NEC Neax 2400 Imx Installation Manual
Here you can view all the pages of manual NEC Neax 2400 Imx Installation Manual. The NEC manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 121
NDA-24234 CHAPTER 3 Page 91 Revision 3.0 INSTALLATION PROCEDURE 5. INSTALLATION OF CPR This Section explains the procedure to install the CPR into the LPM. Perform the following ([1] through [5]) for both CPR0 and CPR1. 1. Using the Phillips Screwdriver, remove the 4 + 8 screws. Then, detach the front panel and top cover from the CPR. (Refer to Figure 009-4.) Figure 009-4 Removal of Front Panel and Top Cover from CPR NAP-200-009 Sheet 7/11 Setting of Switch Positions and Mounting of Circuit Cards AT T...
Page 122
CHAPTER 3 NDA-24234 Page 92 Revision 3.0 INSTALLATION PROCEDURE 2. Depending on the system configuration, insert the ISAGT (PZ-GT13/16) and LANI (PZ-PC19) cards into the following slots of the CPR (refer to Figure 009-5): ISAGT (PZ-GT13/16) →Slot #6 (ISA) (Fixed) LANI →Slot #0 (PCI) (For Fusion Link) LANI →Slot #1 (PCI) (When connecting MAT via 10-BASE T and PCI buses) LANI →Slot #3 (PCI) (When LANI for Fusion Link is in dual configuration: avail- able for Release 3 or later software) Figure 009-5...
Page 123
NDA-24234 CHAPTER 3 Page 93 Revision 3.0 INSTALLATION PROCEDURE 3. Attach the top cover and front panel again by fastening the removed screws. (Refer to Figure 009-6.) Figure 009-6 Reattachment of CPR Top Cover and Front Panel NAP-200-009 Sheet 9/11 Setting of Switch Positions and Mounting of Circuit Cards AT T E N T I O NContents Static Sensitive Handling Precautions Required Top Cover CPRFront Panel After mounting the ISAGT/LANI cards, reattach the top cover by tightening the 8 screws. Then, also...
Page 124
CHAPTER 3 NDA-24234 Page 94 Revision 3.0 INSTALLATION PROCEDURE 4. After turning “ON” the MBR key on the DSP of the CPR, insert the CPR into the LPM. Then, fasten the four screws. (Refer to Figure 009-7.) Figure 009-7 Accommodation of New CPR into LPM NAP-200-009 Sheet 10/11 Setting of Switch Positions and Mounting of Circuit Cards AT T E N T I O NContents Static Sensitive Handling Precautions Required CPR LPM As shown in the figure below, insert the CPR into the LPM. Then, fasten the four screws.
Page 125
NDA-24234 CHAPTER 3 Page 95 Revision 3.0 INSTALLATION PROCEDURE 5. Finally, insert the HFD into the CPR. Then, fasten the two screws. (Refer to Figure 009-8.) Figure 009-8 Insertion of New HFD into CPR NAP-200-009 Sheet 11/11 Setting of Switch Positions and Mounting of Circuit Cards ATTENTIONContents Static Sensitive Handling Precautions Required LPM HFD (PZ-IO27/28) By using the two screws, fasten the HFD onto the CPR.
Page 126
CHAPTER 3 NDA-24234 Pag e 96 Revision 3.0 INSTALLATION PROCEDURE This NAP explains how to run the following internal cables between Modules. NAP-200-010 Sheet 1/71 Internal Cable Connections START Confirm connector locations Referring to Figures 010-1 through 010-4, confirm the locations of the connectors into which the internal cables are inserted. Connection of FANU cables Referring to the figures listed in Figures 010-4 through 010-9, connect FANU cables. Connection of Internal Power Cables...
Page 127
NDA-24234 CHAPTER 3 Page 97 Revision 3.0 INSTALLATION PROCEDURE Since Cable connections vary depending on the system configuration which includes how many Port Interface Mod- ules (PIMs) are accommodated in the system or whether redundancy is taken into account as to the CPU. Before starting cable connections, find your system in “Quick Reference Table.” When you find your system in the table, open the related pages, on which necessary information is provided, and then set about the cable connections....
Page 128
CHAPTER 3 NDA-24234 Pag e 98 Revision 3.0 INSTALLATION PROCEDURE NAP-200-010 Sheet 3/71 Internal Cable Connections Table 010-1 Quick Reference Table (2/6) SYSTEM TYPE KIND OF CABLE FRAME NAME FIGURE TABLE Power CableIMG0010-13 010-6 IMG1010-16 010-9 Internal CableIMG0010-30 010-19 IMG1010-33 010-22 Inter-Frame Bus Cable IMG0-IMG1011-1 011-1 011-2 011-2 Inter-Frame Alarm Bus CableIMG0-IMG1011-11 011-11 Power CableIMG0010-13 010-6 IMG1010-17 010-10 Internal CableIMG0010-30 010-19 IMG1010-34 010-23...
Page 129
NDA-24234 CHAPTER 3 Page 99 Revision 3.0 INSTALLATION PROCEDURE NAP-200-010 Sheet 4/71 Internal Cable Connections Table 010-1 Quick Reference Table (3/6) SYSTEM TYPE KIND OF CABLE FRAME NAME FIGURE TABLE Power CableIMG0010-13 010-6 IMG1010-17 010-10 IMG2010-19 010-12 Internal CableIMG0010-30 010-19 IMG1010-34 010-23 IMG2010-35- Inter-Frame Bus CableIMG0-IMG1011-1 011-1 011-2 011-2 IMG1-IMG2011-4 011-4 Inter-Frame Alarm Bus CableIMG0-IMG1011-11 011-11 IMG0-IMG2011-12 011-12 Power CableIMG0010-13 010-6...
Page 130
CHAPTER 3 NDA-24234 Pag e 10 0 Revision 3.0 INSTALLATION PROCEDURE NAP-200-010 Sheet 5/71 Internal Cable Connections Table 010-1 Quick Reference Table (4/6) SYSTEM TYPE KIND OF CABLE FRAME NAME FIGURE TABLE Power CableIMG0010-13 010-6 IMG1010-17 010-10 IMG2010-21 010-14 Internal CableIMG0010-30 010-19 IMG1010-34 010-23 IMG2010-37- Inter-Frame Bus CableIMG0-IMG1011-1 011-1 011-2 011-2 IMG1-IMG2011-6 011-6 Inter-Frame Alarm Bus CableIMG0-IMG1011-11 011-11 IMG0-IMG2011-12 011-12 Power CableIMG0010-13...