Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies Definity Release 8.2 Atm Installation Manual
Lucent Technologies Definity Release 8.2 Atm Installation Manual
Here you can view all the pages of manual Lucent Technologies Definity Release 8.2 Atm Installation Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 171
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Troubleshooting 6-37 Troubleshooting ATM-PNC 6 ATM call control Are ATM signaling connections being setup to ATM switch Call Control? The UBR virtual c irc uits b etween the ATM switc h PPN p ort and ATM switc h p ort and b etween the EPN p ort and ATM switc h p ort are ATM sig naling c hannels b etween the p ort network and the ATM switc h. They are used to req uest c onnec tion setup s...
Page 172
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Troubleshooting 6-38 Troubleshooting ATM-PNC 6 Are talk paths being established between port networks? Diagnostics. nCan you talk b oth ways on a set on one p ort network d ialed from another port network and vice versa? — The CBR (Constant Bit Rate) virtual c irc uits (VCs) b etween ATM switc h PPN p ort and ATM switc h EPN p ort are used for talk p aths b etween p ort networks (PPN to EPN,...
Page 173
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Troubleshooting 6-39 Troubleshooting ATM-PNC 6 Incorrectly typed or omitted EPN route or end system identifier (ATM switch) Symptoms Talk p aths are one-way, from the PPN to the EPN: you c an hear tones from the PPN end station to the EPN end station b ut not vic e versa. Bec ause the sig naling c hannels are b id irec tional virtual c irc uits (VCs) estab lished from the PPN to the EPN,...
Page 174
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Troubleshooting 6-40 Troubleshooting ATM-PNC 6 Swapped routes, end system identifiers, or fiber between two EPNs Symptoms nAll TN2305/TN2306 c irc uit pac ks are c ompletely inserted . nThe PPN c old starts b oth inc orrec tly c onnec ted EPNs as usual. nBo t h EPN s lo g m a n y WRONG BOARD INSERTED errors (list configuration all or display circuit-packs carrier), p rovid ing the EPNs ac...
Page 175
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Troubleshooting 6-41 Troubleshooting ATM-PNC 6 DEFINITY ECS ATM-PNC troubleshooting commands Wid e-area networks (WAN), esp ec ially those c onstruc ted as an internet using p ub lic network fac ilities, may take inter-PN c onnec tivity to the ed ge of ac c ep tab le p erformanc e. The switc h may exp erienc e d elays, b loc kag es, or c onnec tion losses b ec ause of c irc umstanc es b eyond...
Page 176
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Troubleshooting 6-42 Troubleshooting ATM-PNC 6 Screen 6-16. PNC measurements pairs screen (change/display atm pnc-pairs) Field descriptions list measurements atm pnc-latency This command reads and displays the collected information regarding ATM cell latenc y and c onnec tion times. The c ommand -line syntax is: nlist measurements atm pnc-latency [last-hour, today-peak, yesterday-peak ] [print...
Page 177
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Troubleshooting 6-43 Troubleshooting ATM-PNC 6 If an ad ministered pnc -p air is c hang ed , the next time measurements are g athered , the today-peak entry for the old p nc -p air is rep lac ed with an entry for the new pair, and all c ounters are set to 0. Screen 6-17 shows the output for this c ommand . Screen 6-17. ATM-PNC latency measurements Field descriptions Conserving ATM bandwidth...
Page 178
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Troubleshooting 6-44 Troubleshooting ATM-PNC 6 ATM-PNC c onfig uration in whic h Inverse Multip lexing for ATM (IMA) is used g oing into and c oming out of the network c loud . Figure 6-4. Bandwidth-constricted ATM network configuration In this c onfig uration c onnec tions from the DEFINITY ECS switc h and the ATM b ac kb one switc h and to the ATM ac c ess c onc entrator are OC-3/STM-1...
Page 179
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Troubleshooting 6-45 Troubleshooting ATM-PNC 6 network occurs. In such cases, SVC setups requested by DEFINITY can be d enied b y the ATM network and assoc iated c omp onents, and c alls are not completed. In this sec tion, a failed SVC setup means that the ATM network has ac tively rejec ted the req uest. A d elayed SVC setup means that the SVC setup exc eed ed a time threshold , sp...
Page 180
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Troubleshooting 6-46 Troubleshooting ATM-PNC 6 SVC latency commands Two rep orts are availab le to help monitor the ATM network: 1. The ATM PNC Latenc y Histog ram rep ort (ac c essed throug h the list measurements atm latency-histogram command) shows: nSetup c ount nAd d Party c ount ntotal naverag e latenc ies nhistog ram (21 d ifferent time b ins rang ing from 0-9 msec . to + 10 sec .) Syn...