NEC Neax 2400 Imx Fusion Network System Manual
Here you can view all the pages of manual NEC Neax 2400 Imx Fusion Network System Manual. The NEC manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 151
CHAPTER 6 ND-70185 (E) Page 136 Revision 3.0 POST INSTALLATION TEST Repair Procedure When LED Indicates Abnormality All 24 B-channels sent from the TSW are looped back to the TSW at Interface on the card. At this time, the adjacent node detects AIS signals. (See in the figure below.) 2. Line Loopback All 24 B-channels sent from the line are looped back to the line at Line Interface on the card. (See in the figure below.) 3. Payload Loopback All 24 B-channels sent from the line are looped...
Page 152
ND-70185 (E) CHAPTER 6 Page 137 Revision 3.0 POST INSTALLATION TEST Repair Procedure When LED Indicates Abnormality 2.3 Test Procedure STEP 1: Set the MODE switch to 9 (Fusion Link Test) from 8 (standard setting) on the FCH card and initialize the circuit card by turning the MB switch ON→OFF Figure 6-5 How to Set the Fusion Link Test Mode STEP 2: Select an appropriate loopback point by setting the switch (SW01/SW13B). Figure 6-6 Loopback Point Designation STEP 3: When the LYR LED flashes at 60-INT,...
Page 153
CHAPTER 6 ND-70185 (E) Page 138 Revision 3.0 POST INSTALLATION TEST FCCS Network Connection Test Figure 6-7 Fusion Link-Test Results STEP 4: Return Mode to 8 (standard setting) when the test is complete. STEP 5: Initialize the FCH (PA-FCHA) card using the MB switch. Note:Be sure to initialize the FCH (PA-FCHA) card, after changing the setting of the Mode Switch. 3. FCCS Network Connection Test This section explains how to perform the following connection tests within the Fusion network: ...
Page 154
ND-70185 (E) CHAPTER 6 Page 139 Revision 3.0 POST INSTALLATION TEST FCCS Network Connection Test STEP 4: The call terminates on STN B. STEP 5: Confirm the speech condition is sufficient (no noise, not one-way speech, etc.). STEP 6: Replace the handset of STN A. STEP 7: Repeat the above steps for all Fusion links. 3.1.2 FCCS Call Termination Test STEP 1: Using the MBCT command, make busy all trunks in the origination route except the trunk to be tested at Node B. STEP 2: Lift the handset of STN B in Node...
Page 155
CHAPTER 6 ND-70185 (E) Page 140 Revision 3.0 POST INSTALLATION TEST FCCS Network Connection Test 3.2 ATTCON Connection Test (via FCCS) Perform the ATTCON connection test, using the following procedure. 3.2.1 ATTCON Call Origination Test STEP 1: Dial the operator access code (normally “0”), from STN A in Node A. STEP 2: Confirm that the ATT lamp flashes and ringer sounds at each ATTCON in Node B. STEP 3: Answer the call by pressing the ATND key. STEP 4: Confirm the speech condition is sufficient (no...
Page 156
ND-70185 (E) CHAPTER 6 Page 141 Revision 3.0 POST INSTALLATION TEST FCCS Network Connection Test 3.3 Line (LC, ELC, DLC Card) Connection Test (via FCCS) Perform the Line (LC, ELC, DLC Card) connection test, following the procedures listed below. 3.3.1 Line Origination Test: Confirmation of Physical/Telephone STN Number STEP 1: Connect the line circuit card to be tested to a telephone set in Node A (self-Node). STEP 2: Lift the handset of STN A and confirm DT (Dial Tone). STEP 3: Place a call to an ATTCON...
Page 157
CHAPTER 6 ND-70185 (E) Page 142 Revision 3.0 POST INSTALLATION TEST FCCS Network Connection Test 3.4 3-party Conference Trunk Function Test (via FCCS) Perform the 3-party conference trunk function test, following the procedures listed below. STEP 1: Using the MBTK Command, make busy all 3-party Conference Trunk (CFTs) except the trunk to be tested. STEP 2: Establish a station-to-station connection between STNs A and B in self node (Node A). STEP 3: STN A goes to Switch Hook Flash (SHF), and after...
Page 158
ND-70185 (E) CHAPTER 6 Page 143 Revision 3.0 POST INSTALLATION TEST Fusion and Non-Fusion Connection Tests 3.5.1 Primary Route Trunk Test STEP 1: Using the MBCT command, make busy all trunks in the primary route except the trunk to be tested. STEP 2: Lift the handset of STN A in self-node (Node A). STEP 3: Dial the Telephone Number of STN B which belongs to other node (STN B). STEP 4: Confirm the speech condition is sufficient (no noise, not one-way speech, etc.). STEP 5: Replace the handset of STN A....
Page 159
CHAPTER 6 ND-70185 (E) Page 144 Revision 3.0 POST INSTALLATION TEST Fusion and Non-Fusion Connection Tests 4.1 When Seizing a Trunk from a Station STEP 1: Using the MAT command, make busy all trunks in the route except the trunk to be tested. STEP 2: Station A in self-node (Node A) dials the Physical Station Number for Station B in Node C. STEP 3: The call terminates to Station B via FCCS and non-FCCS. STEP 4: Confirm the speech condition is sufficient (no noise, not one-way speech, etc.). STEP 5:...
Page 160
ND-70185 (E) CHAPTER 6 Page 145 Revision 3.0 POST INSTALLATION TEST SDT Card Loopback Test 5. SDT Card Loopback Test The patterns for loopback test, which can be set by the SDT card, are as follows: 1. Local Loopback Loopback tests are performed only on the SDT card at the self-node. 2. Remote Loopback Loopback tests are performed between different nodes. The result of this test can be confirmed not at the self-node, but at the distant node. Figure 6-14 Loopback Points of SDT Card Test Procedure STEP...