet Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 55 Mitel manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    Page
    of 526
    							1. 
    2. 
    3. 
    4. 
    5. Table of Contents 
    INTRODUCTION 
    General ................................................................... 204 l-l 
    Reasonforlssue ........................................................... 204 l-l 
    Error Reporting ............................................................. 204 l-l 
    Extent of Fault Isolation ...................................................... 204 l-l 
    Differences in Product Terminology ............................................. 204 l-2 
    COMMISSIONING TESTS 
    General ................................................................... 204 2-1 
    Test Preparation ............................................................ 204 2-l 
    SX-ZOU@ VS ICS COMMISSIONING 
    Install Circuit Cards and Load Commissioning Software ............................. 204 3-l 
    Control and Peripheral Card Tests .............................................. 204 3-5 
    Maintenance and Hard Disk (MHD) Card Commissioning ............................ 204 3-7 
    SX-2000 S ICS COMMISSIONING 
    Install Circuit Cards ......................................................... 204 4-l 
    Non-RedundantSystem .................................................. 204 4-l 
    RedundantSystem ....................................................... 204 4-2 
    Load Commissioning Software ................................................. 204 4-6 
    Control and Peripheral Card Tests .............................................. 204 4-6 
    Load and Test Plane B and Mate Links .......................................... 204 4-10 
    Maintenance Panel Commissioning ............................................. 204 4-l 3 
    SX-2000 SC ICS Commissioning 
    Install Circuit Cards ......................................................... 204 5-l 
    Load Commissioning Software ................................................. 204 !5-4 
    Main and Subsystem Control Tests ............................................. 204 5-6 
    Peripheral Subsystem Tests ................................................... 204 5-8 
    Load and Test Plane B and Mate Links .......................................... 204 5-11 
    Maintenance Unit Commissioning .............................................. 204 5-13 
    . 
    6. SX-2000 FD ICS Commissioning 
    Install Circuit Cards ......................................................... 204 6-l 
    Non-Redundant Control Node .............................................. 204 6-l 
    RedundantControlNode .................................................. 204 6-2 
    PeripheralNodes ........................................................ 204 6-3 
    DSU Nodes ............................................................ 204 64 
    Load Commissioning Software ................................................. 204 6-7 
    LinkConfiguration ....................................................... 204 6-9 
    Control and Peripheral Node Tests .............................................. 204 6-11 
    Load and Test Plane B and Mate Links .......................................... 204 6-14 
    Control Panel Commissioning ................................................. 204 6-l 6 
    9125-060-204-NA Issue 1 
    Revision 0 
    . . . 
    III  
    						
    							Commissionina 
    APPENDIX A. HUMAN/MACHINE INTERFACE (HMI) 
    Al. Commissioning Software HMI 
    .............................................. 204 A-l 
    General 
    ............................................................... 204 A-i 
    Command Description 
    .................................................... 204 A-l 
    A2 Sample Reports. 
    ........................................................ 204 A-9 
    Configuration Reports 
    .................................................... 
    204 A-9 
    SHOW PANEL Command Output 
    ........................................... 204 A-13 
    EPRINTS and EPRINTL Command Output 
    .................................... 204 A-14 
    A3. HELP Command Output 
    .................................................. 204 A-16 
    SX-2000VSSystem ..................................................... 
    204 A-16 
    SX-2000SSystem ...................................................... 204 A-17 
    SX-2000SG System 
    ..................................................... 204 A-19 
    SX-2000FDSystem ..................................................... 204 A-20 
    A4. Commissioning Tests Performed on Control Cards 
    .............................. 204 A-22 
    SX-2000 FD, VS, and S ICS Card Tests 
    ...................................... 204 A-22 
    SX-2000SGICSCardTests ............................................... 
    204 A-24 
    A5. Error Code Displays 
    ...................................................... 204 A-28 
    SX-2000 FD, S, and VS ICS 
    ............................................... 204 A-28 
    SX-2000SGICS.. ...................................................... 
    204 A-31 
    List of Figures 
    Figure 3-l SX-2000 VS Circuit Card Locations 
    .................................. 204 3-4 
    Figure 4-1 SX-2000 S Circuit Card Locations 
    ................................... 204 4-5 
    Figure 5-l SX-2000 SG Card Configuration 
    .................................... 204 5-3 
    Figure 6-l SX-2000 FD Control Node Circuit Card Locations 
    ....................... 204 6-5 
    Figure 6-2 SX-2000 FD Peripheral and DSU Node Circuit Card Locations 
    ............. 204 6-6 
    List of Tables 
    - 
    Table l-l 
    Table 6-l 
    Table 6-2 
    Table Al -1 
    Table A2-1 
    Table A2-2 
    Table A23 
    Table A2-4 
    Table A2-5 
    Table A2-6 
    Table A2-7 Terminology Differences 
    .......................................... .204 l-2 
    Link Configuration for a Non-Redundant SX-2000 FD System ............. .204 6-9 
    Link Configuration for a Redundant SX-2000 FD System ................. .204 6-l 0 
    Commissioning Software Commands 
    ................................ .204 A-2 
    SX-2000 S ICS Sample Configuration Report 
    ......................... .204 A-9 
    SX-2000 SG ICS Sample Configuration Report 
    ........................ .204 A-l 0 
    SX-2000 SG ICS Sample Peripheral And DSU Configuration Report ........ 204 A-11 
    SX-2000 FD ICS Sample Configuration Report ........................ ,204 A-12 
    SX-2000 FD, S and VS ICS Sample SHOW PANEL Output .............. .204 A-13 
    SX-2000 SG ICS Sample SHOW PANEL Output 
    ....................... ,204 A-13 
    SX-2000 SG ICS Sample SHOW PANEL N Output 
    ..................... ,204 A-14 
    iv 
    Revision 0 9125-060-204-NA Issue 1  
    						
    							Table A2-8 
    Table A2-9 
    Table A3-1 
    Table A3-2 
    Table A3-3 
    Table A34 
    Table A4-1 
    Table A4-2 
    Table 84-3 
    Table A4-4 
    Table A5-1 
    Table A5-2 
    Chart 3-l 
    Chart 3-2 
    Chart 3-3 
    Chart 4-l 
    Chart 4-2 
    Chart 4-3 
    Chart 4-4 
    Chart 4-5 
    Chart 4-6 
    Chart 5-1 
    Chart 5-2 
    Chart 5-3 
    Chart 5-4 
    Chart 5-5 
    Chart 5-6 
    Chart 6-l 
    Chart 6-2 
    Chart 6-3 
    Chart 6-4 
    Chart 6-5 
    Chart 6-6 
    Chart 6-7 
    Chart 6-8 SX-2000 S ICS Sample EPRINTL Output 
    ............................. 204 A-14 
    SX-2000 S ICS Sample EPRINTS Report 
    ............................. 204 A-15 
    HELP Command Output for the SX-2000 VS System 
    .................... 204 A-l 6 
    HELP Command Output for the SX-2000 S System 
    ...................... 204 A-l 7 
    HELP Command Output for the SX-2000 SG System 
    ..................... 204 A-l 9 
    HELP Command Output for the SX-2000 FD System 
    ..................... 204 A-20 
    List of Commissioning Tests Performed On Each Control Card 
    (SX-2OOOFD,VS, and S ICS) 
    ....................................... 204 A-22 
    List Of Commissioning Tests Performed On Each Slot (SX-2000 SG ICS) ..... 204 A-24 
    List Of Commissioning Tests Performed On SX-2000 SG Peripheral Shelf 
    Cards .......................................................... 
    204 A-27 
    List Of Commissioning Tests Performed On SX-2000 SG Maintenance Units 
    . . 204 A-27 
    Error Code Summary on the SX-2000 FD, S and VS ICS 
    ................. 204 A-28 
    Error Code Summary on the SX-2000 SG ICS 
    .......................... 204 A-31 
    List of Charts 
    Install Circuit Cards and Load Commissioning Software .................. 204 3-l 
    SX-2UOOVS ICS Control and Peripheral Interface Card Tests 
    ............ 204 3-5 
    SX-2OOOVS Maintenance and Hard Disk (MHD) Card Commissioning 
    ..... 204 3-7 
    Install Circuit Cards on a Non-Redundant SX-2000 S ICS ............... 204 4-l 
    Install Circuit Cards on a Redundant SX-2000 S ICS 
    ................... 204 4-2 
    Load Commissioning Software On Plane A 
    ............................ 204 4-6 
    SX-2000 S ICS Plane A Control and Peripheral Interface Card Tests 
    ....... 204 4-6 
    SX-2000 S ICS Load And Test Plane B And Control Mate Links ........... 204 4-10 
    SX-2000 S Maintenance Panel Commissioning 
    ........................ 204 4-13 
    Install Circuit Cards on the SX-2000 SG ICS 
    .......................... 204 5-l 
    Load Commissioning Software On Plane A 
    ............................ 204 5-4 
    SX-2000 SG Main and Subsystem Control Tests 
    ....................... 204 56 
    SX-2000 SG Peripheral Subsystem Tests 
    ........................... 204 5-6 
    Load and Test Plane B and Control Mate Links 
    ........................ 204 5-11 
    SX-2000 SG Maintenance Unit Commissioning 
    ........................ 204 5-13 
    Install Circuit Cards in the SX-2000 FD ICS Non-Redundant Control Node . . 204 6-l 
    Install Circuit Cards in the SX-2000 FD ICS Redundant Control Node 
    ...... 204 6-2 
    Install Circuit Cards in the SX-2000 FD ICS Peripheral Nodes ............ 204 6-3 
    Install Circuit Cards in the SX-2000 FD ICS Peripheral Nodes 
    ............ 204 6-4 
    Load Commissioning Software On Plane A 
    ............................ 204 6-7 
    SX-2000 FD ICS Control and Peripheral NodeTests 
    .................... 204 6-11 
    Load and Test Plane B and Control Mate Links 
    ......................... 204 6-14 
    SX-2000 FD Control Panel Commissioning 
    ........................... 204 6-l 6 
    912W60-204-NA Issue 1 
    Revision 0 
    V  
    						
    							Commissioning 
    vi 
    Revision 0 9125-06&204-NA Issue 1  
    						
    							1 
    ’ INTRODUCTION 
    1.1 This Section outlines the steps involved in commissioning all variants of the 
    SX-20008 Integrated CommunicationsTM System. The procedures in this Section 
    consist of configuring and testing the major components of the system using a 
    specially designed commissioning software package. 
    Reason for Issue 
    1.2 This document is issued to provide commissioning procedures for the SX-2000 
    integrated Communications System. Documentation contained within this section 
    reflects the contents of release of MS2006. 
    Error Reporting 
    1.3 Two methods are provided for reporting errors in the system: the Maintenance 
    Terminal, and the numeric displays located on each subsystem processor card. 
    Normally, the Maintenance Terminal is the output used for error messages while the 
    numeric displays show error codes in the event of a processor-related fault. 
    When power is applied to a subsystem, or when a processor is reset, a resident 
    processor self-test is executed. Errors detected during this self-test are only displayed 
    on the subsystem processor numeric display and are not passed on to any other output 
    device. 
    Should an error occur during the commissioning procedure, error messages are 
    delivered to the Maintenance Terminal. The same information is also stored in a 
    Commissioning Error Log, which can be read at the Maintenance Terminal at any time 
    for subsequent analysis. If a printer is connected, a hard copy of the logs can be 
    generated. 
    Extent of Fault Isolation 
    1.4 
    Faults are isolated down to the field-replaceable unit (FRU) level by using the built-in 
    test facilities. However, a component on the FRU (e.g., an integrated circuit chip on a 
    memory card) will not be identified. To correct such a fault, the entire FRU is 
    replaced. 
    912!5-060-204-NA Issue 1 Revision 0 204 l-l  
    						
    							Commissioning 
    Differences in Product Terminology 
    1.5 
    This document uses terminology which is common to the SX-2000 S system. 
    However, where differences in terminology exist, a cross-reference to Table I-1, 
    which lists the terms in this document which differ between product variants, will be 
    given. 
    Table l-l Terminology Differences 
    SX-2000 FD ICS 
    sx-2000 vs ICS sx-2000 s ICS SX-2000 SG ICS 
    See 
    Note 1. See Note 1. Floppy Disk Unit II 
    (FDU ll)*. Floppy Disk Unit (FDU) 
    Cartridge Tape Cartridge Tape Unit 
    CTU 
    Drive 
    (CW 
    Hard Disk Drive Hard Disk 
    Hard Disk Module 
    (HDM)** Hard Disk Unit (HDU) 
    Control Panel 
    Maintenance & Hard Maintenance Panel Maintenance Unit 
    Disk Unit (MHD) 
    Main Controller II MC II 
    Main Controller or MC II 
    (MC II) System Processor or MC II 
    Peripheral Switch See Note 3. 
    PSC 
    Controller (PSC) Peripheral Switch 
    Processor 
    PANEL ENABLE PANEL ENABLE 
    PANEL ENABLE PANEL SWITCH ENABLE 
    RESET A LOAD 
    PLANE A LOAD PLANE A LOAD SOURCE5* 
    RESET B See Note 4. 
    PLANE B LOAD PLANE B LOAD SOURCE5- 
    ACTIVITY See Note 4. 
    ACTIVITY SWITCH ACTIVITY TRANSFER 
    SW ITCH 
    Notes: 1. The SX-ZOOOVS and SX-2000 FD systems load from a cartridge tape, not a floppy diskette. There is no 
    floppy disk drive for either system. 
    2. The SX-2000s system loads from the Hard Disk when the FDU II is not connected. 
    3. No Peripheral Switch Controller is required on the SX-2000VS system. 
    4. The SX-2000VS system is non-redundant. There is no Plane B, and an activity switch is not possible. 
    5. On the SX-2000SG system, PLANE ‘x’ LOAD SOURCE 1 refers to the hard disk unit, and PLANE ‘x’ 
    LOAD SOURCE 2 refers to the floppy disk drive. 
    204 l-2 
    Revision 0 9125-060-204-NA Issue 1  
    						
    							2 
    ’ COMMISSIONING TESTS 
    General 
    2.1 In order to simplify fault isolation and correction, the system is powered up in stages. 
    Control cards are powered up first. Once these cards are operational, a special 
    off-line commissioning test program is downloaded from cartridge tape or floppy 
    diskette. 
    The commissioning test program is provided for the SX-2000 SG system on a floppy 
    diskette. The program is downloaded to the system from a Floppy Disk Unit (FDU). 
    The commissioning test program is provided for the SX-2000 S system on either a 
    floppy diskette or a cartridge tape. The commissioning software is downloaded to the 
    system from diskette in the Floppy Disk Unit II (FDU II), or from cartridge tape in the 
    Cartridge Tape Unit (CTU). A CTU may only be used if a Main Controller II card is 
    installed in the system. 
    The commissioning test program is provided for the SX-ZOOOVS and FD systems on 
    a cartridge tape. The program is downloaded to the SX-ZOOOVS system from a CTU, 
    and from an internal cartridge tape drive for the SX-2000 FD system. 
    Standalone tests are performed on control cards and the off-line commissioning test 
    program begins to run as soon as the download is completed. 
    Test Preparation 
    2.2 The standalone hardware tests should be performed with no peripheral interface 
    cabling (Tip and Ring cables) connected, to verify the correct operation of the system 
    hardware. 
    Refer to Mite1 Practices 912x-060-200-NA, Installation, and perform the verification 
    and preparation procedures before proceeding to the following charts. 
    To avoid possible damage to the system electronics due to static discharge, the 
    installer must wear an antistatic wrist strap. 
    912!3-060-204-NA Issue 1 Revision 0 204 2-l  
    						
    							204 2-2 
    Revision 0 9125-060-204-NA issue 1  Commissioning 
    I  
    						
    							3 . 
    sx-2000 vs ICS 
    COMMISSIONING 
    Install Circuit Cards and load Commissioning Software 
    Ensure that the Main and Peripheral Control cards, and Peripheral Interface and 
    DSU cards are installed in the correct card slots before loading the commissioning 
    software. The following chart describes the card installation procedure, and details 
    the steps required to load commissioning software on the SX-ZOUOVS system. The 
    SX-2OOOVS system has only one plane (Plane A). 
    Chart 3-l Install Circuit Cards and Load Commissioning Sofhvare 
    Shelf 1: slots 9 throu 
    on the 
    numeric display, reinsert 
    the card. Reset the card by 
    pressing PANEL ENABLE and 
    LOAD on the faceplate of the 
    MHD card. If the card fails 
    f-test a second time, replace it. 
    s are run on 
    Page 
    1 of 3 
    9125--060-204-NA Issue 1 
    Revision 0 204 3-l  
    						
    							Commissioning 
    Chart 3-l Install Circuit Cards and Load Commissioning Software 
    (continued) 
    Step Action Comments 
    7. Insert the commissioning tape in the Cartridge Tape 
    Unit (CTU). 
    8;’ Press and hold the PANEL ENABLE button on the The MC II card executes a series 
    MHD card, and press the LOAD button. of preloading tests. Refer to 
    Practice 9125-060-353-NA, 
    Note: DO NOT remove the tape from the CTU. The General Maintenance Information, 
    MC II card is trying to access the CTU. for a description of the processor 
    card diagnostic tests. 
    If errors occur, loading halts and 
    an error code is returned on the 
    MC II card numeric display. 
    If an error should occur, repeat 
    step 8. If the second loading 
    attempt fails, refer to Practice 
    9125-060-35&NA, 
    Troubleshooting Procedures. 
    9. Check that the Maintenance Terminal returns the 
    following message: 
    SX-2000 (VS) COMMISSIONING IN PROGRESS 
    (Date and name of load is output) 
    TIME: 0O:OO:OO 
    CONFIGURATION REPORT NOW BEING 
    GENERATED 
    10. Check that after a delay, the system outputs a The length of the delay is 
    configuration report. proportional to the number of 
    Refer to Appendix A., Table A2-1, for an example of a cabinets in the system. No output 
    configuration report. appears at the terminal until all 
    cards are configured. 
    11. Check the configuration report against the cards Should the configuration report not 
    actually installed in the system. match the cards installed, remove 
    and reinsert the incorrectly 
    configured card. Enter the 
    CONFIG command to generate a 
    new report. If the card still does 
    not appear correctly, backplane or 
    connector problems are indicated. 
    Page 2 of 3 
    204 3-2 Revision 0 9125-060-204-NA Issue 1  
    						
    All Mitel manuals Comments (0)

    Related Manuals for Mitel Sx-2000 Integrated Communications System Control Sheet Manual