Page 221
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Adding or Removing Hardware 6-87 Adding Control Cabinet to Release 8si 6 Shut Down DEFINITY LAN Gateway System !CAUTION: Before shutting down the DEFINITY LAN Gateway, save the system parameters if you plan to reuse the current system. !WA R N I N G : Neglecting to shut down a DEFINITY LAN Gateway assembly before powering down the system cabinet where it resides can damage the LAN Gateway disk. 1. Log onto the...
Page 222
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Adding or Removing Hardware 6-88 Adding Control Cabinet to Release 8si 6 Disconnect Cables 1. Disconnect all of the previously labeled connector cables. 2. Disconnect the management terminal from the TERM connector. 3. Remove the ground plates from between all of the stacked cabinets. 4. Remove the top and bottom rear covers from all of the cabinets. Disconnect Power and Ground 1. Disconnect the cabinet power...
Page 223
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Adding or Removing Hardware 6-89 Adding Control Cabinet to Release 8si 6 Install Duplicated Control Cabinet 1.Set the duplicated control cabinet above cabinet “A” (in the “B” position). See Figure 6-23 . Install Port Cabinets 1. Set port cabinets “C” and “D” into their original positions. See Figure 6-23. Verify Usable Circuit Pack Vintages 1. Verify each reused circuit pack conforms to the usable vintages for...
Page 224
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Adding or Removing Hardware 6-90 Adding Control Cabinet to Release 8si 6 4.Install the new control circuit packs into control cabinet “B.” 5. Install the new TN776 or TN570/B/C Expansion Interface circuit packs into cabinets “A” and “B.” 6. For a critical reliability system with optional packet bus, install a new TN771D Maintenance/Test circuit pack into an available port slot of each port network (if not...
Page 225
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Adding or Removing Hardware 6-91 Adding Control Cabinet to Release 8si 6 Verify Port Cabinet Address Plugs 1. Behind each port cabinet, locate the address plug attaching to two of the six backplane pins to the right of the pin-field block for slot “00.” 2. Verify the location of each port cabinet address plug matches the cabinet’s current position. See Figure 6-29 . Relocate Port Cabinet B PPN Cabinet Stack...
Page 226
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Adding or Removing Hardware 6-92 Adding Control Cabinet to Release 8si 6 b. Attach the TDM/LAN cable to the backplane. Slide the cable between the connector panel and the rear shelf (not through the existing slot in the shelf). Route the cable along the bottom of the cabinet. c. Replace and tighten the connector panel screws. 2. Connect the new ICC cables (H600-248 G1). See Figure 6-35 and Figure 6-36 ....
Page 227
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Adding or Removing Hardware 6-93 Adding Control Cabinet to Release 8si 6 Reconnect Remaining Cables 1.Install the CFY1 current limiter (CURL) on the “A” carrier, to pin-field block “00.” See Figure 6-35 . The CURL’s components are on the left side. 2. Replace all cables that were labeled and removed. 3. Install the front door on each cabinet. Install the top and bottom rear covers on the new expansion control...
Page 228
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Adding or Removing Hardware 6-94 Adding Control Cabinet to Release 8si 6 Figure 6-35. ICC Pin-Field Blocks on Expansion Control Cabinet Figure Notes 1. CURL (Current Limiter) Connector 2. ICCA Connectors3. ICCB Connectors
Page 229
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Adding or Removing Hardware 6-95 Adding Control Cabinet to Release 8si 6 Figure 6-36. ICC Pin-Field Blocks on Port Cabinet Install Rear Panels 1. Install the rear panels and loosely thread each screw. See Figure 6-30. 2. For unstacked cabinets, tighten the screws securely. For a stack of cabinets, allow the screws labeled Callout 4 to remain loose. These screws are tightened when the ground plates are...
Page 230
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Adding or Removing Hardware 6-96 Adding Control Cabinet to Release 8si 6 Connect Power and Ground 1. Reconnect the 6 AWG (#40) (16 mm2) cabinet ground wire to the single-point ground block on the cabinet. 2. Reconnect the 10 AWG (#25) (6 mm 2) coupled bonding conductor wire. 3. Reconnect the cabinet power cords behind each cabinet. Remove Power-Failure Ground Wire 1. Remove the previously installed ground wire...