Page 71
, : . . m IA SX-2000 S ICS Commissioning (A)UPPERSHELF-SHELF2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 16 19 20 * * * * * * E is PERIPHERALINTERFACE CARDS 2 VJAXIMUM OF 12) 8 k-5 B (S)LObVERSHELF-SHELF1 1 2 3 4 5 6 7 6 9 10 11 12 13 14 15 16 17 16 19 20 * * * * * * I I I I I I I PERIPHERALINTERFACE CARDS (MAXIMUM OF 12) NOTES: 1. Theminbnum~~musthavethecardsindicatedbyqnstalledhslotsssshown. 2. Digital Se&e Unih may be sny of thefdlawing: Cmference card, DSI or CEPT Fumattec Cards,...
Page 72
Commissionina load Commissioning Software 4.2 The following chart details the steps required to install commissioning software on the SX-2000 S system. Chart 4-3 Load Commissioning Software On Plane A step Action Comments 1. Remove the ‘Write Protect” tab on the Commissioning The diskette/tape and the HDMs floppy diskette. are protected from corruption since by default when tests are If the commissioning software is stored on a cartridge run on these devices only tape, then ensure that the...
Page 73
m IA SX-2000 S ICS Commissioning Chart 4-3 Load Commissioning Software On Plane A (continued) and reinsert the incorrectly configured card. Enter the CONFIG command to generate a new report, If the card still does ONFIGURATION REPORT ** ENTER TO CONTINUE * Press the space bar on the terminal. returns the following message: TIME 0O:nn:nn (where ‘n’ is a digit, O-9) a bus error is likely to occur. The system returns a bus error indicating that the active Main Control is ready for Any...
Page 74
Commissioning Control and Peripheral Card Tests 4.3 The following chart details the steps required to perform Control and Peripheral Interface card tests on Plane A of an SX-2000 S system. Chart 4-4 SX-2000 S ICS Plane A Control and Peripheral Interface Card Tests SW Actlon Comments 1. Enter the following commands to enable testing of the mass storage devices: EXTERNAL ON HDM ON Enable external device testing; Enable HDM testing; MHDM ON Enable mate HDM testing. EXTERNAL ON test is not...
Page 75
m Id SX-2000 S ICS Commissioning Chart 4-4 SX-2000 S ICS Plane A Control and Peripheral Interface Card Tests (continued) rrors on an message 1s returne external device appear against the 152 CARD NOT DETECTED - NO TEST RUN 17 Main Controller test. (shelf number) (cabinet number) (test number) (pass If a CR-II or CSM-II card or a PIC fails a test, reinsert the failed card, and rerun the test on that slot by issuing the following command: 153 NO TEST AVAILABLE FOR THIS SLOT TEST (slot number)...
Page 76
Commissioning Chart 4-4 SX-2000 S ICS Plane A Control and Peripheral Interface Card Tests (continued) SW Action Comments a. If one or more Peripheral Cabinets is provided then To enable testing in another repeat steps 6 and 7 for each shelf in each peripheral cabinet, enter the command: cabinet. SHELF (cabinet number), (shelf number) 9. Type “SHELF” to return to the prompt. Test all of the circuit switch links from the main control to all of the peripheral shelves by entering the following...
Page 77
m IA SX-2000 S ICS Commissioning Chart 4-5 SX-ZUOU S ICS Load and Test Plane B and Control Mate Links (continued) owing message: SX-2000 (small) COMMISSIONING IN PROGRESS (Date and name of load is output) TIME: 0O:OO:OO CONFIGURATION REPORT NOW BEING ETEST l-20 Suppress all previous testing. MATE LINK ON test, Commissioning must be running and a maintenance terminal must be connected to both To disable the test, issue the command: MATE LINK OFF 10. Test the Peripheral Mate Links in the...
Page 78
Commissioning Chart 4-5 SX-2000 S ICS Load and Test Plane B and Control Mate Links (continued) Step Action Comments 12. Test the Plane B Peripheral Switch Controller card by entering the following command: TEST 16 If the card passes the test, the system returns the following message: 0O:OO:OO 000 TEST COMPLETE - NO ERRORS ON SLOT NUMBER 16 01 02 (test number) (pass number) and then returns the peripheral prompt. 13. Begin testing of PlCs on Shelf 2 by entering: STEST Suppress all previous...
Page 79
m IA SX-2000 S ICS Commissioning Maintenance Panel Commissioning 4.5 The following chart provides details on commissioning a maintenance panel on an SX-2000 S system. Chart 4-6 SX-2000 S Maintenance Panel Commissioning TIVE plane on the Maintenance Connector The system delivers the following message: SYS ID MODULE PRESENT Visual led test: Minor, Major, Criiical, All ON, OFF Perform the following visual checks: l Minor ALARM LED comes on and goes off. 0 Major ALARM LED comes on and goes off....
Page 80
Commissioning Chart 4-6 SX-2000 S Maintenance Panel Commissioning (continued) Step I Action Comments I 6. Remove the commissioning diskette/tape from the external device. 7;, Hardware commissioning is now complete. Refer to Practice 9121-06&200, Installation, for software installation. Page 2 of 2 I 204 4-14 Revision 0 912!3-060-204-NA Issue 1