Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Administration For Network Connectivity Instructions Manual
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Administration For Network Connectivity Instructions Manual
Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Administration For Network Connectivity Instructions Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 161
Configuration 4: R8csi R8si Gateway R8csi 141 Administration for Network Connectivity 555-233-504— Issue 1 — April 2000 CID: 77730 3 C-LAN Administration Switch 3 Task — Assign Link via ppp Data Module to Switch 1 This task administers a ppp data module on Switch 3 for the ppp connection to Switch 1. The data module associates a link number with a port address, extension number, and node name for the C-LAN port used for this connection. Begin Steps > Open Data Module form — enter ad da n [This...
Page 162
Configuration 4: R8csi R8si Gateway R8csi 3 C-LAN Administration Administration for Network Connectivity CID: 77730 555-233-504 — Issue 1 — April 2000 142 > Submit the screen End BCC: Bearer Capability Class. This is a display-only field. COS The values for these fields will be specified by the system administrator. COR: TN: Node Name: The node name for the interface defined by this data module. This must be a name entered on the Node Names screen. Subnet Mask: Establish Connection?n means that...
Page 163
Configuration 4: R8csi R8si Gateway R8csi 143 Administration for Network Connectivity 555-233-504— Issue 1 — April 2000 CID: 77730 3 C-LAN Administration Switch 3 Task — Assign Processor Channels This task associates data links (hardware) with processor channels (software) on Switch 3. Begin Steps > Open the Processor Channel Assignment form — enter ch com p. > Enter values change communications-interface processor-channels Page...
Page 164
Configuration 4: R8csi R8si Gateway R8csi 3 C-LAN Administration Administration for Network Connectivity CID: 77730 555-233-504 — Issue 1 — April 2000 144 > Submit the screen End Session - Local The Local and Remote Session numbers can be any value between 1 and 256 (si model) or 384 (r model), but they must be consistent between endpoints. For each connection, the Local Session number on this switch must equal the Remote Session number on the remote switch and vice versa. It is allowed, and...
Page 165
Configuration 4: R8csi R8si Gateway R8csi 145 Administration for Network Connectivity 555-233-504— Issue 1 — April 2000 CID: 77730 3 C-LAN Administration Enable links and processor channels You must enable links and processor channels before the connections can be used. To enable a link, open its data module screen (ch da [ext]) and set the Enable Link? field to y. [note: to view a list of assigned data modules and their extensions, enter the “list data-module” command (l da)] To enable the...
Page 166
Configuration 5A: R8csi R8r (one C-LAN) R8si 3 C-LAN Administration Administration for Network Connectivity CID: 77730 555-233-504 — Issue 1 — April 2000 146 Configuration 5A: R8csi R8r (one C-LAN) R8si In this configuration, a DEFINITY ECS R8r acts as a gateway between two other nodes — one connected via ppp to an R8csi and the other via ethernet to another R8si. Task Summary The following tasks need to be completed for Switch 1, Switch 2, and Switch 3: 1 Review checklist 2 Switch 1...
Page 167
Configuration 5A: R8csi R8r (one C-LAN) R8si 147 Administration for Network Connectivity 555-233-504— Issue 1 — April 2000 CID: 77730 3 C-LAN Administration Prerequisite Administration There are some system administration tasks that need to be completed before you can proceed with the connectivity administration described in this section. Review the checklist of prerequisite administration tasks in the Checklist for Prerequisite Administration (page 54), before proceeding with the connectivity...
Page 168
Configuration 5A: R8csi R8r (one C-LAN) R8si 3 C-LAN Administration Administration for Network Connectivity CID: 77730 555-233-504 — Issue 1 — April 2000 148 Switch 1 Task — Assign Node Names This task assigns node names and IP addresses to each node in the network. This screen is administered on Switch 1. A Node Names screen must be administered on each switch in the network. The node names and IP addresses in any network should be assigned in a logical and consistent manner from the point of...
Page 169
Configuration 5A: R8csi R8r (one C-LAN) R8si 149 Administration for Network Connectivity 555-233-504— Issue 1 — April 2000 CID: 77730 3 C-LAN Administration Switch 1 Task — Assign Link via ppp Data Module to Switch 2 This task administers a ppp data module on Switch 1 for the ppp connection to Switch 2. The data module associates a link number with a port address, extension number, and node name for the C-LAN port used for this connection. Begin Steps > Open Data Module form — enter ad da 2376 >...
Page 170
Configuration 5A: R8csi R8r (one C-LAN) R8si 3 C-LAN Administration Administration for Network Connectivity CID: 77730 555-233-504 — Issue 1 — April 2000 150 > Submit the screen End COS The values for these fields will be specified by the system administrator. COR: TN: Node Name: The node name for the interface defined by this data module. This must be a name entered on the Node Names screen. Subnet Mask: Establish Connection?y means that this switch will be responsible for call setup for this...