NDA-24219 CHAPTER 3 Page 27 Revision 2.0 NAP-200-001 Sheet 2/2 Unpacking Figure 001-1 Unpacking Main Equipment ACCESSORIES PIM
Page 42
CHAPTER 3 NDA-24219 Page 28 Revision 2.0 NAP-200-002 Sheet 1/2 Marking and Drilling 1. CONFIRMING EQUIPMENT LAYOUT Install the equipment in an area that provides adequate ventilation and is easily accessible to service personnel. 2. MARKING Locate and mark the wall mounting points as shown in Figure 002-1. Figure 002-1 Wall Mounting Points 290 mm (11.6 inch) 302 mm (11.9 inch) 30 mm (1.2 inch) 350 mm (13.8 inch) PBX BOTTOM POSITION ANCHOR (x4) 354 mm (13.9 inch) PIM PIM PIM 354 mm (13.9 inch) 354 mm...
Page 43
NDA-24219 CHAPTER 3 Page 29 Revision 2.0 NAP-200-002 Sheet 2/2 Marking and Drilling 3. DRILLING Install anchor bolts as shown in Figure 002-2. Figure 002-2 Installing Anchor Bolt (1) DRILL A HOLE IN THE CONCRETE WITH A DRILL SUITABLE FOR A PLUG BOLT A LITTLE DEEPER THAN THE PLUG BOLT LENGTH. (2) INSERT THE ANCHOR BOLT INTO THE HOLE. (3) PUSH ANCHOR BOLT UNTIL THE BOLT STAYS PERMANENTLY IN PLACE. (4) TURN BOLT COUNTERCLOCKWISE AND REMOVE.(1) (2) (3) (4)
Page 44
CHAPTER 3 NDA-24219 Pag e 3 0 Revision 2.0 NAP-200-003 Sheet 1/12 Installation of Main Equipment 1. WALL-MOUNTING INSTALLATION (1) When the system is two PIM configuration, connect PIMs with three bolts provided. Figure 003-1 Connection of PIMs
Page 46
CHAPTER 3 NDA-24219 Page 32 Revision 2.0 NAP-200-003 Sheet 3/12 Installation of Main Equipment (3) After hanging PIM onto the wall, tighten each M4 machine screw using a phillips screw driver. Figure 003-2 Screwing PIM to Wall M4 MACHINE SCREW-B (X4) PIM
Page 47
NDA-24219 CHAPTER 3 Pag e 33 Revision 2.0 NAP-200-003 Sheet 4/12 Installation of Main Equipment (4) Connect the TOP COVER to the upper PIM with four screws, and connect the BOTTOM COVER to the lower PIM with four screws. Figure 003-3 Connecting Covers TOP COVER BOTTOM COVER
Page 48
CHAPTER 3 NDA-24219 Pag e 3 4 Revision 2.0 NAP-200-003 Sheet 5/12 Installation of Main Equipment (5) Connect the AC CORD-A-U to the AC INPUT connector on the PZ-PW86/PZ-PW112, and its FG cord to the FG terminal on the chassis. After connection of AC CORD-A-U to the AC INPUT connector, let the cord out of the PIM through the cable hole provided with bottom of the PIM. Figure 003-4 Connecting AC CORD to PIM PZ-PW86/ PZ-PW112 AC CORD-A-U FG CORD AC INPUT FG TERMINAL H5 (PROVIDED) FG CORDCABLE HOLE FOR...