NEC Neax 2400 Imx Installation Manual
Here you can view all the pages of manual NEC Neax 2400 Imx Installation Manual. The NEC manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 71
NDA-24234 CHAPTER 3 Page 41 Revision 3.0 INSTALLATION PROCEDURE This NAP explains the procedures for marking, drilling and other necessary work when the PBX is to be installed on a free-access floor by either one of the following three methods. Securing the PBX directly onto the floor Securing the PBX with the special stand Securing the PBX with the floor elevation This NAP also explains the procedures for marking, leveling and drilling for MDF, Power Equipment, and Peripheral Equipment (See Section...
Page 72
CHAPTER 3 NDA-24234 Page 42 Revision 3.0 INSTALLATION PROCEDURE 1. WHEN SECURING THE PBX DIRECTLY ONTO THE FLOOR NAP-200-002 Sheet 2/8 Marking, Leveling, and Drilling START Marking Referring to Figure 002-1, mark the holes for the anchor bolts of the base unit. Drilling Drill holes at the locations marked for base unit. Cutting of Free-Access Floor Referring to Figure 002-2, cut the free-access floor at the marked cable locations by using a jigsaw. Leveling Measure the level of floor surface of the...
Page 73
NDA-24234 CHAPTER 3 Page 43 Revision 3.0 INSTALLATION PROCEDURE Figure 002-1 Locations of Base Unit Securing Holes NAP-200-002 Sheet 3/8 Marking, Leveling, and Drilling Multiple IMG ConfigurationSingle IMG Configuration 85(3.35)55(2.17) 410(14.14) 550 (19.65) 40 (1.57) 520 (18.47)40(1.57) 600 (111.62) Unit: mm(inch) 85(3.35)55(2.17) 410(14.14) 550 (19.65) 40 (1.57) 120 (4.72) 520 (18.47) 600 (111.62) 520 (18.47) 600 (111.62) 120 (4.72) 120 (4.72) 520 (18.47) 600 (111.62)...
Page 74
CHAPTER 3 NDA-24234 Page 44 Revision 3.0 INSTALLATION PROCEDURE Figure 002-2 Cable Hole on a Free-Access or Computer Floor NAP-200-002 Sheet 4/8 Marking, Leveling, and Drilling REAR FRONT PBX CABLE HOLE FREE-ACCESS FLOOR Unit: mm(inch) 100(3.94) 115(4.53) 370 (12.57) 550 (19.65) 600 (111.62)115(4.53)
Page 75
NDA-24234 CHAPTER 3 Page 45 Revision 3.0 INSTALLATION PROCEDURE 2. WHEN SECURING THE PBX WITH THE SPECIAL STAND NAP-200-002 Sheet 5/8 Marking, Leveling, and Drilling START Marking and Drilling of Special StandDrill the Special Stand for securing the PBX. (See Figure 002-3.) Marking, Drilling and Cutting of Free-Access FloorMark, drill, and cut the free-access floor according to the size of the special stand to be used. Installing the Special Stand Secure the special stand onto the floor. (See Figure...
Page 76
CHAPTER 3 NDA-24234 Page 46 Revision 3.0 INSTALLATION PROCEDURE Figure 002-3 Example of Special Stand Figure 002-4 Special Stand Installation Method NAP-200-002 Sheet 6/8 Marking, Leveling, and Drilling 520 (18.47) 40 (1.57) 85 (3.35) 410 (14.14) 550 (19.65) 55 (2.17) HOLE FOR SECURING BASE UNIT Unit: mm(inch) FRONTPBX TOPU PIM LPM FREE-ACCESS OR COMPUTER FLOOR SPECIAL STAND ANCHOR BOLT
Page 77
NDA-24234 CHAPTER 3 Page 47 Revision 3.0 INSTALLATION PROCEDURE 3. WHEN SECURING PBX WITH FLOOR ELEVATIONS Figure 002-5 Example of Elevation NAP-200-002 Sheet 7/8 Marking, Leveling, and Drilling START Installing the Floor Elevation Secure the Floor Elevation on the concrete floor. (See Figure 002-5.) Marking Mark the locations of the anchor bolt holes for the Base Unit. (See Figure 002-1.) Drilling Drill holes in the locations. Cutting of Free-Access Floor Cut the Free-Access Floor with a jigsaw. (See...
Page 78
CHAPTER 3 NDA-24234 Page 48 Revision 3.0 INSTALLATION PROCEDURE 4. MARKING, LEVELING AND DRILLING FOR MDF, POWER EQUIPMENT, AND PERIPHERAL EQUIPMENT NAP-200-002 Sheet 8/8 Marking, Leveling, and Drilling START Leveling Measure the level of floor surface and determine the reference level. Marking Mark the holes for securing equipmentPower Equipment MDF Peripheral Equipment Drilling Drill holes locations marked for power equipment, MDF, and peripheral equipment. Secure the anchor bolts to the floor....
Page 79
NDA-24234 CHAPTER 3 Page 49 Revision 3.0 INSTALLATION PROCEDURE This NAP explains the procedure for unpacking and inspection. Note 1:If any equipment is missing or damaged, report it to the supplier immediately. Note 2:Save all packing materials and boxes so that they can be used to return damaged equipment to the supplier. 1. UNPACKING NAP-200-003 Sheet 1/2 Unpacking and Inspection START Quantity check Check the quantity of packages received against the Packing List. Check for external damage Check the...
Page 80
CHAPTER 3 NDA-24234 Page 50 Revision 3.0 INSTALLATION PROCEDURE 2. INSPECTION NAP-200-003 Sheet 2/2 Unpacking and Inspection START Visually Inspect Modules and Units Overall distortion. Scratches or dents on the surface. Distortion of shelves. Cracks to connectors on the backplane. Broken or bent pins on the backplane. Circuit Cards Provide protection from static electricity.Scratches and cracks. Loose wires and parts. Damage to card puller tabs. Desk Console and MAT Scratches and dents on the body....