Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual
Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Upgrades And Additions Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 111
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Upgrading R5si/R6si to R8r EPN and Adding Memory 3-39 Release 5/6si to Release 8r 3 Figure 3-14. Fiber Optic Connections Through Center Stage Switch Figure Notes 1. Cabinet 1 PPN with 1 Switc h Nod e 2. Cabinet Stac k 2-16 EPN 3. Metallic Cab le (H600-278)4. Ad d Links to EPNs in Alternating Ord er (20, 3, 19, 4, 18, 5, and so forth) 5. To ad d itional EPNs
Page 112
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Upgrading R5si/R6si to R8r EPN and Adding Memory 3-40 Release 5/6si to Release 8r 3 For 1 to 15 High Reliability EPNs. 1. Behind the PPN c ab inet. See Figure 3-15 : a. Install a lig htwave transc eiver on c ab le c onnec tor at slot 1E02. b . Install a lig htwave transc eiver on c ab le c onnec tor at slot 1C02. c . Connec t 1 end of the metallic interc arrier c ab le to the lig...
Page 113
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Upgrading R5si/R6si to R8r EPN and Adding Memory 3-41 Release 5/6si to Release 8r 3 ] Figure 3-15. Fiber Optic Connections Through Center Stage Switch Figure Notes 1. Cabinet 1 PPN with 1 Switc h Nod e 2. Cabinet Stac k 2-16 EPN 3. H600-278 Metallic Cable4. Ad d Links to EPNs in Alternating Order (3, 19, 4, 18, 5, 17, and so forth) 5. To Add itional EPNs
Page 114
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Upgrading R5si/R6si to R8r EPN and Adding Memory 3-42 Release 5/6si to Release 8r 3 For 1 to 15 Critical Reliability EPNs. 1. Behind the PPN c ab inet. See Figure 3-16 : a. Install a lig htwave transc eiver on c ab le c onnec tor at slot 1E01. b . Install a lig htwave transc eiver on c ab le c onnec tor at slot 1E02. c . Connec t the metallic intrac arrier c ab le to the lig htwave...
Page 115
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Upgrading R5si/R6si to R8r EPN and Adding Memory 3-43 Release 5/6si to Release 8r 3 4. Behind switc h nod e c arrier D of PPN c ab inet 1: a. For eac h EPN, install 1 lig htwave transc eiver on a c ab le c onnec tor with the following ord er of slots: 1E20, 1E03, 1E19, 1E04, 1E18, 1E05, and so forth. b . Connec t 1 end of eac h fiber op tic c able to eac h lig htwave transc...
Page 116
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Upgrading R5si/R6si to R8r EPN and Adding Memory 3-44 Release 5/6si to Release 8r 3 Figure 3-16. Fiber Optic Connections Through Center Stage Switch Figure Notes 1. Cabinet 1 with 1 Dup lex Switc h Node 2. Cabinet Stac k 2-16 EPN 3. H600-278 Metallic Cable4. Ad d Links to EPNs in Alternating Ord er (20, 3, 19, 4, 18, 5, and so forth) 5. Ad d Links to EPNs in Alternating Ord er...
Page 117
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Upgrading R5si/R6si to R8r EPN and Adding Memory 3-45 Release 5/6si to Release 8r 3 DS1 CONV-Remoted Cabinets The d istanc e b etween the DS1 fac ilities and assoc iated eq uip ment room hard ware and c ab ling is a maximum of ap p roximately 200 c irc uit miles (322 km) for analog voic e and 500 c irc uit miles (805 km) for d ig ital (no analog voic e stations). NOTE: These...
Page 118
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Upgrading R5si/R6si to R8r EPN and Adding Memory 3-46 Release 5/6si to Release 8r 3 Table 3-5 lists the c ab le numb ers and leng ths for the p ossib le c onnec tions. DS1 CONV Cabling to the Public Network. Use the running list that ac c omp anies the up g rad e eq uip ment to d etermine whic h c ab le c onnec ts where. The following parag rap hs only p rovid e c onc ep tual...
Page 119
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Upgrading R5si/R6si to R8r EPN and Adding Memory 3-47 Release 5/6si to Release 8r 3 Verify Usable Circuit Pack Vintages 1. Verify every circuit pack reused in the upgrade conforms to the usable vintag e requirements for a Release 8r system (see Reference Guide for Circ uit Pac k Vintag es and Chang e Notic es ). Install System Access Ports 1. Before c onnec ting various end p oints...
Page 120
DEFINITY Enterprise Communications Server Release 8.2 Upgrades and Additions for R8r 555-233-115 Issue 1 April 2000 Upgrading R5si/R6si to R8r EPN and Adding Memory 3-48 Release 5/6si to Release 8r 3 Reboot the System 1. Connec t the manag ement terminal to the TERMINAL c onnec tor on the rear o f PPN c ontrol c arrier “ A,” or install the G3-MA ac c ord ing to DEFINITY Communic ations System Generic 3 Manag ement Ap p lic ations — Operations , 585-229-202. 2. Insert the new Release 8r...