Home > Mitel > Communications System > Mitel Sx-2000 Integrated Communications System Control Sheet Manual

Mitel Sx-2000 Integrated Communications System Control Sheet Manual

Here you can view all the pages of manual Mitel Sx-2000 Integrated Communications System Control Sheet Manual. The Mitel manuals for Communications System are available online for free. You can easily download all the documents as PDF.

Page 71

, : 
. . 
m IA 
SX-2000 S ICS Commissioning 
(A)UPPERSHELF-SHELF2 
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 16 19 20 
* * * * * * 
E 
is 
PERIPHERALINTERFACE CARDS 2 
VJAXIMUM OF 12) 8 
k-5 
B 
(S)LObVERSHELF-SHELF1 
1 2 3 4 5 6 7 6 9 10 11 12 13 14 15 16 17 16 19 20 
* * * * * * 
I I I I I I I 
PERIPHERALINTERFACE CARDS 
(MAXIMUM OF 12) 
NOTES: 1. Theminbnum~~musthavethecardsindicatedbyqnstalledhslotsssshown. 
2. Digital Se&e Unih may be sny of thefdlawing: 
Cmference card, DSI or CEPT Fumattec Cards,...

Page 72

Commissionina 
load Commissioning Software 
4.2 The following chart details the steps required to install commissioning software on 
the SX-2000 S system. 
Chart 4-3 Load Commissioning Software On Plane A 
step Action Comments 
1. Remove the ‘Write Protect” tab on the Commissioning 
The diskette/tape and the HDMs 
floppy diskette. are protected from corruption 
since by default when tests are 
If the commissioning software is stored on a cartridge run on these devices only 
tape, then ensure that the...

Page 73

m IA 
SX-2000 S ICS Commissioning 
Chart 4-3 Load Commissioning Software On Plane A 
(continued) 
and reinsert the incorrectly 
configured card. Enter the 
CONFIG command to generate a 
new report, If the card still does 
ONFIGURATION REPORT 
** ENTER  TO CONTINUE * 
Press the space bar on the terminal. 
returns the following message: 
TIME 0O:nn:nn (where ‘n’ is a digit, O-9) 
a bus error is likely to occur. The 
system returns a bus error 
indicating that the active Main Control is ready for 
Any...

Page 74

Commissioning 
Control and Peripheral Card Tests 
4.3 The following chart details the steps required to perform Control and Peripheral 
Interface card tests on Plane A of an SX-2000 S system. 
Chart 4-4 SX-2000 S ICS Plane A Control and Peripheral Interface Card Tests 
SW Actlon 
Comments 
1. 
Enter the following commands to enable testing of the 
mass storage devices: 
EXTERNAL ON 
HDM ON Enable external device testing; 
Enable HDM testing; 
MHDM ON 
Enable mate HDM testing. 
EXTERNAL ON test is not...

Page 75

m Id 
SX-2000 S ICS Commissioning 
Chart 4-4 SX-2000 S ICS Plane A Control and Peripheral Interface Card Tests 
(continued) 
rrors on an 
message 1s returne 
external device appear against the 
152 CARD NOT DETECTED - NO TEST RUN 17 Main Controller test. 
(shelf number) (cabinet number) (test number) (pass 
If a CR-II or CSM-II card or a PIC 
fails a test, reinsert the failed card, 
and rerun the test on that slot by 
issuing the following command: 
153 NO TEST AVAILABLE FOR THIS SLOT TEST (slot number)...

Page 76

Commissioning 
Chart 4-4 SX-2000 S ICS Plane A Control and Peripheral Interface Card Tests 
(continued) 
SW Action Comments 
a. If one or more Peripheral Cabinets is provided then To enable testing in another 
repeat steps 6 and 7 for each shelf in each peripheral cabinet, enter the command: 
cabinet. 
SHELF (cabinet number), 
(shelf number) 
9. 
Type “SHELF” to return to the  prompt. 
Test all of the circuit switch links from the main control 
to all of the peripheral shelves by entering the 
following...

Page 77

m IA 
SX-2000 S ICS Commissioning 
Chart 4-5 SX-ZUOU S ICS Load and Test Plane B and Control Mate Links 
(continued) 
owing message: 
SX-2000 (small) COMMISSIONING IN PROGRESS 
(Date and name of load is output) 
TIME: 0O:OO:OO 
CONFIGURATION REPORT NOW BEING 
ETEST l-20 Suppress all previous testing. 
MATE LINK ON test, Commissioning must be 
running and a maintenance 
terminal must be connected to both 
To disable the test, issue the command: 
MATE LINK OFF 
10. Test the Peripheral Mate Links in the...

Page 78

Commissioning 
Chart 4-5 SX-2000 S ICS Load and Test Plane B and Control Mate Links 
(continued) 
Step Action Comments 
12. Test the Plane B Peripheral Switch Controller card by 
entering the following command: 
TEST 16 
If the card passes the test, the system returns the 
following message: 
0O:OO:OO 000 TEST COMPLETE - NO ERRORS ON 
SLOT NUMBER 16 01 02 (test number) (pass 
number) 
and then returns the peripheral prompt. 
13. Begin testing of PlCs on Shelf 2 by entering: 
STEST Suppress all previous...

Page 79

m IA 
SX-2000 S ICS Commissioning 
Maintenance Panel Commissioning 
4.5 The following chart provides details on commissioning a maintenance panel on an 
SX-2000 S system. 
Chart 4-6 SX-2000 S Maintenance Panel Commissioning 
TIVE plane on the Maintenance Connector 
The system delivers the following message: 
SYS ID MODULE PRESENT 
Visual led test: Minor, Major, Criiical, All ON, OFF 
Perform the following visual checks: 
l Minor ALARM LED comes on and goes off. 
0 Major ALARM LED comes on and goes off....

Page 80

Commissioning 
Chart 4-6 SX-2000 S Maintenance Panel Commissioning 
(continued) 
Step I Action Comments 
I 
6. Remove the commissioning diskette/tape from the 
external device. 
7;, Hardware commissioning is now complete. Refer to 
Practice 9121-06&200, Installation, for software 
installation. 
Page 2 of 2 I 
204 4-14 Revision 0 912!3-060-204-NA Issue 1  
Start reading Mitel Sx-2000 Integrated Communications System Control Sheet Manual

Related Manuals for Mitel Sx-2000 Integrated Communications System Control Sheet Manual

All Mitel manuals