Home > Lucent Technologies > Communications System > Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual

Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual

Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.

Page 231

DEFINITY ECS Release 8.2
Upgrades and Additions for R8.2si  555-233-122  Issue 1
April 2000
Adding or Removing Hardware 
6-97 Adding Control Cabinet to Release 8si 
6
Reboot the System
1.Connect the management terminal to the “TERMINAL” connector behind 
PPN control carrier “A,” or install the G3-MA according to 
DEFINITY 
Communications System Generic 3 Management Applications 
— 
Operations
, 585-229-202.
2. Verify that the translation cards are inserted in the TN794 circuit packs.
3. At each cabinet...

Page 232

DEFINITY ECS Release 8.2
Upgrades and Additions for R8.2si  555-233-122  Issue 1
April 2000
Adding or Removing Hardware 
6-98 Adding Control Cabinet to Release 8si 
6
2. Type the appropriate start and stop information in the Change Day, 
Month, Date, Time, and Increment (for example, 1:00 equals one hour) 
fields for each rule. 
NOTE:
You can change any rule except rule 0 (zero). You cannot delete a 
daylight savings rule if it is in use on either the Locations or Date and 
Time screens.
3. Press 
En te...

Page 233

DEFINITY ECS Release 8.2
Upgrades and Additions for R8.2si  555-233-122  Issue 1
April 2000
Adding or Removing Hardware 
6-99 Adding Control Cabinet to Release 8si 
6
4. The cursor is positioned on the Month: field. Type the current month in 
English (January through December). See Table 6-14
 for English month 
names. After the month is entered, press 
Ta b to move to next field.
5. The cursor is positioned on the Day of the Month: field. Type the day 
of month (1 through 31) and press 
Ta b to move to...

Page 234

DEFINITY ECS Release 8.2
Upgrades and Additions for R8.2si  555-233-122  Issue 1
April 2000
Adding or Removing Hardware 
6-100 Adding Control Cabinet to Release 8si 
6
Set Additional Administration
1. Type list configuration software-version long and press En t e r to compare 
the version number of the Release 8 software program (displayed on the 
terminal or G3-MA) with the TN790B version number (written on a label on 
the TN790B’s faceplate). If the version numbers are not the same, change 
the version...

Page 235

DEFINITY ECS Release 8.2
Upgrades and Additions for R8.2si  555-233-122  Issue 1
April 2000
Adding or Removing Hardware 
6-101 Adding Control Cabinet to Release 8si 
6
Install Cable Clamps
1. Behind the cabinets using screws provided, install 2 cable clamps on each 
ground plate. See Figure 6-37
. These clamps hold the port cables.
Figure 6-37. Locations of Ground Plate and Cable Clamps 
Retranslate Port Circuits
If port circuit packs in the control cabinet were relocated to put one of the following...

Page 236

DEFINITY ECS Release 8.2
Upgrades and Additions for R8.2si  555-233-122  Issue 1
April 2000
Adding or Removing Hardware 
6-102 Adding Control Cabinet to Release 8si 
6
Enable Customer Options and Alarm Origination
1. Get the DOSS order number of the upgrade. Call the regional CSA to 
perform the steps in this section.
2. To use Access Security Gateway (ASG), see Chapter A, ‘‘Administering 
and Using ASG’’.
3. Type change system-parameters customer-options and press 
En t e r. Use 
these forms to verify...

Page 237

DEFINITY ECS Release 8.2
Upgrades and Additions for R8.2si  555-233-122  Issue 1
April 2000
Adding or Removing Hardware 
6-103 Installing Earthquake Protection 
6
Installing Earthquake Protection
Earthquake protection only installs on Single-Carrier Cabinets. 
Figure 6-38. Front Mounting Angle Location
1. Position the Control Cabinet (J58890L) in the position it is to occupy when 
the installation is complete. Be sure the cabinet is level.
2. Using a pencil or marker and using the Front Mounting Angle as...

Page 238

DEFINITY ECS Release 8.2
Upgrades and Additions for R8.2si  555-233-122  Issue 1
April 2000
Adding or Removing Hardware 
6-104 Installing Earthquake Protection 
6
4. Insert a concrete floor anchor (STARR part number 3425) into each hole.
5. Secure the Front Mounting Angle to the floor using the short hex head bolts 
provided.
6. Move the cabinet back into place.
7. At the rear of the cabinet, remove the 2 hole plugs from the bottom of the 
cabinet. See Figure 6-39
.
8. Insert a pencil or marker through...

Page 239

DEFINITY ECS Release 8.2
Upgrades and Additions for R8.2si  555-233-122  Issue 1
April 2000
Adding or Removing Hardware 
6-105 Installing an Integrated Channel Service Unit (ICSU) Module 
6
Figure 6-39. Cabinet Earthquake Mounting — Rear View
Installing an Integrated Channel
Service Unit (ICSU) Module
The integrated channel service unit (ICSU) is a combination of a 120A CSU 
module integrated with a DS1 circuit pack. Use this device with the 700A DS1 
loopback jack when testing the DS1 span.  Figure...

Page 240

DEFINITY ECS Release 8.2
Upgrades and Additions for R8.2si  555-233-122  Issue 1
April 2000
Adding or Removing Hardware 
6-106 Installing an Integrated Channel Service Unit (ICSU) Module 
6
Checking for required components
The integrated channel service unit (ICSU) package contains:
n120A CSU module
nCable H600-383
4-pair modular cord
Group 2, 50-ft (15.2-m) cable (standard)
nCord DW8A-DE
4-pair modular cord to alarm contacts
nDS1 circuit pack
The basic ICSU requires a TN474E or TN777D or later suffix....
Start reading Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual

Related Manuals for Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Upgrades And Additions Manual

All Lucent Technologies manuals