NEC Neax 1000 Ivs Very Small Platform System Manual

Here you can view all the pages of manual NEC Neax 1000 Ivs Very Small Platform System Manual. The NEC manuals for Communications System are available online for free. You can easily download all the documents as PDF.

Page 41

 NDA-24219 CHAPTER 3
Page 27
Revision 2.0
NAP-200-001
Sheet 2/2
Unpacking
Figure 001-1  Unpacking Main Equipment
ACCESSORIES
PIM 

Page 42

CHAPTER 3 NDA-24219  
Page 28
Revision 2.0
NAP-200-002
Sheet 1/2
Marking and Drilling
1. CONFIRMING EQUIPMENT LAYOUT
Install the equipment in an area that provides adequate ventilation and is easily accessible to service personnel.
2. MARKING
Locate and mark the wall mounting points as shown in Figure 002-1.
Figure 002-1  Wall Mounting Points
290 mm
(11.6 inch)
302 mm
(11.9 inch)
30 mm (1.2 inch)
350 mm
(13.8 inch)
PBX BOTTOM POSITION ANCHOR (x4)
354 mm
(13.9 inch) PIM
PIM
PIM
354 mm
(13.9 inch)
354 mm...

Page 43

 NDA-24219 CHAPTER 3
Page 29
Revision 2.0
NAP-200-002
Sheet 2/2
Marking and Drilling
3. DRILLING 
Install anchor bolts as shown in Figure 002-2.
Figure 002-2  Installing Anchor Bolt
(1) DRILL A HOLE IN THE CONCRETE WITH A 
DRILL SUITABLE FOR A PLUG BOLT A LITTLE 
DEEPER THAN THE PLUG BOLT LENGTH.
(2) INSERT THE ANCHOR BOLT INTO THE HOLE.
(3) PUSH ANCHOR BOLT UNTIL THE BOLT 
STAYS PERMANENTLY IN PLACE.
(4) TURN BOLT COUNTERCLOCKWISE AND 
REMOVE.(1) (2) (3) (4) 

Page 44

CHAPTER 3 NDA-24219  
Pag e 3 0
Revision 2.0
NAP-200-003
Sheet 1/12
Installation of Main Equipment
1. WALL-MOUNTING INSTALLATION 
(1) When the system is two PIM configuration, connect PIMs with three bolts provided. 
Figure 003-1  Connection of PIMs 

Page 45

 NDA-24219   CHAPTER 3
NAP-2 00-003 

Page 46

CHAPTER 3 NDA-24219  
Page 32
Revision 2.0
NAP-200-003
Sheet 3/12
Installation of Main Equipment
(3) After hanging PIM onto the wall, tighten each M4 machine screw using a phillips screw driver. 
Figure 003-2  Screwing PIM to Wall
M4 MACHINE SCREW-B (X4)
PIM 

Page 47

 NDA-24219 CHAPTER 3
Pag e 33
Revision 2.0
NAP-200-003
Sheet 4/12
Installation of Main Equipment
(4) Connect the TOP COVER to the upper PIM with four screws, and connect the BOTTOM COVER to the
lower PIM with four screws.
Figure 003-3  Connecting Covers
TOP COVER
BOTTOM COVER 

Page 48

CHAPTER 3 NDA-24219  
Pag e 3 4
Revision 2.0
NAP-200-003
Sheet 5/12
Installation of Main Equipment
(5) Connect the AC CORD-A-U to the AC INPUT connector on the PZ-PW86/PZ-PW112, and its FG cord
to the FG terminal on the chassis.
After connection of AC CORD-A-U to the AC INPUT connector, let the cord out of the PIM through the
cable hole provided with bottom of the PIM.
Figure 003-4  Connecting AC CORD to PIM
PZ-PW86/
PZ-PW112
AC CORD-A-U
FG CORD
AC INPUT FG TERMINAL
H5 (PROVIDED) FG CORDCABLE HOLE FOR...

Page 49

 NDA-24219   CHAPTER 3
NAP-2 00-003
B
C
A
B
C
FRONT
P IM 

Page 50

CHAPTER 3  NDA-24219    
NAP-200-003
R UB BER FOOT 