SX-2000 SG ICS Commissioning load and Test Plane B and Mate links Loading and testing of Plane B and its associated mate links on the SX-2000 SG system is performed as described in the following chart. Chart 54 Load and Test Plane B and Control Mate Links Maintenance Terminal from the TERMINAL A port on ector panel and connect it to the press the PLANE B LOAD SOURCE button. following message: The SX-2000 SG system has the following load sources: LOAD SOURCE 1 -hard disk LOAD SOURCE 2 -flo SX-2000 COMMISSIONING IN PROGRESS (Date and name of load is output) TIME: 0O:OO:OO CONFIGURATION REPORT NOW BEING The configuration report is followed by the prompt: ENTER SPACE TO CONFIG PERIPHERALS, TO RETURN TO COMMAND MODE> Press the terminal space bar. The system responds with: Refer to Appendix A., PERIPHERAL SWITCH HARDWARE Table A2-3, for an example of a CONFIGURATION IN PROGRESS peripheral and DSU configuration report. Page 1 of 2 9125-060-204-NA Issue 1 Revision 0 204 5-11
![](/img/blank.gif)
Commissioning Chart 5-5 Load and Test Plane B and Control Mate Links (continued) Step Action Comments 6. Enable long-form printing of messages by issuing the See Appendix A., Table A2-8, for EPRINTL command at Maintenance Terminal when the prompt appears. an example of the EPRINTL command output. 7. Test Plane B Control Cards by issuing the following commands: STEST ETEST 1-25 TEST Suppress all previous testing. Enable testing of slots 1 - 25. Test cards in enabled slots. a. If errors occur during testing of any slot, remove and reinsert the card and retest. Replace any cards which fail the second test. 9. Test the main control mate links by issuing the following To run the main control mate link commands on both planes simultaneously: test, Commissioning must be running and a maintenance MATE ON terminal must be connected to TEST 8 both planes at once. To disable the test, issue the command: MATE OFF 10. Test the Peripheral Mate Links in the first cabinet by It is not necessary to have both issuing the following commands: main control planes since both peripheral processors are SHELF 1,3 controlled by the active main PERMATE ON processor. TEST 29 11. If one or more peripheral cabinets is provided, then repeat step 10 for each shelf pair in each peripheral cabinet. 12. After all peripheral cabinets have been tested, disable the peripheral mate link test by issuing the command: PERMATE OFF 13. Type “SHELF” to obtain “” prompt. 14. Go to Chart 5-6. Page 2 of 2 204 5-12 Revision 0 9125-060-204-NA Issue 1
![](/img/blank.gif)
SX-2000 SG ICS Commissioning Maintenance Unit Commissioning 5.6 Commissioning of the maintenance unit is performed on the SX-2000 SG system as described in the following chart, Note: In the following procedure, the terms ‘unit’ and ‘panel’ are interchangeable. Chart 5-6 SX-2000 SG Maintenance Unit Commissioning Connector panel on the Control Cabinet. Enzire that the printer is on-line and ready to print. should be set for: - 8 data biis Maintenance Unit commissioning software is loaded from the commissioning diskette. Once loaded, the -the printer prints 20 lines of data. -the MINOR ALARM LED turns ON, then OFF -the MAJOR ALARM LED turns ON, then OFF. -the REMOTE ALARM LED turns ON, then OFF. -the following test message is scrolled across the Maintenance Unit display: -the Power Fail Transfer relays are operated. -the fan speed is set to low, then high for each An audible click is heard as each -when the tests are complete, the following message appears on the Maintenance Terminal: TEST COMPLETE, NO ERRORS ON SLOT NUMBER (SLOT “), (SHELF *), (CAB 01)) (TEST 00), (PASS 0001) If an error is detected, make note of the error and refer to Practice 9125-060-35O-NA, Troubleshooting. Page 1 of 2 912!5-060-204-NA Issue 1 Revision 0 204 5-13
![](/img/blank.gif)
Commissioning Chart 5-6 SX-ZUOU SG Maintenance Unit Commissioning (continued) Step Action Comments 4. Enter the following command: Refer to Appendix A., Table A2-6, for an example of the SHOW SHOW PANEL PANEL display. Check that the Maintenance Terminal displays the status of the Maintenance Unit. 5. Enter the following command: SHOW PANEL N (Where N is the desired maintenance unit number) Check that the Maintenance Terminal displays the status of the Maintenance Unit specified. 6. Switch activity to Plane A, connect the Maintenance Refer to Appendix A., Table A2-6 Terminal to the TERMINAL A port on the Maintenance for an example of the SHOW Connector panel of the Control Cabinet, and repeat PANEL N display. steps 2 through 5. 7. Remove the commissioning diskette from the Floppy Disk Unit. 8. Hardware commissioning is now complete. Refer to Practice 9120-060-200, Installation, for software installation. Page 2 of 2 204 5-14 Revision 0 9125-060-204-NA Issue 1
![](/img/blank.gif)
6 ’ SX-2000FD ICS COMMISSIONING Install Circuit Cards Non-Redundant Control Node 6.1 Ensure that the Main Control cards and Fiber Interface Modules are installed in the correct card slots before loading the commissioning software. Chart 6-1 describes the card installation procedure for the Non-redundant Control Node of the SX-2ooo FD system. The procedure for a Redundant Control Node is shown in the next chart, Chart 6-2. Chart 6-l Install Circuit Cards in the SX-2UOU FD ICS Non-Redundant Control Node l Main Controller II Card: Shelf 1, Slot 1 * Control Resource Card: Shelf 1, Slot 2 l Fiber Interface Modules: Shelf 2, Slots l-4, as card does not begin self-test, or if errors are indicated on the numeric display, reinsert the card. Reset the MC II card by pressing PANEL ENABLE and RESET A on the Maintenance Panel. If the card fails self-test a second time, 912!5-060-204-NA Issue 1 Revision 0 204 6-l
![](/img/blank.gif)
Commissioning Redundant Control Node Ensure that the Main Control cards and Fiber interface Modules are installed in the correct card slots before loading the commissioning software. Chart 6-2 describes the card installation procedure for the Redundant Control Node. Chart 6-2 Install Circuit Cards in the SX-2000 FD ICS Redundant Control Node Step Action Comments 1. Ensure the following cards are installed in the Control Refer to Figure 6-l. Node: l Plane A Main Controller II Card: Shelf 1, Slot 2 l Plane A Control RAM II Card: Shelf 1, Slot 3 l Plane A Circuit Switch Matrix II Card: Shelf I, Slot 4 l Plane B Circuit Switch Matrix II Card: Shelf 1, Slot 5 l Plane B Control RAM II Card: Shelf 1, Slot 6 l Plane B Main Controller II Card: Shelf 1, Slot 7 l Control Resource Card: Shelf 1, Slot 8 l Fiber Interface Modules: Shelf 3, Slots I-II, as required 2. Apply power to the Control Node by setting the two PSU power switches on the node backplate to ON. 3. Check that the Main Controller II (MC II) cards and If an MC II or Control Resource the Control Resource card begin power-up self tests. card does not begin self-test, or if errors are indicated on the numeric display, reinsert the card. Reset the MC II card by pressing PANEL ENABLE and RESET A (or RESET B for the Plane B MC II card) on the Maintenance Panel. If the card fails self-test a second time, replace it. Power-up self tests are only performed when power is first applied to installed cards. 4. Proceed to Chart 6-3 for installation of cards in the Peripheral Node(s). 204 6-2 Revision 0 9125-060-204-NA Issue 1
![](/img/blank.gif)
r m IA SX-2000 FD ICS Commissioning Peripheral Nodes Ensure that the Peripheral Control cards, Peripheral Interface cards, and one Fiber Interface Module are installed in the correct card slots in each Peripheral Node before loading the commissioning software. Chart S--S describes the card installation procedure for the Peripheral Node. Chart 63 Install Circuit Cards in the SX-2000 FD ICS Peripheral Nodes . Fiber Interface Module: Shelf 1, Slot 17 l Peripheral Resource Card: Shelf 2, Slot 17 ower switches on th indicated on the numeric display, reinsert the card. If the card fails self-test a second time, replace it. 9125-060-204-NA Issue 1 Revision 0 204 6-3
![](/img/blank.gif)
Commissioning DSU Nodes Ensure that the Peripheral Resource cards, Digital Service Unit (DSU) cards, and Fiber Interface Module(s) are installed in the correct card slots in each DSU Node before loading the commissioning software. Chart 6-4 describes the card installation procedure for the DSU Nodes, Chart &4 Install Circuit Cards in the SX-2000 FD ICS Peripheral Nodes Step Action Comments 1. Ensure that the following cards are installed in the first Refer to Figure 6-2. DSU Node: Leave all other cards (except filler l Fiber Interface Module: Shelf 1, Slot 1 plates) uninstalled. l Peripheral Resource Cards: Shelf 2, Slot 1 and 6 l Fiber Interface Module: Shelf 1, Slot 6 (optional) 2. Apply power to the DSU Node by setting the PSU power switch on the node backplate to ON. 3. Check that the Peripheral Resource cards in each node begin power-up self tests. If the Peripheral Resource card does not begin self-test, or if errors are indicated on the numeric display, reinsert the card. If the card fails self-test a second time, replace it. Power-up self tests are only performed when power is first applied to installed cards. 4. Install DSUs in slots 2 to 5 (Shelf 1) of the DSU Node. 5. Repeat Steps 1 to 4 for each additional DSU Node. 6. After circuit cards have been installed in all DSU Nodes, the card installation process is completed. Go to Chart 6-5 for instructions on loading commissioning software onto Plane A of the SX-2000 FD system. 204 6-4 Revision 0 912!%060-204-NA issue 1
![](/img/blank.gif)
m IA SX-2000 FD ICS Commissioning SLOT SLOT SLOT SLOT SHELF 1 I r-------. NON-REDUNDANT CONTROL NODE SHELF2 1 2 3 4 -----________ SLOT SHELF3 SHELF2 SHELF 1 ,-_____-_________ _I , - - - - - - - _I ,_ _ _ _ _ I 1 I ’ I ooco 1 2 3 4 oo[ll 5 6 7 6 mlFl REWNDANT CONTROL NODE Figure 6-l SX-2000 FD Control Node Circuit Card Locations 9125-060-204-NA Issue 1 Revision 0 204 6-5
![](/img/blank.gif)
Commissioning SHELF2 SHELF 1 SHELF2 I 1 Bm.37 I I SHELF1 ____-____---______--____________________--------------, Figure G2 SX-2000 FD Peripheral and DSU Node Circuit Card Locations 204 6-6 Revision 0 9125-060-204-NA issue 1