Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies Definity Release 8.2 Atm Installation Manual
Lucent Technologies Definity Release 8.2 Atm Installation Manual
Here you can view all the pages of manual Lucent Technologies Definity Release 8.2 Atm Installation Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 161
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Troubleshooting 6-27 Troubleshooting ATM-PNC 6 Screen 6-9. Screen output for display atm pnc 1 with end system identifiers Screen 6-10. Screen output for display atm pnc 2 with end system identifiers display atm pnc 1 ATM PNC Connection...
Page 162
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Troubleshooting 6-28 Troubleshooting ATM-PNC 6 ATM signaling links Figure 6-2 shows the sig naling links in an ATM-PNC c onfig uration. Figure 6-2. ATM signaling linksFigure Notes 1 . D EFIN I TY EC S sw i t c h PPN /EPN 2. Telep hones 3. ATM switc h 4. Constant bit rate switched virtual c onnec tion (CBR-SVC)5. PNC ATM control link (PACL) 6. Exp ansion archang el link (EAL) 7. ATM sig naling PPN...
Page 163
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Troubleshooting 6-29 Troubleshooting ATM-PNC 6 Signaling sequences. Use the information in Table 6-10 to help determine trouble with ATM sig naling . Ab b reviations used in this tab le c orresp ond to those in Figure 6-2 . ATM switch administration Is the ATM switch administered correctly? To verify that a sp ec ific Luc ent ATM switc h was ad ministered c orrec tly, refer to the ap p rop...
Page 164
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Troubleshooting 6-30 Troubleshooting ATM-PNC 6 TN2305/TN2306 circuit pack Did the TN2305/TN2306 come up correctly? 1. Review the LED c ond itions for the TN2305/TN2306 (refer to the maintenanc e b ook for LED ind ic ations): nDo the TN2305/TN2306 LEDs ind ic ate a normal operational state (any of the following ): — Ac tive in the PPN — Stand b y in the PPN — Arc hang el mod e in the EPN — Stand b...
Page 165
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Troubleshooting 6-31 Troubleshooting ATM-PNC 6 Screen 6-12. List configuration carrier 2a screen nMake sure the TN2305/TN2306 c irc uit p ac k is shown in the c orrec t slot (c hec k the Board Number field ). nField s should have values as ind ic ated b elow: 4. If the TN2305/TN2306 is inserted and shows a vintag e numb er, typ e test board UUCSS and p ress En t e r; Screen 6-13 displays....
Page 166
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Troubleshooting 6-32 Troubleshooting ATM-PNC 6 nTh e Result field should show PASS for eac h test numb er. If any of the tests fail, refer to the ATM-EI maintenanc e ob jec ts in DEFINITY ECS Maintenanc e for R8r. Possible causes 1. The TN2305/TN2306 c irc uit p ac k is in a slot d ifferent from the DEFINITY ad ministration. 2. The TN2305/TN2306 was not c omp letely inserted . ATM signaling...
Page 167
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Troubleshooting 6-33 Troubleshooting ATM-PNC 6 Physical layer Is there an optical signal between the TN2305/TN2306 and the ATM switch? 1. Id entify the OC-3/STM-1 p orts on the ATM switc h that have DEFINITY p ort networks attac hed . nBe aware that c ustomers may use other p orts on the ATM switc h for ap p lic ations unrelated to DEFINITY (LAN traffic or multimed ia ap p lic ations, for examp...
Page 168
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Troubleshooting 6-34 Troubleshooting ATM-PNC 6 nThe ATM switc h d oes not rec og nize that a port c irc uit p ac k is in the slot. You may need to re-ad minister the ATM switc h p ort b oard s. Refer to your ATM switc h’s q uic k referenc e g uid e for further information. Recommended Action. 1. Plug in, swap , rep air, or rep lac e the fib er as nec essary. 2. Verify that the port c irc uit p...
Page 169
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Troubleshooting 6-35 Troubleshooting ATM-PNC 6 Q.93B (network) layer Are connection requests being received by ATM switch call control? NOTE: If there is no c onnec tion b etween the TN2305/TN2306 c irc uit p ac k and the ATM switc h at the Q.93B p rotoc ol layer, then no rep ort d isp lays. 1. Chec k the p ort of interest. If it is not c onfig ured for UNI sig naling , then the p ort was ad...
Page 170
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Troubleshooting 6-36 Troubleshooting ATM-PNC 6 Screen 6-14. Error report Screen 6-15 shows the sc reen outp ut for the display errors command. Screen 6-15. Hardware error report—screen 9 In this examp le the errors that have ATM-NTWK for Name field and 1 for Aux Data field ind ic ate an error returned to the TN2305/TN2306 c irc uit p ac k from the ATM network. In this c ase, the Err Type...