Home > GTE > Communications System > GTE Omni Scbs Installation And Maintenance Manual

GTE Omni Scbs Installation And Maintenance Manual

Here you can view all the pages of manual GTE Omni Scbs Installation And Maintenance Manual. The GTE manuals for Communications System are available online for free. You can easily download all the documents as PDF.

Page 311

-. 
l SBCS CAN FUNCTION AS A STANDALONE COMMUNICATION SYSTEM OR AS A FRONT-END SYSTEM BEHIND 
OTHER SWITCHING EQUIPMENT, SUCH AS A PABX. 
. SOME SYSTEM PARAMETER VALUES MAY REQUIRE RESETTING TO ACCOMMODATE CONFIGURATIONS 
POSSIBLE WITH A FRONT-END ARRANGEMENT. 
REFER TO CMC-100 TO COORDINATE FEATURE ACCESS NUMBERING PLANS FOR BOTH SYSTEMS AND 
CMC-200 TO COORDINATE STATION NUMBERING PLANS. 
1. USE CMC-250 TO MODIFY TRUNK ASSIGNMENT DATA: 
. EQUIPMENT NUMBER (Pl) CMC = 250 
. TYPE OF TRUNK (P2) Pl: 182...

Page 312

DESCRlPTlOii 
. ALLOWS SBCS TO BE SHARED BY AS MANY AS FIVE TENANTS. TENANTS MAY USE 
OWN STATIONS AND/OR TRUNKS, BUT SHARE COMMON CONTROL LOGIC, POWER 
SUPPLY, ATTENDANT CONSOLE, AND SERVICE TRUNKS. 
. STATIONS AND TRUNKS (EXCEPT TIE TRUNKS) ARE ASSIGNED TO TENANT 
NUMBERS SO EACH TENANT CAN ACCESS OWN TRUNKS. TENANTS SHARE SAME 
FEATURE ACCESS CODE AND STATION NUMBERING PLAN. 
. THREE TYPES OF TENANT TRUNK SHARING DESIGNATIONS ARE AVAILABLE: 
- OUTGOING/INCOMING TENANT (NO TRUNK SHARING WITH OTHER...

Page 313

pitEKE- 
I. USE CMC-20-l TO ASSlGN TENANT NUMBERS TO STATIONS: 
Q STATION DIRECTORY NUMBER (PI) 
8 OPERATION MODE (P2) 
. TYPE OF DIALING (P3) 
8 TENANT NUMBER (P4) CMC = 201 
Pl: 236 P4: 2 
cl 
P2: 1 P5: 
P3: 3 
@ METERING GROUP NUMBER FOR SMDR (P5) 
2. IF APPLICABLE, USE CMC-102 TO SELECT: 
. FLAG NUMBER (PI) 
@ SET VALUE (P2) 
3. USE CMC-251 TO ASSIGN TENANT NUMBERS TO TRUNKS: 
@ EQUIPMENT NUMBER (PI) 
Pl: 161 P4: 3 
. DIAL MODE/BREAK RATIO (P2) 
@ TRUNK DIRECTORY NUMBER (P3) 
If ‘I  e TENANT NUMBER...

Page 314

Programming Speci 
System Configurations/ 
Off-Premises Extension (OPX) 
I I 
. ALLOW CONNECTION TO THE SBCS SYSTEM OF SINGLE-LINE TELEPHONE INSTRUMENTS LOCATED AT OFF-PREMISES 
LOCATION. 
. CUSTOMER PROVIDED LOOP EXTENDER MUST BE INSTALLED TO EXTEND STATION LINES AND TO PROTECT PUBLIC 
SWITCHED NETWORK, IF THE IMPEDANCE OF THE PHONE EXCEEDS THE LOOP LIMIT OF THE SYSTEM. 
. OFF PREMISES EXTENSION (OPX) EQUIPMENT IS MOUNTED AND POWERED EXTERNALLY TO OMNI SBCS CABINET. 
. RINGING PATTERN FOR OPX STATIONS...

Page 315

e SBCS BEHIND A PAl3X CMC-250 
CMC-254 
CMC-400 
e 
TENANT ASSIGNMENT CMC-201 
CMC-251 
CMC-503 
8 
OFF-PREMISE EXTENSION CMC-200 
CMC-204 
CMC-102 MODIFY TRUNK ASSIGNMENT DATA 
MODIFY TRUNK ROUTE TIMING ASSIGNMENT 
MODIFY TRUNK DIALING ASSIGNMENT 
ASSIGN TENANT NUMBERS TO STATIONS 
ASSIGN TENANT NUMBERS TO TRUNKS 
ASSIGN SMDR OUTPUT FOR TENANTS 
ASSIGN OPX EQUIPMENT NUMBER TO STATION 
DIRECTORY NUMBER 
IDENTIFY DIRECTORY NUMBER AS OPX EXTENSION 
CHANGE RINGING PATTERN FOR OPX FIXED 
RINGING 
2.200  

Page 316

2.201  

Page 317

PERFORM THE FOLLOWING PROGRAMMING TASKS IN THE SEQUENCE OUTLINED BELOW USING THE 
SAMPLE WORK ORDERS AND IN ACCORDANCE WlTH THE GTE OMNll SBCS GTEP MANUAL. COMPLETE 
THE REVIEW EXERClSE QUESTlONS PERTAINING TO SPECIAL SYSTEM CONFIGURATIONS UPON 
COMPLETION OF THIS LABORATORY ACTIVITY. 
WORK ORDER 
#2.11 
:OMPANY NAME: NU SYSTEM CO. 
PHONE #: (703) 5551212 
.OCATION: 
RESTON, VIRGINIA WORK ORDER #2.11 (TASK #l) 
)RfGfNATCR: TELECOMMUNICATIONS MANAGER 
‘ASKS: 
s Perform necessary system modifications...

Page 318

Laboratory Activity - Programming 
WORK ORDER #2.11 
:OMPANY NAME: NU SYSTEM CO. 
PHONE #: (703) 5551212 
.OCAT’ON: RESTON, VIRGINIA WORK ORDER H.11 (TASK #2) 
)R’G’NAToR: TELECOMMUNICATIONS MANAGER 
.ASKS: 
e Assign tenant assignments with CMC-201, CMC-102, and CMC-251. 
(1) Assign stations to tenant numbers with CMC- (1) Perform programming changes for special 
201 using the following groups: system configuration. 
Station DN Tenant Group (2) Check/test the operation of changes after 
completion of...

Page 319

WORK ORDER #2.11 
:OMPANY NAME: NU SYSTEM CO. PHONE #: (703) 5551212 
OCATION: RESTON, VIRGINIA 
WORK ORDER #2.11 (TASK #3) 
‘RlGtNATCR: TELECOMMUNICATIONS MANAGER 
ASKS: 
--- l Perform programming required for single line station designated-as off-premises extension 
with CMC-200, CMC-204, and CMC-102. 
OPX equipment number 027 has (1) Ensure that off-premises SLT instrument and 
gned to the SLT instrument (directory customer provided loop extender are 
physically installed. 
NOTE: Above verification is...

Page 320

Review Exercise - 53 
INSTRUCTIONS: THE FOLLOWING EXERCISE CONSISTS OF MULTIPLE CHOICE, TRUE/FALSE, FILL 
IN THE BLANK, OR MATCHING TYPE QUESTIONS. ALL AVAILABLE RESOURCES (I.E. STUDENT 
WORKBOOK, NOTES, AND GTEP MANUAL) MAY BE USED AS REFERENCES. SUBMIT EXERCISE TO 
INSTRUCTOR FOR GRADING WHEN LAST QUESTION HAS BEEN COMPLETED. 
1. EXPLAIN WHY IT IS NECESSARY TO EXAMINE TABLES FOR CMC-100 AND CMC-200 WHEN 
INSTALLING AN OMNI SBCS BEHIND A PABX. 
2. HOW WOULD YOU INCREASE THE OMNI SBCS FLASH TIMING VALUE...
Start reading GTE Omni Scbs Installation And Maintenance Manual

Related Manuals for GTE Omni Scbs Installation And Maintenance Manual

All GTE manuals