Have a look at the manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Administration For Network Connectivity Instructions Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 413 Lucent Technologies manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
Configuration 5B:R8csi R8r (2 C-LANs) R8si 171 Administration for Network Connectivity 555-233-504— Issue 1 — April 2000 CID: 77730 3 C-LAN Administration Configuration 5B:R8csi R8r (2 C-LANs) R8si In this configuration, a DEFINITY ECS R8r acts as a gateway between two other nodes — one connected via ppp to an R8csi and the other via ethernet to another R8si. This configuration is the same as configuration 5A except that Switch 1 has two C-LAN circuit packs instead of one. One C-LAN handles the ppp connection and the other handles the ethernet connection. Task Summary The following tasks need to be completed for Switch 1, Switch 2, and Switch 3: 1 Review checklist 2 Switch 1 administration a Assign node names b Assign link to (via a data module) to node-2 c Assign link to (via a data module) to the LAN d Assign link (via a data module) from C-LAN(a) to C-LAN(b) e Assign link (via a data module) from C-LAN(b) to C-LAN(a) f Assign processor channels g Assign IP Route: C-LAN(a) to node-3 h Assign IP Route: C-LAN(b) to node-2 3 Switch 2 administration a Enable bus bridge connectivity b Assign node names c Assign link (via a data module) to node-1a-ppp d Assign processor channels e Assign IP Route to node-3 DEFINITY ECS R8r ppp Switch 1 DEFINITY ECS Switch 3 DEFINITY ECS Switch 2 R8si Hub Ethernet R8csi C-LAN(b)C-LAN ppp node-1b-ethnode-3 node-1a-pppnode-2 node-1a node-1b DS1 C-LAN DS1 C-LAN(a)
Configuration 5B:R8csi R8r (2 C-LANs) R8si 3 C-LAN Administration Administration for Network Connectivity CID: 77730 555-233-504 — Issue 1 — April 2000 172 4 Switch 3 administration a Assign node names b Assign link (via a data module) to the LAN c Assign processor channels 5 Enable links and processor channels Prerequisite Administration There are some system administration tasks that need to be completed before you can proceed with the connectivity administration described in this section. Review the checklist of prerequisite administration tasks in the Checklist for Prerequisite Administration (page 54), before proceeding with the connectivity administration in this section.
Configuration 5B:R8csi R8r (2 C-LANs) R8si 173 Administration for Network Connectivity 555-233-504— Issue 1 — April 2000 CID: 77730 3 C-LAN Administration SWITCH 2 SWITCH 1 SWITCH 3 Configuration 5B DEFINITY ECS R7csi DEFINITY ECS R7r DEFINITY ECS R7si Processor channelsProcessor channelsProcessor channelsInterface channelsInterface channelsInterface channelsInterface channels 1 2 21 23 1281 500 x(any) 6004 645001 2 31 32 256 1 5000 645001 5000 5003 645001 5000 5003 64500 1 12 13 384 Link 1 Link 1 Link 12 Link 21Link 2Link 1 x x1 2(any) (any) Bus bridge hardware connections Processor UN331B C-LAN(a) TN799C-LAN(b) TN799 PktInt TN1655DS1 TN767/ TN464 DS1 TN767/ TN464 Processor bus TDM bus Packet bus ppp10BaseT ethernet Processor TN790B Processor bus TDM bus TDM bus Packet bus Packet bus NetPkt TN794 DS1 TN767/ TN464 DS1 TN767/ TN464Processor TN798BVoice data Voice data ppp dataNetwork control UN332B 56 4321 cydfec5b EWS 051799 node-2 Ext 3020 loc 1a0413 192.168.10.12node-1a-ppp Ext 2010 loc 1c0709 192.168.10.11node-1a Ext 2013 loc 1c0713 192.168.10.13node-1b Ext 2378 loc 1c0815 192.168.10.130node-1b-eth Ext 2377 loc 1c0817 192.168.10.128node-3 Ext 3901 loc 1a0517 192.168.10.129 132465 C-LAN TN799 C-LAN TN799 software-defined connections
Configuration 5B:R8csi R8r (2 C-LANs) R8si 3 C-LAN Administration Administration for Network Connectivity CID: 77730 555-233-504 — Issue 1 — April 2000 174 Switch 1 Task — Assign Node Names This task assigns node names and IP addresses to each node in the network. This screen is administered on Switch 1. A Node Names screen must be administered on each switch in the network. Note:Enter node names for Intuity AUDIX and MSA adjuncts on page 1. Enter node names for switches, routers, and CMS starting on page 2. Begin Steps > Open Node Names form — enter ch node-n > Go to page 2 > Enter values. > Submit the screen1 End change node-names Page 2 of 6 NODE NAMES Name IP Address Name IP Address default _________ 0__.0__.0__.0__ _______________ ___.___.___.___ node-1a-ppp 192.168.10_.11_ _______________ ___.___.___.___ node-1a ______ 192.168.10_.13________________ ___.___.___.___ node-1b ______ 192.168.10_.130_______________ ___.___.___.___ node-1b-eth __ 192.168.10_.128 _______________ ___.___.___.___ node-2____ 192.168.10_.12_ _______________ ___.___.___.___ node-3____ 192.168.10_.129 _______________ ___.___.___.___ Field Conditions/Comments Name Enter unique node names for the following 6 nodes: •C-LAN(a) PPP port on Switch 1 for the connection to Switch 2 •C-LAN(a) PPP port on Switch 1 for the connection to C-LAN(b) •C-LAN(b) PPP port on Switch 1 for the connection to C-LAN(a) •C-LAN(b) Ethernet port on Switch 1 •C-LAN PPP port on Switch 2. •C-LAN Ethernet port on Switch 3 IP Address The unique IP addresses of the nodes named in the previous field.
Configuration 5B:R8csi R8r (2 C-LANs) R8si 175 Administration for Network Connectivity 555-233-504— Issue 1 — April 2000 CID: 77730 3 C-LAN Administration Switch 1 Task — Assign Link via ppp Data Module to Switch 2 This task administers a ppp data module on Switch 1 for the ppp connection to Switch 2. The data module associates a link number with a port address, extension number, and node name for the C-LAN port used for this connection. Begin Steps > Open Data Module form — enter ad da 2010 > Enter values add data-module 2010 Page 1 of x DATA MODULE Data Extension: 2010 Name: _ppp on link 1 to node 2___ BCC: 2 Type: ppp COS: 1 Port: 01c0709 COR: 1 Link: 1_ TN: 1 Enable Link? n Node Name: node-1a-ppp _ Subnet Mask: 255.255.255.0 Establish Connection: y DESTINATION Digits: 8993020 _________ Node Name: node-2__________ CHAP? n Field Conditions/Comments Type: This indicates the data-module type for this link. Port: In this example, the C-LAN(a) circuit pack is in slot 01c07; the ppp connection is through port 09. Link: The link number must be in the range 1 – 33 (for R8r), not previously assigned on this switch. Enable Link? If you need to add an IP route that uses this node as a gateway, this field must be set to y before adding the IP route. Otherwise leave this field set to n until the link administration is complete; that is, until after all data modules and the processor channels are assigned, then set to y. Name: Information-only; appears in list generated by the “list data module” command. BCC: Bearer Capability Class. This is a display-only field. 1 of 2
Configuration 5B:R8csi R8r (2 C-LANs) R8si 3 C-LAN Administration Administration for Network Connectivity CID: 77730 555-233-504 — Issue 1 — April 2000 176 > Submit the screen End COS The values for these fields will be specified by the system administrator. COR: TN: Node Name: The node name for the interface defined by this data module. This must be a name entered on the Node Names screen. Establish Connection?y means that this switch will be responsible for the call setup. Enter n when administering the data module for Switch 2. Destination Digits:Trunk access code (899) plus extension of data module on node-2 (3020). Destination Node Name:Name of the node at the far end of this connection. Must be a name entered on the Node Names screen CHAP? This field enables/disables the Challenge Handshake Authentication Protocol security mechanism on this link. If you enter y, the system will prompt for a CHAP secret (password). Field Conditions/Comments 2 of 2
Configuration 5B:R8csi R8r (2 C-LANs) R8si 177 Administration for Network Connectivity 555-233-504— Issue 1 — April 2000 CID: 77730 3 C-LAN Administration Switch 1 Task — Assign IP Interfaces The IP interface for each C-LAN board on the switch must be defined on the IP Interfaces form. Each DEFINITY switch in an IP network has one IP Interfaces form. Begin Steps > Open IP Interfaces form — enter ch ip-i > Enter values change ip-interfaces Page 1 of 2 IP Interfaces Inter-region IP connectivity allowed? n Enable Net Eth Pt Type Slot Code Sfx Node Name Subnet Mask Gateway Addr Rgn y C-LAN 01c08 TN799 B node-1b-eth 255.255.255.0 .._. 1 n 255.255.255.0 n 255.255.255.0 n 255.255.255.0 Field Conditions/Comments Inter-region IP connectivity allowed?Enter y to allow IP endpoints (phones and trunks) to use MedPro resources administered in regions that are different from the endpoints’ regions. Enable Eth Pt The Ethernet port must be enabled (y) before it can be used. The port must be disabled (n) before changes can be made to its attributes on this screen. Type Enter c-lan or medpro. Slot Enter the slot location for the circuit pack. Code Display only. This field is automatically populated with TN799 for C-LAN or TN802 for MedPro. Sfx Display only. This field is automatically populated with B for the TN802 and TN799. Node name Enter the unique node name for the IP interface. The node name here must already be administered on the Node Names screen 1 of 2
Configuration 5B:R8csi R8r (2 C-LANs) R8si 3 C-LAN Administration Administration for Network Connectivity CID: 77730 555-233-504 — Issue 1 — April 2000 178 Subnet Mask Enter the subnet mask associated with the IP address for this IP interface. (The IP address is associated with the node name on the Node Names screen). In this example, leave the default subnet mask, 255.255.255.0, which indicates no subnetting for a Class C IP address. See the discussion of subnetting , Subnetting (page 16), in Chapter 1 and Configuration 1: R8r R8si (page 60) in this chapter for details about subnet masks. Gateway Addr Leave blank for this configuration. The only connection to this IP interface is node-3 on Switch 3, which is on the same subnetwork as this IP interface, so no gateway is needed. In general, for connectivity to other (sub)networks, enter the address of a network node that will serve as the default gateway to the other (sub)networks. Net Rgn Enter the region number for this IP interface. Field Conditions/Comments 2 of 2
Configuration 5B:R8csi R8r (2 C-LANs) R8si 179 Administration for Network Connectivity 555-233-504— Issue 1 — April 2000 CID: 77730 3 C-LAN Administration Switch 1 Task — Assign Link via ethernet Data Module to the LAN This task administers an ethernet data module on Switch 1 for the ethernet connection. The data module associates a link number with a port address, extension number, and node name for the C-LAN port used for this connection. Begin Steps > Open Data Module form — enter a da n > Enter values > Submit the screen End add data next Page 1 of X DATA MODULE Data Extension: 2377 Name: ethernet on link 2 BCC: 2 Type: ethernet Port: 01c0817_ Link: 2 Network uses 1’s for broadcast addresses? y Field Conditions/Comments Type: This indicates the data-module type for this connection. Port: Ethernet connections must be assigned to port 17 on the C-LAN(b) circuit pack. Link:The link number must be in the range 1 – 33 (for R8r), not previously assigned on this switch. Name: Information-only; appears in list generated by the “list data module” command. Network uses 1’s for broadcast addresses?Leave the default (y) if the private network contains only DEFINITY switches and adjuncts. Set to n only if the network includes non-DEFINITY switches that use the 0’s method of forming broadcast addresses. See Appendix A, “Data Module - type ethernet” for more information about this field.
Configuration 5B:R8csi R8r (2 C-LANs) R8si 3 C-LAN Administration Administration for Network Connectivity CID: 77730 555-233-504 — Issue 1 — April 2000 180 Switch 1 Task — Assign Link via ppp Data Module to C-LAN(a) This task administers a ppp data module on Switch 1 for the ppp connection from the C-LAN(b) circuit pack to the C-LAN(a) circuit pack. Begin Steps > Open Data Module form — enter ad da 2378 > Enter values add data-module 2378 Page 1 of x DATA MODULE Data Extension: 2378 Name: _ppp on link 21 to clan(a)_ BCC: 2 Type: ppp COS: 1 Port: 01c0815 COR: 1 Link: 21TN: 1 Enable Link? n Node Name: node-1b_____ Subnet Mask: 255.255.255.0 Establish Connection: n DESTINATION Digits: ______ Node Name: node-1a______ CHAP? n Field Conditions/Comments Type: This indicates the data-module type for this link. Port: In this example, the C-LAN(b) circuit pack is in slot 01c08; the ppp connection is through port 15. Link: The link number must be in the range 1 – 33 (for R8r), not previously assigned on this switch Enable Link? If you need to add an IP route that uses this node as a gateway, this field must be set to y before adding the IP route. Otherwise leave this field set to n until the link administration is complete; that is, until after all data modules and the processor channels are assigned, then set to y. Name: Information-only; appears in list generated by the “list data module” command. BCC: Bearer Capability Class. This is a display-only field. 1 of 2