Inter-Tel GMX-48 INSTALLATION & MAINTENANCE Manual
Here you can view all the pages of manual Inter-Tel GMX-48 INSTALLATION & MAINTENANCE Manual. The Inter-Tel manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 61
INSTALLATION INTER-TEL PRACTICES Issue 2, May 1990 GMX-48 INSTALLATION & MAINTENANCE FIGURE 3-10. C.O. LINE TERMINATIONS FROM RJ-TYPE JACKS TO CENTRAL OFFICE RJ-TYPE JACK (2 C.O. LINES PER JACK) I I 000 000 ZIMER-EL KSU /’ ., MVU- I V-MVU / LINE CORD TWO-PAIR CABLE / FOUR-CONDUCTOR MODULAR JACK ASSEMBLY -I \-_ lvlvu- I “-Nlwl LINE CORD FIGURE 3-11. MODULAR JACK ASSEMBLY WIRING FOR C.O. LINES W/BL BL/w TIP 1 TIP2 I RING 1 RING 2 I Page 3-22
Page 62
‘. INTER-TEL PRACTICES GMX-48 INSTALLATION & MAINTENANCE INSTALLATION Issue 2, May 1990 C. C.O. LINES TERMINATED ON AN RJ-TYPE BLOCK 5.5 Before using this procedure, read the IMPOR- TRNT NOTES on page 3-21. Also, refer to Figure 3-12 below for a diagram of the complete layout. (1) Mount a C.O. block @Ml-50-type connecting block) on the MDF backboard. (2) For every two C.O. lines, mount a four-con- ductor modular jack assembly on the MDF backboard near the KSU. The modular jack as-...
Page 63
INSTALLATION Issue 2, May 1990 INTER-TEL PRACTICES GMX-48 INSTALLATION & MAINTENANCE 6. KEY SERVICE UNIT (KSU) INSTALLATION A. UNPACK THE EQUIPMENT 6.1 Unpack and inspect the KSU equipment follow- ing these guidelines. (1) Check the KSU components against the pack- ing slip and inspect them for damage. If any equipment is missing or damaged, contact your supplier immediately. (2) Check the KSU Control Board (KCB), Expan- sion Modules (EXPs), and Accessory Port Modules (APMs) as follows:...
Page 64
INTER-TEL PRACTICES GMX-48 INSTALLATION & MAINTENANCE INSTALLATION Issue 2, May 1990 FIGURE 3-13. KSU AND POWER SUPPLY LAYOUT - POWER SUPPLY AC POWER CABLE - DC POWER CABLE Page 3-25
Page 65
INSTALLATION Issue 2, May 1990 INTER-TEL PRACTICES GMX-48 INSTALLATION & MAINTENANCE Grounding Requirements a. 6.3 The KSU must be properly grounded to an earth ground point. A copper, cold water pipe is usually a good ground point; however, a properly installed ground rod is more effective. b. The ground lug on the bottom of the KSU. C. NOTE: According to UL 1459, “an insulated ground- ing conductor that is not smaller in size and equiva- lent in insulation material and thickness to the...
Page 66
INTER-TEL PRACTICES INSTALLATION GMX-48 INSTALLATION & MAINTENANCE Issue 2, May 1990 Voltage Surge/Spike Protection 4.7 To reduce the effects of AC voltage surges and spikes that may cause system malfunctions, false log- ic, and/or damage to the electronic components, it is recommended that a surge/spike protector be in- stalled. Check the manufacturer’s specifications to ensure that the device meets the following require- ments: 0 Clamp voltage transients at 300VDC within 5 nanoseconds...
Page 67
INSTALLATION INTER-TEL PRACTICES Issue 2, May 1990 GMX-48 INSTALLATION & MAINTENANCE FIGURE 3-15. DC POWER CABLE CONNECTOR PINOUT AND VOLTAGE TEST POINT LOCATIONS FRONT VIEW (LOOKING INTO CONNECTOR PINS ON THE END OF THE CABLE) &lZVDC RETURN + 3oVDC RETURN (GROUND) + 3ovDc (GROUND] -1PVDc TPl TO TP2 + 30 &2.0VDC (+ 28VDC TO + 32VDC) TP3 TO TP5 + 12.5 +O.GVDC (+ 1 i.OVDC TO + 13.1VDC) TP4 TO TP5 -12 +l.SVDC (-10.8VDC TO -13.2VDC) TP6 TO TP7 + 5.1 iyO.lVDC (+ 5.OVDC TO + 5.2VDC) . NOTE:...
Page 68
INTER-TEL PRACTICES INSTALLATION GMX-48 INSTALLATION & MAINTENANCE Issue 2, May 1990 C. ‘KSU CONTROL BOARD CONFIGURATION 6.9 Before installing any Expansion Modules (EXPs) or Accessory Port Modules (APMs), perform the following operations to the KSU Control Board (KCB). Refer to Figure 3-16 on page 3-31 for a draw- ing of the KCB and its attached Memory (MEM) Board. CAUTION The modules and components are static sensi- tive. Handle these units by the edges only and keep replacement...
Page 69
INSTALLATION Issue 2, May 1990 INTER-TEL PRACTICES GMX-48 INSTALLATION & MAINTENANCE (8) Check the station fuse on the bottom edge of the KSU Control Board. This should be a 2A, 25OV, AGC 2 (fast-acting) fuse. (9) If any of the odd-numbered station circuits are installed with secondary voice paths (refer to page 3-14), set the associated secondary voice path strap on the KSU Control Board in the OHVA position (over pins A and B). If the cir- cuit does not have a secondary voice path, en- sure...
Page 70
INTER-TEL PRACTICES GMX-48 INSTALLATION & MAINTENANCE INSTALLATION FIGURE 3-16. KSU CONTROL BOARD (KCB) RS-232-C /----BAUD RATE LED INDICATORS- BATTERY CHECK BUTTON - BACK-UP BATTERY STRAP - BATTERY VOLTAGE TEST POINTS -4 BACK-UP BATTERY - / MEM BOARD 1 SYSTEM VOLTAGE TEST POINTS MOH STRAPS--., DIP SWITCHES STATION SECONDARY ’ VOICE PATH STRAPS STAND-OFF - FUSE RS-232-C CONNECTOR RESET SWITCH -’ L-GROUND LUG Page 3-31