GE Cardiocap 5 Service Manual
Here you can view all the pages of manual GE Cardiocap 5 Service Manual. The GE manuals for Health/Medical Alert are available online for free. You can easily download all the documents as PDF.
Page 161
Measurement Parameters Figure 6-25. Signal processing Figure 6-26. Control logic Figure 6-27. Calibration data stored in EEPROM 6-33
Page 162
Cardiocap/5 Technical Reference Manual 6.7 NMT components 6.7.1 NMT board The NMT circuit board consists of the following functional sections: • Constant current stimulator. • Measuring electronics for the EMG signals. • Microprocessor for stimulation and measurement control, and for counting measurement results. • Serial communication. The serial bus speed is 500 kbps and the bus itself is half duplex (data can be transferred in both directions but only one way at a time). Serial...
Page 163
Measurement Parameters 6.7.2 Front panel connector (NMT) NMT connector Pin No. Signal 1 2 3 4 5 6 7 8 9 10 EMG signal + EMG signal – Not used Stimulus + Stimulus – Ground Not connected Sensor identification +5 V Mechanical signal 6.7.3 Module bus connector Pin No. I/O Signal 1 I RESET_RS485 2 I –15 VDC 3 I +15 VDIRTY 4 I +15 VDC 5 I/O –DATA_RS485 6 I/O DATA_RS485 7 – Ground & Shield 8 I –RESET_RS485 9 I CTSB 10 O RTSB 11 I RXDB 12 O TXDB 13 – Ground &...
Page 165
Contents Chapter 7. Service Procedures 7.1 General service information..................................................7-1 7.2 Monitor software installation................................................7-1 “Cold start” instructions........................................................................\ .....7-1 “Warm start” instructions........................................................................\ ...7-1 7.3 Replacement...
Page 166
Cardiocap/5 Technical Reference Manual Oxygen measuring (OM) unit ..................................................................... 7-14 TPX measurin g unit ........................................................................\ .......... 7-14 PVX measurin g unit........................................................................\ .......... 7-14 Gas unit CPU board........................................................................\ .......... 7-14 7.4.7 Gas sampling system leak...
Page 167
Service Procedures 7. SERVICE PROCEDURES 7.1 General service information Field service of the Cardiocap/5 monitor is limited to replacing faulty circuit boards, mechanical parts, or a real-time clock battery. Some boards may be returned to GE Healthcare for exchange. For service advice from GE Healthcare, please provide the unit serial number, full type designation, and a detailed fault description. CAUTION: Only trained personnel with the appropriate tools and equipment shall perform the tests...
Page 168
Cardiocap/5 Technical Reference Manual 7.3 Replacement procedures NOTE: Reassembly is essentially the reverse of disassembly. When reassembling the unit, make sure that the cables and tubes, if any, are not pinched between the boards. Tools • Screwdriver (pozidrive) • Hexagon driver (3.0 mm) • Pliers • Cable tie 7.3.1 Disassembling the frame assembly 1. Remove the 4 hexagon and 13 pozidrive screws that hold the back cover. 2. To pull the front-cover unit apart from the inner-parts unit,...
Page 169
Service Procedures 7.3.3 ECG, NIBP, and STP board replacement The NESTPR unit must be removed before you can replace the ECG, NIBP, or STP boards. NESTPR unit removal You may separate the display from the frame to gain better access to the NESTPR unit, but it is not necessary. To remove the unit without separating the display: 1. Disconnect the 5 patient-connector cables from the front panel. Important: For reassembly, note the connection of temperature cable T1 (black wires) and, for monitors...
Page 170
Cardiocap/5 Technical Reference Manual 7.3.5 Gas unit CPU board, pump, and fan replacement The airway gas unit must be removed before you can replace the gas unit CPU board, the pump, or the fan. Airway-gas unit removal 1. Move the backplate unit out of the way to access the airway gas unit (see Backplate unit removal). 2. Unfasten the 3 screws and washers that hold the locking chock and remove the chock. 3. If installed, disconnect the hook-and-loop strap. 4. Disconnect the 2 tubes from the...
All GE manuals