Page 61

GE HEALTHCARE
DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL
Section 3-1 - Overview 3-1
Chapter 3
Installation
Section 3-1
Overview
3-1-1 Purpose of Chapter 3
This chapter contains information needed to install the unit. Included are references to a procedure that 
describes how to receive and unpack the equipment and how to file a damage or loss claim.
How to prepare the facility and unit of the actual installation, and how to check a nd test the unit, probes, 
and external peripherals for...

Page 62

GE HEALTHCARE
DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL 
3-2 Section 3-1 - Overview
Section 3-2
Installation Reminders
3-2-1 Average Installation Time
The LOGIQ™ P5/A5/A5Pro has been designed to be installed and checked out by an experienced 
service technician in approximately four hours. LOGIQ™ P5/A5/A5Pro consoles with optional 
equipment may take slightly longer.
3-2-2 Installation Warnings
1.) Since the LOGIQ™ P5/A5/A5Pro weighs approximat ely 75 kg.(165 lb.) without options,...

Page 63

GE HEALTHCARE
DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL
Section 3-1 - Overview 3-3
3-2-3 Safety Reminders
DANGERWHEN USING ANY TEST INSTRUMENT THAT IS CAPABLE OF OPENING THE 
AC GROUND LINE (I.E., METER’S GROU N D  S W I T C H  I S  OPEN), DON’T TOUCH 
THE UNIT!
CAUTIONTwo people should unpack the unit because of  its weight. Two people are required whenever 
a part weighing 19kg (35 lb.)  or more must be lifted.
CAUTIONIf the unit is very cold or hot, do not turn on its power until it has...

Page 64

GE HEALTHCARE
DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL 
3-4 Section 3-1 - Overview
Section 3-3
Receiving and Unpacking the Equipment
When a new system arrives, check that any components are not damaged and are not in short supply. 
If shipping damage or shortage occurs, contact the address shown in Chapter 1.
1.) Cut the three PLASTIC BANDs.
Figure 3-2   Cutting the Plastic Bands.
CAUTIONDo not lift the unit by the Keyboard. Equipment damage may result.
CAUTIONThe crate with the LOGIQ™...

Page 65

GE HEALTHCARE
DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL
Section 3-1 - Overview 3-5
Section 3-3      Receiving and Unpacking the Equipment (cont’d)
2.) Lift the TOP COVER up and off.
Figure 3-3   Removing the top Cover
Top Cover 

Page 66

GE HEALTHCARE
DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL 
3-6 Section 3-1 - Overview
Section 3-3      Receiving and Unpacking the Equipment (cont’d)
3.) Remove the Top Plate up and off..
Figure 3-4   Removing the Top Plate
Top Plate 

Page 67

GE HEALTHCARE
DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL
Section 3-1 - Overview 3-7
Section 3-3      Receiving and Unpacking the Equipment (cont’d)
4.) Remove the three PLASTIC JOINTs from the OUTER SLEEVE.
5.) Remove the OUTER SLEEVE.
Figure 3-5   Removing Plastic Joints and Sleeves
Plastic Joint Outer Sleeve
Palette Assy 

Page 68

GE HEALTHCARE
DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL 
3-8 Section 3-1 - Overview
Section 3-3      Receiving and Unpacking the Equipment (cont’d)
6.) Remove the MONITOR SUPPORTER and Option Box.
7.) Remove the PLASTIC BAG.
8.) Unlock the front caster and carefu lly put the console off the PALETTE.
Figure 3-6   Moving the LOGIQ™ P5/A5/A5Pro from the crate
Monitor Pad 

Page 69

GE HEALTHCARE
DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL
Section 3-1 - Overview 3-9
3-3-1 Moving into Position
In general, a single adult can move the LOGIQ™ P5/A5/A5Pro along an even surface with no steep 
grades. At least two people should move the machine when la rge humps, grooves, or grades will be 
encountered. (It is better to pull from the rear rather  than push from the front of the unit). Before moving, 
store all loose parts in the unit. Wrap transducers in soft cloth or foam to...

Page 70

GE HEALTHCARE
DIRECTION 5394141, REVISION  1 LOGIQ™ P5 SERVICE MANUAL 
3-10 Section 3-4 - Preparing for Installation
Section 3-4
Preparing for Installation
3-4-1 Verify Customer Order
Compare items received by the customer to that whic h is listed on the delivery order. Report any items 
that are missing, back ordered or damaged.
3-4-2 Physical Inspection
3-4-2-1 System Voltage Settings
Verify that the scanner is set to the correct voltage.
The Voltage settings for the LOGIQ™ P5/A5/A5Pro Scanner is found...