Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual
Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual
Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 231
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Adding or Removing Hardware 6-97 Adding Control Cabinet to Release 8si 6 Reboot the System 1.Connect the management terminal to the “TERMINAL” connector behind PPN control carrier “A,” or install the G3-MA according to DEFINITY Communications System Generic 3 Management Applications — Operations , 585-229-202. 2. Verify that the translation cards are inserted in the TN794 circuit packs. 3. At each cabinet...
Page 232
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Adding or Removing Hardware 6-98 Adding Control Cabinet to Release 8si 6 2. Type the appropriate start and stop information in the Change Day, Month, Date, Time, and Increment (for example, 1:00 equals one hour) fields for each rule. NOTE: You can change any rule except rule 0 (zero). You cannot delete a daylight savings rule if it is in use on either the Locations or Date and Time screens. 3. Press En te...
Page 233
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Adding or Removing Hardware 6-99 Adding Control Cabinet to Release 8si 6 4. The cursor is positioned on the Month: field. Type the current month in English (January through December). See Table 6-14 for English month names. After the month is entered, press Ta b to move to next field. 5. The cursor is positioned on the Day of the Month: field. Type the day of month (1 through 31) and press Ta b to move to...
Page 234
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Adding or Removing Hardware 6-100 Adding Control Cabinet to Release 8si 6 Set Additional Administration 1. Type list configuration software-version long and press En t e r to compare the version number of the Release 8 software program (displayed on the terminal or G3-MA) with the TN790B version number (written on a label on the TN790B’s faceplate). If the version numbers are not the same, change the version...
Page 235
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Adding or Removing Hardware 6-101 Adding Control Cabinet to Release 8si 6 Install Cable Clamps 1. Behind the cabinets using screws provided, install 2 cable clamps on each ground plate. See Figure 6-37 . These clamps hold the port cables. Figure 6-37. Locations of Ground Plate and Cable Clamps Retranslate Port Circuits If port circuit packs in the control cabinet were relocated to put one of the following...
Page 236
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Adding or Removing Hardware 6-102 Adding Control Cabinet to Release 8si 6 Enable Customer Options and Alarm Origination 1. Get the DOSS order number of the upgrade. Call the regional CSA to perform the steps in this section. 2. To use Access Security Gateway (ASG), see Chapter A, ‘‘Administering and Using ASG’’. 3. Type change system-parameters customer-options and press En t e r. Use these forms to verify...
Page 237
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Adding or Removing Hardware 6-103 Installing Earthquake Protection 6 Installing Earthquake Protection Earthquake protection only installs on Single-Carrier Cabinets. Figure 6-38. Front Mounting Angle Location 1. Position the Control Cabinet (J58890L) in the position it is to occupy when the installation is complete. Be sure the cabinet is level. 2. Using a pencil or marker and using the Front Mounting Angle as...
Page 238
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Adding or Removing Hardware 6-104 Installing Earthquake Protection 6 4. Insert a concrete floor anchor (STARR part number 3425) into each hole. 5. Secure the Front Mounting Angle to the floor using the short hex head bolts provided. 6. Move the cabinet back into place. 7. At the rear of the cabinet, remove the 2 hole plugs from the bottom of the cabinet. See Figure 6-39 . 8. Insert a pencil or marker through...
Page 239
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Adding or Removing Hardware 6-105 Installing an Integrated Channel Service Unit (ICSU) Module 6 Figure 6-39. Cabinet Earthquake Mounting — Rear View Installing an Integrated Channel Service Unit (ICSU) Module The integrated channel service unit (ICSU) is a combination of a 120A CSU module integrated with a DS1 circuit pack. Use this device with the 700A DS1 loopback jack when testing the DS1 span. Figure...
Page 240
DEFINITY ECS Release 8.2 Upgrades and Additions for R8.2si 555-233-122 Issue 1 April 2000 Adding or Removing Hardware 6-106 Installing an Integrated Channel Service Unit (ICSU) Module 6 Checking for required components The integrated channel service unit (ICSU) package contains: n120A CSU module nCable H600-383 4-pair modular cord Group 2, 50-ft (15.2-m) cable (standard) nCord DW8A-DE 4-pair modular cord to alarm contacts nDS1 circuit pack The basic ICSU requires a TN474E or TN777D or later suffix....