Yamaha Yzf R1 2007 Manual
Have a look at the manual Yamaha Yzf R1 2007 Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 255 Yamaha manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
LUBRICATION SYSTEM CHART AND DIAGRAMS 2-34 1. Cylinder head 2. Crankshaft
COOLING SYSTEM DIAGRAMS 2-35 EAS20420 COOLING SYSTEM DIAGRAMS
COOLING SYSTEM DIAGRAMS 2-36 1. Water pump 2. Radiator 3. Radiator fan
COOLING SYSTEM DIAGRAMS 2-38 1. Radiator cap 2. Radiator 3. Oil cooler 4. Thermostat
CABLE ROUTING 2-40 1. Ground lead 2. Meter lead 3. Headlight stay 4. Right headlight lead (high beam) 5. Right auxiliary light lead 6. Intake air temperature sensor coupler 7. Headlight lead 8. Left Auxiliary light lead 9. Left headlight lead (high beam) 10.Right console panel 11.Right intake air duct 12.Left intake air duct 13.Left console panel A. Insert to the rib of the head light. (Either location of the right and left relays is acceptable.) B. The lead should not stretch too much. Direction of the ground terminal can be either top side or flip side. C. Make sure to insert the coupler and boot to the stay hole. D. The speedometer lead should not be strained. E. To the headlight stay hole F. Route by the rear side of the vehicle away from the right auxiliary light lead. G. Connect after passing over the upper side of the duct. H. To the turn signal light I. Paste the latch of the clamp to be posi- tioned toward the rear side of the vehicle. J. There should be no slack when clamping. Point the tip of the clamp (excessive part) to the front side of the vehicle. Fasten the headlight lead with a clamp. K. Clamp the headlight lead. Cut the tip of the clamp. L. To the wire harness M. Route by the rear side of the vehicle away from the left auxiliary light lead. N. Feed a lead wire through the U shape cut- out of the console panel.
CABLE ROUTING 2-42 1. Right handlebar switch lead 2. Clutch cable 3. Main switch lead 4. Left handlebar switch lead 5. Horn lead 6. Horn 7. Throttle cables 8. Brake hose 9. Throttle cable (return side) 10.Throttle cable (pull side) A. Route the clutch cable so as to get along the front side of the main switch after pass- ing it through the guide. B. Pass the main switch lead through the guide wire. C. Pass the left handlebar switch lead through the guide wire. D. Pass the clutch switch lead through outside of the left handlebar switch lead. E. Point the tip of the band (excessive part) to the left side of the vehicle and cut the sur- plus section. F. Clamp the section between 0 and 20 mm (0 and 0.79 in) from the split of the under bracket. G. Clamp the leads inside the front fork of the vehicle. Point the exit of the horn lead to the left front fork side. H. Fit in the clamp from the inner side to the outer side of the vehicle so that the return side is positioned upper and the pull side is lower at the upper side of the vehicle above the brake hose. I. 0 to 30 mm (0 to 1.18 in) J. Route two throttle cables behind the brake hose, pass between the inside of the under bracket’s upper side front fork. K. 20 to 40 mm (0.8 to 1.6 in) L. Point the tip of the band (excessive part) to the right side of the vehicle and cut the sur- plus section. M. Pass the left handlebar switch lead through upper side of the steering damper bracket. N. Cut the clamp tip leaving 2 to 4 mm (0.08 to 0.16 in). O. Outside of the vehicle. P. Inside of the vehicle.