Page 161
NDA-24234 CHAPTER 3 Page 131 Revision 3.0 INSTALLATION PROCEDURE Figure 010-19 Power Cable Connection for IMG2/3 (2-PIM System) (Multiple IMG Configuration) NAP-200-010 Sheet 36/71 Internal Cable Connections PWR A Connect the internal power cables for 2-PIM system of IMG2/3 as shown below. Note that the dotted lines indi- cate power cables for a dual-system. PA 0 PA 1 PB 0 PB 1 PA 2 00 01 PWR 00 01 PWR 02 03 PWR 02 03 PWR PZ-M371 (1) (3) (5) (7) (2) (4) (6) (8) BASEU DUMMY BASEU PIM 0PIM 0...
Page 162
CHAPTER 3 NDA-24234 Page 132 Revision 3.0 INSTALLATION PROCEDURE NAP-200-010 Sheet 37/71 Internal Cable Connections Table 010-12 Power Cable Connection for IMG2/3 (2-PIM System) (Multiple IMG Configuration) No.FROM TO CABLE NAME REMARKS UNIT/MODULECONNECTOR NAMEUNIT/ MODULECONNECTOR NAME 1 BASEU PA1 PIM0 PWR A 4P PWR CA-C 2 BASEU PB1 PIM0 PWR B 4P PWR CA-D 3 BASEU PA2 PIM1 PWR A 4P PWR CA-E 4 BASEU PB2 PIM1 PWR B 4P PWR CA-F 5 PIM0 (PWR) -48V IN CONN PIM0 -48V0 3P PWR CA-A -48V0 6 PIM0 (PWR) -48V IN...
Page 163
NDA-24234 CHAPTER 3 Page 133 Revision 3.0 INSTALLATION PROCEDURE Figure 010-20 Power Cable Connection for IMG2/3 (3-PIM System) (Multiple IMG Configuration) NAP-200-010 Sheet 38/71 Internal Cable Connections Connect the internal power cables for 3-PIM system of IMG2/3 as shown below. Note that the dotted lines in- dicate power cables for a dual-system. 00 01 PWR 00 01 PWR 0001 PWR 02 03 PWR 02 03 PWR 0203 PWR PZ-M371 (1) (3) (5) (7) (9) (2) (4) (6) (8) (10) (11) BASEU BASEU PIM 0 DUMMYDUMMY...
Page 164
CHAPTER 3 NDA-24234 Page 134 Revision 3.0 INSTALLATION PROCEDURE NAP-200-010 Sheet 39/71 Internal Cable Connections Table 010-13 Power Cable Connection for IMG2/3 (3-PIM System) (Multiple IMG Configuration) No.FROM TO CABLE NAME REMARKS UNIT/MODULECONNECTOR NAMEUNIT/ MODULECONNECTOR NAME 1 BASEU PA1 PIM0 PWR A 4P PWR CA-C 2 BASEU PB1 PIM0 PWR B 4P PWR CA-D 3 BASEU PA2 PIM1 PWR A 4P PWR CA-E 4 BASEU PB2 PIM1 PWR B 4P PWR CA-F 5 BASEU PA3 PIM2 PWR A 4P PWR CA-G 6 BASEU PB3 PIM2 PWR B 4P PWR CA-H 7 PIM0...
Page 165
NDA-24234 CHAPTER 3 Page 135 Revision 3.0 INSTALLATION PROCEDURE Figure 010-21 Power Cable Connection for IMG2/3 (4-PIM System) (Multiple IMG Configuration) NAP-200-010 Sheet 40/71 Internal Cable Connections Connect the internal power cables for 4-PIM system of IMG2/3 as shown below. Note that the dotted lines in- dicate power cables for a dual-system. PWR PWR PWR 00 01 PWR PWR PWR PWR 02 03 00 01 02 03 00 01 02 03 00 01 02 03 PWR PZ-M371 (1) (3) (5) (7) (9) (2) (4) (6) (8) (10) (12) (14) PIM...
Page 166
CHAPTER 3 NDA-24234 Page 136 Revision 3.0 INSTALLATION PROCEDURE NAP-200-010 Sheet 41/71 Internal Cable Connections Table 010-14 Power Cable Connection for IMG2/3 (4-PIM System) (Multiple IMG Configuration) No.FROM TO CABLE NAME REMARKS UNIT/MODULECONNECTOR NAMEUNIT/ MODULECONNECTOR NAME 1 BASEU PA1 PIM0 PWR A 4P PWR CA-C 2 BASEU PB1 PIM0 PWR B 4P PWR CA-D 3 BASEU PA2 PIM1 PWR A 4P PWR CA-E 4 BASEU PB2 PIM1 PWR B 4P PWR CA-F 5 BASEU PA3 PIM2 PWR A 4P PWR CA-G 6 BASEU PB3 PIM2 PWR B 4P PWR CA-H 7...
Page 167
NDA-24234 CHAPTER 3 Page 137 Revision 3.0 INSTALLATION PROCEDURE Run the bus cables, referring to Figure 010-23. Then, fasten the cables to the cabinet, referring to Figure 010-22. Figure 010-22 Bus Cable Connections for 1-PIM System (Single IMG Configuration) NAP-200-010 Sheet 42/71 Internal Cable Connections The drawing below illustrates how to run the bus cables for the 1-PIM system. For details on actual cable runnings, see Figure 010-23. Note:Normally, the cables are fastened onto the cabinet at...
Page 168
CHAPTER 3 NDA-24234 Page 138 Revision 3.0 INSTALLATION PROCEDURE Figure 010-23 Details on Bus Cable Connections (for 1-PIM System) (Single IMG Configuration) NAP-200-010 Sheet 43/71 Internal Cable Connections Connect the bus cables as shown below. Note that dotted lines indicate bus cables for a dual system. 00 01 02 03 04 05 06 BUS0A KEY ALM ALMA MUSIC0 DSP (1) (3) (5) (8) (7) (2) (4) (6) (BASEU)(PIM 0) TOPUFRONT VIEW REAR VIEW PC 19 PC 19 GT 16 GT 16 AB AB CN MUX1 MUX1 MUX2 MUX2 MUX3...
Page 169
NDA-24234 CHAPTER 3 Page 139 Revision 3.0 INSTALLATION PROCEDURE NAP-200-010 Sheet 44/71 Internal Cable Connections Table 010-15 Bus Cable Connections for 1-PIM System (Single IMG Configuration) No.FROM TO CABLE NAME REMARKS UNIT/ MODULECONNECTOR NAMEUNIT/ MODULECONNECTOR NAME 1 LPR (GT 16)CN-B (Front Connector)PIM0 BUS0A 50-40 GT BUS CA-A 2 LPR (GT 16)CN-A (Front Connector)LPR BUS0 EXGT BUS CA-A 3 LPR KEY TOPU KEY 10AL-(260) FLT CA 4 LPR ALM PIM0 ALMA 20AL-(60) FLT CA 5 LPR (GT 16)CN-A (Front...
Page 170
CHAPTER 3 NDA-24234 Page 140 Revision 3.0 INSTALLATION PROCEDURE Run the bus cables, referring to Figure 010-25. Then, fasten the cables to the cabinet, referring to Figure 010-24. Figure 010-24 Bus Cable Connections for 2-PIM System (Single IMG Configuration) NAP-200-010 Sheet 45/71 Internal Cable Connections Backplane Backplane The drawing below illustrates how to run the bus cables for the 2-PIM system. For details on actual cable runnings, see Figure 010-25. Note:Normally, the cables are fastened...