Land Rover 90 110 Workshop Rover Manual
Have a look at the manual Land Rover 90 110 Workshop Rover Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 364 Land Rover manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
LT95 FOUR SPEED GEARBOX (371 6. Lift out the reverse idler gear assembly. 7. Remove the circlip and plain washer. 8 Lift out the needle rollcr bearings and further plain washer. 9. Withdraw the remaining circlip. 9 32. Fit the detent balls and springs. 33. Selcct neutral and using a new joint washer, fit thc gearbox top cover and secure with the eight bolts, T and evenly tighten to the correct torque. STl23 1 M 34. Fit the reverse light switch 35. Fit the bell housing. Assemble reverse idler gear and shaft REMOVE AND OVERHAUL REVERSE IDLEK GEAR AND SHAFT Special tool: 18G1335 - extractor for shaft 1. Remove the gearbox sidc cover. 2. Remove the gearbox bottom cover. 3. Remove the bolt securing the idler gear shaft in the 4. Withdraw the idler gcar shaft, using cxti-actor 5. Remove the ‘0’ ring seal. gearbox casing. 18G1335. 10. If removed, fit the shaft support bush, using Locquic primer grade ‘T and ‘AVV’ grade. 11. Fit the circlip to selector groove end of thc gcar. 12. Fit thc plain washer and two needlc rollcr bearings. 13. Fit the outcr plain washcr and secure with circlip. 14. Fit a new ‘0’ ring seal to the idler gear shaft. 15. Offer the idler shaft to the gearbox and align the 16. Smear clean gearbox oil onto the ‘0’ ring seal. 17. Position the reverse idler assembly in the casing. 18. Engagc thc sclcctor foot in the idler gcar groove. 19. Drive in the idler gear shaft until the retaining bolt holes are aligned. 20. Before fitting the retaining bolt, trcat the threads with Locquic primer grade ‘T’ and allow to dry. Then, fit thc bolt using Loctite Studlock grade. 21. Fit the gearbox bottom cover using a new joint washer and secure with the fourteen bolts evenly tightening to the correct torque. 22. Using a new joint washer fit the side cover with the four bolts and tighten to thc spccificd torque. retaining bolt holes. . 49
LT 95 FOUR SPEED GEARBOX REMOVE AND OVERHAUL FRONT COVER AND OIL PUMP Service tools: R01005 - Centralising tool 18G134 - guide and 18G134DG - assembly tool for fitting oil seal and oil feed ring. 1. Lift out the retainer staple from the clutch release bearing assembly and the release lever. See clutch release overhaul. 2. Withdraw the release bearing assembly. 3. Remove the slave cylinder pushrod. 4. Remove the spring clip. 5. Withdraw the clutch release lever. 6. Remove the front cover assembly, complete with oil pump joint washer. 7. Remove the shim washer located between the front cover and thc layshaft front bearing. - STl234M 16. Press in the oil feed ring, using 18G134 guide and 18G134DG adaptor. 17. Fit the ball, spring and plug. When fitted, the plug must be flush with, or not more than 0,25 mm (0.010 in) below the front cover rear face. 18. Fit the oil pump ring gear. ST1235M N Overhaul 8. 9. 10. 11. 12. 13. Remove the pump cover gasket and oil pump drive. Withdraw the oil pump ring gear. Remove the oil feed ring. Withdraw the oil seal. Remove the plug and withdraw the ball and spring from the relief valve housing. If required, drift off the extension sleeve. Fit a repiacemenr using iocrite 275 grade. Reassemble 14. Press in the oil seal, plain face first, using 186134 guide and 186134DG adaptor. ST1236M 15. Align the centre hole of three in the oil feed ring 50 with the oil delivery hole in the front cover.
LT 95 FOUR SPEED GEARBOX (37( Fit cover assembly to gearbox 19. Position the layshaft bearing shim washer. 20. Position the front cover assembly and loosely fit the fixings. 21. Fit the oil pump drive gear to engage the drive square in the layshaft. 22. Fit the oil pump cover and joint washer and fit the fixing screws and washers and carefully tighten to the correct torque. 23. Fit the gauge R01005 to align the primary pinion with the bell housing. 24. Visually check that the front cover is concentric about the primary pinion. Adjust the front cover position about its fixings to suit. ST1237M 25. When satisfactory, tighten the front cover fixings. 26. Fit the clutch release lever and spring clip. 27. Fit the slave cylinder push -rod. 28. Fit the release bearing assembly. 29. Fit the retainer staple to the clutch release bearing assembly and lever. REMOVE AND OVERHAUL BEARING PLATE ASSE MB LY 1. Remove the bell housing and position the gearbox with the front end uppermost. 2. Remove the oil pump gears cover and joint washer. 3. Withdraw the oil pump drive gear. 4. Temporarily remove the four fixing studs from the gearbox front face. 5. Ease the bearing piate away from the gearbox. 6. Withdraw the two dowel sleeves which locate the bearing plate. 7. Withdraw the bearing plate assembly complete with primary pinion and layshaft. 8. Withdraw the joint washer. 9. Withdraw the layshaft. - ST1238M Assemble bearing plate assembly NOTE: To replace a bearing plate, a bearing plate and gearbox casing mated assembly must be fitted. 10. Locate the cone into the third/fourth-speed 11. Lubricate the oil tube, using clean gearbox oil. 12. Position the joint washer. 13. Engage the layshaft with the primary pinion and front bearing outer member. 14. Fit the bearing plate and layshaft. 15. Align the bearing plate with the gearbox casing and slide home the dowel sleeves. 16. Refit the studs. Smcar Loctite Studlock grade CVX, on the two upper studs securing threads before fitting. synchromesh unit. 17. Fit the oil pump drive gear. 18. Using a new joint washer fit the oil pump gear 19. Fit the bell housing. cover. 51
LT 95 FOUR SPEED GEARBOX REMOVE AND OVERHAUL PRIMARY PINION 1. Remove the bell housing. 2. Remove the front cover and oil pump assembly. 3. Remove the bearing plate assembly. 4. Remove the circlip. 5. Lift off the shim washer. 6. Press out the primary pinion. ST 1 240M 7. Withdraw the bearing retaining plates and serrated 8. Press out the primary pinion bearing. bolts. ~ ~~~ ~ ~~ ~ Assemble primary pinion 9. Check that the orifice drilkd in the oil tube is clear. 10. During refitting, take care to avoid damage to the oil tube. Rotate the shaft in the bearing to ensure that the oil tube is straight. 11. Support the bearing plate using suitable wooden blocks. Position the blocks across the bearing housing aperture to act as assembly stops. 12. Press in the bearing until flush with the bearing plate. 13. Press in the primary pinion. Check that the bearing remains flush with the bearing plate. 14. Fit the retaining plates and serrated bolts. 15. Fit the shim washer and circlip. 16. Measure the clearance between the circlip and the shim washer. There must be a clearance of 0,05 mm (0.002 in) maximum. 17. If required, adjust the clearance by fitting a replacement shim washer. Shim range is 2,O to , 2,15 mm (0.079 to 0.085 in) in 0,05 mm (0.002 in) stages. 18. Fit the bearing plate assembly. 19. Fit the front cover and oil pump assembly. 20. Fit the bell housing. 52
LT 95 FOUR SPEED GEARBOX 1371 - -. ..._ __ ,.~ ., .1-. REMOVE AND OVERHAUL THE MAINSHAFT .....,. . ., ASSEMBLY .. . . ..L ...,. ., .. ... ..-. . Special tool: 1861388 -extractor for mainshaft spacer and gear 1. Remove the bell housing. 2. Rcmove the front bearing plate. 3. Remove the main gearchangc sclectors. 4. Removc the mainshaft rear bearing housing and 5. Remove the bottom cover from the transfer roller bearing. gearbox. NOTE: At this stage in the dismantling, on early gearboxes only, it is necessary to remove the transfer top cover selector finger and shaft. On later gearboxes the cross -shaft is machined to enable the spacer to be completely withdrawn. Also the main shaft spacer and transfer gear are secured by Loctite 275 to the main shaft. 6. Remove the snap-ring, shim washer and mainshaft transfer gear, using special tool 18G1388. 7. Fit extractor 1861388 to transfer gear spacer. 8. Withdraw the spacer along the mainshaft until the larger diameter on the spacer reaches the transfer gear lever cross -shaft. 9. Withdraw the spacer through thc machined 10. When the spacer is free on the mainshaft removc scollop. the extractor. 1 I. Withdraw the mainshaft assembly, allowing the first -speed gear to remain behind to avoid fouling on thc casing. 12. Lift out the first-speed gear. 13. Refit thc first-speed gear, scalloped thrust washer, thrust needle bearing and stepped thrust washer, stepped face outwards. 14. Withdraw the mainshaft spacer. . 4. .. . I.! .;:: ST1246M 53
LT 95 FOUR SPEED GEARBOX Overhaul mainshaft assembly Dismantle 15. Withdraw thc first-speed gear, thrust washers and roller bearings from the rear of the shaft. 16. Remove the snap-ring and shim washer from thc front of the shaft. 17. Lift off the third/fourth gears synchromesh assembly. 18. Withdraw the third and second-speed gears and the associated thrust washers and needle-rollcr bearings. 19. Dismantle the third/fourth gears synchromesh assembly, first pushing down the sliding blocks to free the synchromesh balls from the retaining groove in the outer member. 29 - 21 Assemble 22. Replacement thrust washers and roller bcarings must not be degreased. 23. Lubricate all items before assembly, iising clcan main gearbox oil. 24. Fit the oil seal to the mainshaft front end. Assemble synchromesh units 25. Fit together the thirdfourth gcar synchromesh outer and inner members, outer member coned face toward inner member plain face. 26. Fit the sliding blocks, radius face outward. 27. Locate the springs through the sliding blocks into the housing bores in the inner member. 28. Position the balls on thc spring ends; press home in sequence and retain by hand. 29. Lift the outer member to retain the balls. Continue lifting until the balls spring home into the annular 30. Assemble the first/second gear synchromesh unit in the manner dcscribed for third/fourth gear unit. Fit the outer member coned face toward the front end of the mainshaft. ~-~ groove in the outer member. 4.L. Assemble mainshaft front end 31. Fit a synchromesh cone to the firstkcond gcar synchromesh outer member. 32. Position a chamfered thrust washer, a thrust needle bearing and a scalloped thrust washer on the mainshaft. 33. Fit a radial needle bearing and the second-speed gear. ST1247M 20. Dismantle the firsthecond gears synchromesh assembly in a similar manner, particularly noting their position for refitting. 21. Withdraw the oil scal from the Sore in the mainshaft front end. -2w ST1249M ST 1248M 54
.,.. ,. .. ., -... . r ,: 5 -.: : . . .: . ,. .. LT95 FOUR SPEED GEARBOX 137 34. Fit a scalloped thrust washer, a thrust needle bearing and a further scalloped thrust washer. 35. Fit a radial needle bearing and the third-specd gear. 36. Fit a scalloped thrust washer, a thrust needle bearing and a further scalloped thrust washer. 37. Position a synchromesh cone onto the third-speed gear. 38. Fit the synchromesh unit, coned face to rear. Set end-float of gears 39. Position the mainshaft asscmbly vertical, front end 40. Apply a light loading on the gears to remove 41. Position the snap -ring in the mainshaft groove. 42. Measure the distance between the snap -ring lower edge and the synchromesh unit inner member. 43. Select a shim to reduce the measured clearance to 0,025 to 0,150 mm (0.001 to 0.006 in) when fitted. 44. Shim range is 1,85 to 2,45 mm (0.073 to 0.096 in) in 0,15 mm (0.006 in) increments. 45. Fit the selected shim washer and the snap -ring. uppermost. end -float. Assemble mainshaft rear end 46. Fit a synchromesh cone to the first/second gear synchromesh outer member. 47. Position a chamfercd thrust washer, a thrust needle bearing and a scallopcd thrust washcr on the mainshaft. 48. Fit the first-speed gear and bearing. 49. Fit a scalloped thrust washer, a thrust needle bearing and the stepped thrust washcr, stcppcd face outwards. 50. The mainshaft spacer, transfer gear, shim washer and snap -ring are fitted during mainshaft refitting. ST1253M Assemble mainshaft assembly to gearbox 51. Position the gearbox with the R.H. side rfownwar& to .id refittifin 52. Remove the gearbox side cover. 53. Temporarily move the first -speed gear toward the rear of the shaft. 54. Offer the assembled mainshaft to the gearbox and manoeuvre the first -speed gear past the reverse idler gear. 6 55
137 I LT 95 FOUR SPEED GEARBOX 55. Engage the shaft into the main bearing. 56. Engage the first/second gear synchromesh outer member and the reverse idler gear. 57. Push the mainshaft home enough to allow the mainshaft spacer to be locatcd on the rear end, with the spacer larger diameter forward of the transfer gear lever cross -shaft. 60 58. Re-position the first-speed gear, thrust washers and thrust needle bearing correctly on the mainshaft. 59. Push the mainshaft fully home, ensuring that the thrust washers and needle bearing remain correctly located against the first -speed gear. 60. Move the mainshaft spacer along thc shaft, and into the oil seal, to abut the main bearing. 61. Temporarily fit the mainshaft transfer gear. 62. Position thc snap-ring in the groove in the mainshaft. 63. Hold the mainshaft fully to the rear and measure the clearance between the snap -ring and the transfer gear. 64. Select a shim washer to allow 0,050 mm (0.002 in) maximum clearance between the snap-ring and transfer gear when fitted. Shim range 1,8 to 2,O mm (0.071 to 0,079 in) in 0,OS mm (0.002 in) increments. ~~ 65. Temporarily remove the snap-ring and the fl 66. Slide back the mainshaft spacer as far as the transfer gear lever cross -shaft will allow. 67. Apply a thin coating of Loctite 275 grade to the exposed area of the mainshaft. 68. Push home the mainshaft spacer. 69. Fit the mainshaft transfer gear. 70. Fit the previously selected shim washer and secure with the snap -ring. 71. Fit the bottom cover to the transfer box using a new joint washer and evenly tighten the fourteen retaining bolts to the correct torque. 72. Fit the mainshaft rear bearing housing and roller bearing. 73. Assemble the main gearchange selectors to the gearbox. 74. Fit the front bearing plate. 75. Fit the bell housing. ....+I mainshaft transfer gear. e;v REMOVE AND OVERHAUL LAYSHAFT BEARINGS Special tools: R01004 - extractor mainshaft spacer 18G284 - extractor and 18G284AR - adaptor, extractor layshaft rear bearing outer member 18G47 - Press and 1SG47BA - Collars, extractor for layshaft bearing inner members 1. Remove the bell housing. 2. Remove the front cover and oil pump assembly. 3. Remove the main gears selectors. 4. Remove the front bearing plate assembly. 5. Remove the mainshaft assembly. 6. Press out the layshaft front bearing outer member from the front bearing plate. gy.. %; ;r 3 ST 1256M 56
LT 95 FOUR SPEED GEARBOX ,:.:.:.. i.: *:, 1 ... ... ..,; 7. Extract the layshaft rear bearing outer member from the gearbox casing, extiaetor 186284 and adaptor 18G284AR. 12. Press the rear bearing outer member into the 13. Enter the front bearing outer member into the .. I. :..:! gearbox casing. front bcaring plate. DO not fit fully in at this stage. 37 . 8. Withdraw the bearing inner members from the layshaft. Extractor 18647 press and 18G47BA col tars. n ST 1258M Check bearing pre-load 8. Repiacement bearings inner and outer membcrs are supplied as matched pairs and not as separate items. 10. The replacement bearings must not be degreased. Before fitting, lubricate with correct grade gearbox oil. Refer to lubrication chart. 11. Press the bearing inner members onto thc layshaft. IJ ST1259M 14. Remove the primary pinion from thc bearing plate. 15. Position the layshaft in the gearbox casing. 16. Temporarily fit the front bearing plate and joint washer. 17. Press in the front bearing outer member until thcrc is no end-float on the layshaft and no cnd-load on the bcarings. 18. On the bearing outer member position a shim washer of a thickncss suitable to stand 0,25 mm (0.010 in) approximately proud of the front bearing plate. This shim thickness may be subsequently adjusted depending on the amount of bearing pre-load it affords. 19. Temporarily remove the oil pump top cover and withdraw the pump drive gear. 20. Temporarily fit the front cover and new joint washer to the bearing plate. Ensure that the shim washer remains in position. c /- 57
37 21. Measure the rolling resistance of the layshaft, using a spring balance and a cord coiled around the layshaft larger diameter. The rolling rcsistance must be 7 to 3,38 kg (6 to 7.5 Ibs). REMOVE AND OVERHAUL DIFFERENTIAL LOCK ACTUATORASSEMBLY 1. Remove the four bolts and withdraw the assembly from front output shaft housing. 2. Remove the detent spring and ball. LT 95 FOUR SPEED GEARBOX 22. To adjust the pre-load, fit a replacemcnt shim or suitable thickness to the front bearing outer member. Shim range is from 1,55 mm (0.059 in) to 2,510 mm (0.098 in) in 0,05 mm (0.002 in) increments. 23. When the pre-load is satisfactory, remove thc front cover assembly. 24. Remove the front bcaring plate. 25. Fit the primary pinion. 26. Fit the oil pump cover and drive gear. 27. Fit the front bearing plate assembly. 28. Assemble the selectors for the main gears. 29. Fit the front cover and oil pump assembly. 30. Fit the bell housing. Dismantle and overhaul assembly 3. Remove thc differential lock warning switch and 4. Drive out the retaining pin. 5. Remove the actuator fixings. 6. Withdraw the actuator and shaft. 7. Withdraw the 0 ring seal. 8. Withdraw the joint washer. washers. 9. Fit a new 0 ring seal to actuator shaft. 10. Coat both sides of the joint washer with Hylomar 11. Fit the actuator and shaft and secui-c to the 12. Fit thc actuator shaft retaining pin. 13. Fit the diffcrential lock warning switch and PL32M. housing. washers. Assemble to gearbox 14. Fit the ball and detent spring. 15. Apply Hylomar PL32M jointing compound to both 16. Fit and secure the assembly to the gearbox and sides ot a new actuator housing joint washer. evenly tighten the four retaining bolts. 58