Home > Lucent Technologies > Communications System > Lucent Technologies Definity Release 8.2 Atm Installation Manual

Lucent Technologies Definity Release 8.2 Atm Installation Manual

Here you can view all the pages of manual Lucent Technologies Definity Release 8.2 Atm Installation Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.

Page 171

DEFINITY ECS Release 8.2 ATM Installation,
Upgrades, and Administration  555-233-124  Issue 1
April 2000
Troubleshooting 
6-37 Troubleshooting ATM-PNC 
6
ATM call control
Are ATM signaling connections being setup to ATM switch Call Control?
The UBR virtual c irc uits b etween the ATM switc h PPN p ort and  ATM switc h p ort 
and  b etween the 
EPN p ort and  ATM switc h p ort are ATM sig naling  c hannels 
b etween the p ort network and  the ATM switc h. They are used  to req uest 
c onnec tion setup s...

Page 172

DEFINITY ECS Release 8.2 ATM Installation,
Upgrades, and Administration  555-233-124  Issue 1
April 2000
Troubleshooting 
6-38 Troubleshooting ATM-PNC 
6
Are talk paths being established between port networks?
Diagnostics. 
nCan you talk b oth ways on a set on one p ort network d ialed  from another 
port network and vice versa?
— The CBR (Constant Bit Rate) virtual c irc uits (VCs) b etween ATM 
switc h PPN p ort and  ATM switc h EPN p ort are used for talk p aths 
b etween p ort networks (PPN to EPN,...

Page 173

DEFINITY ECS Release 8.2 ATM Installation,
Upgrades, and Administration  555-233-124  Issue 1
April 2000
Troubleshooting 
6-39 Troubleshooting ATM-PNC 
6
Incorrectly typed or omitted EPN route or 
end system identifier (ATM switch)
Symptoms
Talk p aths are one-way, from the PPN to the EPN: you c an hear tones from the 
PPN end  station to the EPN end  station b ut not vic e versa. Bec ause the sig naling  
c hannels are b id irec tional virtual c irc uits (VCs) estab lished from the PPN to the 
EPN,...

Page 174

DEFINITY ECS Release 8.2 ATM Installation,
Upgrades, and Administration  555-233-124  Issue 1
April 2000
Troubleshooting 
6-40 Troubleshooting ATM-PNC 
6
Swapped routes, end system identifiers, or fiber
between two EPNs
Symptoms
nAll TN2305/TN2306 c irc uit pac ks are c ompletely inserted .
nThe PPN c old  starts b oth inc orrec tly c onnec ted  EPNs as usual.
nBo t h  EPN s  lo g  m a n y WRONG BOARD INSERTED
 errors (list configuration 
all
 or display circuit-packs 
carrier), p rovid ing  the EPNs ac...

Page 175

DEFINITY ECS Release 8.2 ATM Installation,
Upgrades, and Administration  555-233-124  Issue 1
April 2000
Troubleshooting 
6-41 Troubleshooting ATM-PNC 
6
DEFINITY ECS ATM-PNC troubleshooting
commands 
Wid e-area networks (WAN), esp ec ially those c onstruc ted  as an internet using  
p ub lic  network fac ilities, may take inter-PN c onnec tivity to the ed ge of 
ac c ep tab le p erformanc e. The switc h may exp erienc e d elays, b loc kag es, or 
c onnec tion losses b ec ause of c irc umstanc es b eyond...

Page 176

DEFINITY ECS Release 8.2 ATM Installation,
Upgrades, and Administration  555-233-124  Issue 1
April 2000
Troubleshooting 
6-42 Troubleshooting ATM-PNC 
6
Screen 6-16. PNC measurements pairs screen (change/display atm pnc-pairs)
Field descriptions
list measurements atm pnc-latency
This command reads and displays the collected information regarding ATM cell 
latenc y and  c onnec tion times. The c ommand -line syntax is: 
nlist measurements atm pnc-latency
 [last-hour, today-peak, 
yesterday-peak
] [print...

Page 177

DEFINITY ECS Release 8.2 ATM Installation,
Upgrades, and Administration  555-233-124  Issue 1
April 2000
Troubleshooting 
6-43 Troubleshooting ATM-PNC 
6
If an ad ministered pnc -p air is c hang ed , the next time measurements are 
g athered , the 
today-peak entry for the old  p nc -p air is rep lac ed  with an entry for 
the new pair, and  all c ounters are set to 0.
Screen 6-17
 shows the output for this c ommand .
Screen 6-17. ATM-PNC latency measurements
Field descriptions
Conserving ATM bandwidth...

Page 178

DEFINITY ECS Release 8.2 ATM Installation,
Upgrades, and Administration  555-233-124  Issue 1
April 2000
Troubleshooting 
6-44 Troubleshooting ATM-PNC 
6
ATM-PNC c onfig uration in whic h Inverse Multip lexing for ATM (IMA) is used  
g oing  into and  c oming  out of the network c loud . 
Figure 6-4. Bandwidth-constricted ATM network configuration
In this c onfig uration c onnec tions from the DEFINITY ECS switc h and the ATM 
b ac kb one switc h and  to the ATM ac c ess c onc entrator are OC-3/STM-1...

Page 179

DEFINITY ECS Release 8.2 ATM Installation,
Upgrades, and Administration  555-233-124  Issue 1
April 2000
Troubleshooting 
6-45 Troubleshooting ATM-PNC 
6
network occurs. In such cases, SVC setups requested by DEFINITY can be 
d enied  b y the ATM network and  assoc iated  c omp onents, and  c alls are not 
completed.
In this sec tion, a failed  SVC setup  means that the ATM network has ac tively 
rejec ted  the req uest. A d elayed  SVC setup  means that the SVC setup  exc eed ed  
a time threshold , sp...

Page 180

DEFINITY ECS Release 8.2 ATM Installation,
Upgrades, and Administration  555-233-124  Issue 1
April 2000
Troubleshooting 
6-46 Troubleshooting ATM-PNC 
6
SVC latency commands
Two rep orts are availab le to help  monitor the ATM network:
1. The ATM PNC Latenc y Histog ram rep ort (ac c essed  throug h the list 
measurements atm latency-histogram
 command) shows:
nSetup  c ount
nAd d Party c ount
ntotal
naverag e latenc ies
nhistog ram (21 d ifferent time b ins rang ing  from 0-9 msec . to + 10 
sec .)
Syn...
Start reading Lucent Technologies Definity Release 8.2 Atm Installation Manual

Related Manuals for Lucent Technologies Definity Release 8.2 Atm Installation Manual

All Lucent Technologies manuals