Home > Lucent Technologies > Communications System > Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation For Adjuncts And Peripherals Manual

Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation For Adjuncts And Peripherals Manual

Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation For Adjuncts And Peripherals Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.

Page 31

DEFINITY ECS Release 8.2
Installation for Adjuncts and Peripherals  555-233-116  Issue 1
April 2000
Auxiliary Power Supplies 
9 1145B Power Supply 
2
Circuit protection
A thermistor c urrent-limits the maximum outp ut of eac h outp ut to 12 W, but the 
averag e p ower p er outp ut c annot exc eed  7.25 W (200/32 =  7.25). An LED 
indic ates the status of the thermistor. When the LED is ON, there is a short on the 
power pair.
Mountings
The back-up battery mounts on a top plate. The power supply and...

Page 32

DEFINITY ECS Release 8.2
Installation for Adjuncts and Peripherals  555-233-116  Issue 1
April 2000
Auxiliary Power Supplies 
10 1145B Power Supply 
2
Figure 3. 1145B/1146 Mounting Arrangement
5. Write the Unit Numb er and  c onnec tivity information on the front lab el, next 
to the LEDs. 1. Wall mounting  p late
2. Op tional b attery (1149B shown)
3. 1146 power d istrib ution unit
4. 1145B p ower unit5. Power c ab le
6. Unswitc hed  outlet (120 VAC, 20 A or 230 
VA C ,  1 5  A )
7. Battery b ac kup...

Page 33

DEFINITY ECS Release 8.2
Installation for Adjuncts and Peripherals  555-233-116  Issue 1
April 2000
Auxiliary Power Supplies 
11 1145B Power Supply 
2
Installing the 1146 Power Distribution Unit
1. Insert and  sec urely tig hten the two sup p lied  #8-32 x 1/2-in. should er 
sc rews (they have an unthread ed  sec tion at the top ) into the top holes 
d esig nated  for 1146 Power Distrib ution Unit on the b ottom p late. Mount 
the unit on these two shoulder sc rews, using  the key holes on the b ac k of...

Page 34

DEFINITY ECS Release 8.2
Installation for Adjuncts and Peripherals  555-233-116  Issue 1
April 2000
Auxiliary Power Supplies 
12 1145B Power Supply 
2
!CAUTION:
Total power c annot exc eed  200 W. Consult the c hart b elow for p ermissib le 
terminal installations.
Eac h exp and ed  p ower d istrib ution unit kit sup p lies the following  items:
n
One p ower d istrib ution unit 
n
One T-c ab le
n
Two #8-32 x 1/2-in. should er sc rews
n
One #8-32 x 1 in. sc rew
n
One sp ac er b rac ket
Refer to Fi g u re...

Page 35

DEFINITY ECS Release 8.2
Installation for Adjuncts and Peripherals  555-233-116  Issue 1
April 2000
Auxiliary Power Supplies 
13 1145B Power Supply 
2
8. Connec t the P2 c onnec tor to the top  d istrib ution unit. 
9. Connec t the P3 c onnec tor to the 1145B.
10. Power-up  the 1145B as d esc rib ed  on the lab el on the sid e of the unit.
Figure 4. Expanded Power Distribution Unit 1. Wall-mounting  p late
2. Op tional 1146 p ower distrib ution unit
3. T c ab le (H600-347-G7)4. Stand ard 1146 p ower...

Page 36

DEFINITY ECS Release 8.2
Installation for Adjuncts and Peripherals  555-233-116  Issue 1
April 2000
Auxiliary Power Supplies 
14 1145B Power Supply 
2
Powering Up and Testing AC and DC Power
When you p ower up  the unit or interrup t p ower to a unit, the unit runs an AC or 
DC self test. LEDs on the front p anel ind ic ate the status of the p ower sup p ly. The 
following table lists the LEDs. 
1. Connec t the AC p ower c ord  to the p ower sup p ly, and route the c ord  to an 
ap p rop riate AC outlet...

Page 37

DEFINITY ECS Release 8.2
Installation for Adjuncts and Peripherals  555-233-116  Issue 1
April 2000
Auxiliary Power Supplies 
15 1145B Power Supply 
2
Wire the 1146 Power Distribution Unit
Wire end points to the 1146 while p ower from the 1145B is on. 
1. Install c ross-c onnec t jump ers (the lab el shows p olarity) to Pins 7 and  8 of 
the ap p rop riate information outlet. Route the wires throug h the c lip  
p rovid ed on the unit. If a red  LED is on, see ‘‘Rep airing  Short Circ uits and...

Page 38

DEFINITY ECS Release 8.2
Installation for Adjuncts and Peripherals  555-233-116  Issue 1
April 2000
Auxiliary Power Supplies 
16 1151A and 1151A2 Power Supplies 
2
Replacing the Batteries
To maintain back-up protection and battery reliability:
1. Rep lac e b atteries every four years.
Storing the Batteries in Inactive Units
To p revent leakag e when the p ower unit is not in use for several months or more:
1. Remove the b atteries and  store them sep arately.
Repairing Short Circuits and Resetting Red...

Page 39

DEFINITY ECS Release 8.2
Installation for Adjuncts and Peripherals  555-233-116  Issue 1
April 2000
Auxiliary Power Supplies 
17 1151A and 1151A2 Power Supplies 
2
n
Use of 2 mod ular jac ks. PHONE jac k p ins 7 and  8 (- and  + , resp ec tively) 
provide power.
The PHONE and  LINE jac ks are 8-p in female nonkeyed 757-typ e jac ks that c an 
ac c ep t D4, D7, and  D8 mod ular plug  c ab les. Fi g u re  6
 shows a 1151A p ower 
sup p ly. The 1151A2 looks similar.
!DANGER:
When op erating  p ower-supp ly...

Page 40

DEFINITY ECS Release 8.2
Installation for Adjuncts and Peripherals  555-233-116  Issue 1
April 2000
Auxiliary Power Supplies 
18 1151A and 1151A2 Power Supplies 
2
Desk Mounting
1. Plac e the p ower sup ply on a flat surfac e suc h as a d esk. 
Wall Mounting
1. For wall-mounting , use the keyhole slots on the bottom of the c hassis.
Standards compliance
The 1151A and  1151A2 p ower sup p lies c omp ly with the UL Stand ard  UL 1459, 
sec ond  ed ition. 
Table 8. Standards compliance
Complies UL 1459...
Start reading Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation For Adjuncts And Peripherals Manual

Related Manuals for Lucent Technologies DEFINITY Enterprise Communication Server Release 8.2 Installation For Adjuncts And Peripherals Manual

All Lucent Technologies manuals