NDA-24234 CHAPTER 3
Page 41
Revision 3.0
INSTALLATION PROCEDURE
This NAP explains the procedures for marking, drilling and other necessary work when the PBX is to be installed
on a free-access floor by either one of the following three methods.
Securing the PBX directly onto the floor
Securing the PBX with the special stand
Securing the PBX with the floor elevation
This NAP also explains the procedures for marking, leveling and drilling for MDF, Power Equipment, and Peripheral
Equipment (See Section...

Page 72

CHAPTER 3 NDA-24234
Page 42
Revision 3.0
INSTALLATION PROCEDURE
1. WHEN SECURING THE PBX DIRECTLY ONTO THE FLOOR
NAP-200-002
Sheet 2/8
Marking, Leveling, and Drilling
START
Marking Referring to Figure 002-1, mark the holes for the 
anchor bolts of the base unit.
Drilling Drill holes at the locations marked for base unit.
Cutting of Free-Access Floor Referring to Figure 002-2, cut the free-access floor at 
the marked cable locations by using a jigsaw.
Leveling Measure the level of floor surface of the...

Page 73

NDA-24234 CHAPTER 3
Page 43
Revision 3.0
INSTALLATION PROCEDURE
Figure 002-1  Locations of Base Unit Securing Holes
NAP-200-002
Sheet 3/8
Marking, Leveling, and Drilling
Multiple IMG ConfigurationSingle IMG Configuration
85(3.35)55(2.17)
410(14.14)    550
(19.65)
 40
(1.57)   520
(18.47)40(1.57)
   600
(111.62)
Unit: mm(inch)
85(3.35)55(2.17)
410(14.14)    550
(19.65)
 40
(1.57)
 120
(4.72)    520
(18.47)
   600
(111.62)   520
(18.47)
   600
(111.62)
 120
(4.72) 120
(4.72)
   520
(18.47)
   600
(111.62)...

Page 74

CHAPTER 3 NDA-24234
Page 44
Revision 3.0
INSTALLATION PROCEDURE
Figure 002-2  Cable Hole on a Free-Access or Computer Floor
NAP-200-002
Sheet 4/8
Marking, Leveling, and Drilling
REAR
FRONT
PBX
CABLE HOLE
FREE-ACCESS FLOOR
Unit: mm(inch) 100(3.94)
115(4.53)    370
(12.57)
  550
(19.65)
    600
(111.62)115(4.53) 

Page 75

NDA-24234 CHAPTER 3
Page 45
Revision 3.0
INSTALLATION PROCEDURE
2. WHEN SECURING THE PBX WITH THE SPECIAL STAND
NAP-200-002
Sheet 5/8
Marking, Leveling, and Drilling
START
Marking and Drilling of Special 
StandDrill the Special Stand for securing the PBX. 
(See Figure 002-3.)
Marking, Drilling and Cutting of 
Free-Access FloorMark, drill, and cut the free-access floor according to 
the size of the special stand to be used.
Installing the Special Stand Secure the special stand onto the floor. 
(See Figure...

Page 76

CHAPTER 3 NDA-24234
Page 46
Revision 3.0
INSTALLATION PROCEDURE
Figure 002-3  Example of Special Stand
Figure 002-4  Special Stand Installation Method
NAP-200-002
Sheet 6/8
Marking, Leveling, and Drilling
520
(18.47)
40
(1.57)
85
(3.35) 410
(14.14)
550
(19.65) 55
(2.17)
HOLE FOR SECURING
BASE UNIT
Unit: mm(inch)
FRONTPBX
TOPU
PIM
LPM
FREE-ACCESS
OR COMPUTER FLOOR
SPECIAL STAND
ANCHOR BOLT 

Page 77

NDA-24234 CHAPTER 3
Page 47
Revision 3.0
INSTALLATION PROCEDURE
3. WHEN SECURING PBX WITH FLOOR ELEVATIONS
Figure 002-5  Example of Elevation
NAP-200-002
Sheet 7/8
Marking, Leveling, and Drilling
START
Installing the Floor Elevation Secure the Floor Elevation on the concrete floor. 
(See Figure 002-5.)
Marking Mark the locations of the anchor bolt holes for the Base Unit. 
(See Figure 002-1.)
Drilling Drill holes in the locations.
Cutting of Free-Access Floor Cut the Free-Access Floor with a jigsaw. (See...

Page 78

CHAPTER 3 NDA-24234
Page 48
Revision 3.0
INSTALLATION PROCEDURE
4. MARKING, LEVELING AND DRILLING FOR MDF, POWER EQUIPMENT, AND PERIPHERAL EQUIPMENT
NAP-200-002
Sheet 8/8
Marking, Leveling, and Drilling
START
Leveling Measure the level of floor surface and determine the reference 
level.
Marking Mark the holes for securing 
equipmentPower Equipment
MDF
Peripheral Equipment
Drilling Drill holes locations marked for power equipment, MDF, and 
peripheral equipment.
Secure the anchor bolts to the floor....

Page 79

NDA-24234 CHAPTER 3
Page 49
Revision 3.0
INSTALLATION PROCEDURE
This NAP explains the procedure for unpacking and inspection.
Note 1:If any equipment is missing or damaged, report it to the supplier immediately.
Note 2:Save all packing materials and boxes so that they can be used to return damaged equipment to the supplier.
1. UNPACKING
NAP-200-003
Sheet 1/2
Unpacking and Inspection
START
Quantity check Check the quantity of packages received against the 
Packing List.
Check for external damage Check the...

Page 80

CHAPTER 3 NDA-24234
Page 50
Revision 3.0
INSTALLATION PROCEDURE
2. INSPECTION
NAP-200-003
Sheet 2/2
Unpacking and Inspection
START
Visually Inspect Modules and Units Overall distortion.
Scratches or dents on the surface.
Distortion of shelves.
Cracks to connectors on the backplane.
Broken or bent pins on the backplane.
Circuit Cards
Provide protection from static 
electricity.Scratches and cracks.
Loose wires and parts.
Damage to card puller tabs.
Desk Console and MAT Scratches and dents on the body....