D-Link Dsh8 Manual
Here you can view all the pages of manual D-Link Dsh8 Manual. The D-Link manuals for Switch are available online for free. You can easily download all the documents as PDF.
Page 21
Chapter 2: Installation GE-DSH-73/DSH-82 and DSH-82-PoE User Manual 17 The top panel of the GE-DSH-73 Managed Industrial Switch has two terminal block connectors: • Power connector - consists of two DC power inputs and one fault alarm. • DI/DO connector - comprises two digital inputs-DI0 and DI1and two digita\ l outputs-DO0 and DO1. Figure 2-9 : Top Panel of GE-DSH-73
Page 22
Chapter 2: Installation 18 GE-DSH-73/DSH-82 and DSH-82-PoE User Manual LED Indicators The diagnostic LEDs that provide real-time information of system and optional status are located on the front panel of the GE-DSH series. The following table provides the description of the LED status and their meanings for the Managed Industrial Switch. GE-DSH-82 LED Indicators • System LED Color Status Meaning On The switch unit is power on. PWR Green Off No power. On The industrial switch is...
Page 23
Chapter 2: Installation GE-DSH-73/DSH-82 and DSH-82-PoE User Manual 19 • 10/100Base-TX Ports – Port-9, Port-10 LED Color Status Meaning On A network device is detected. Blinking The port is transmitting or receiving packets from the TX device. Green (Upper LED) Off No device attached On 1000M Port 9, Port 10 (RJ-45) Green (Lower LED) Off 10/100M On The SFP port is linking Blinking The port is transmitting or receiving packets from the TX device. Link/Active (P9, P10 SFP)...
Page 24
Chapter 2: Installation 20 GE-DSH-73/DSH-82 and DSH-82-PoE User Manual • 10/100Base-TX Ports – Po rt-1 to Port-8 LED Color Status Meaning On A network device is detected. Blinking The port is transmitting or receiving packets from the TX device. Green Off No device attached. On The port is operating in full-duplex mode. Blinking Collision of Packets occurs. Port-1 ~ 6 & Port-8 Amber Off The port is in half-duplex mode or no device is attached. • 10/100Base-TX Ports – Port-7 ,...
Page 25
Chapter 2: Installation GE-DSH-73/DSH-82 and DSH-82-PoE User Manual 21 GE-DSH-82-PoE LED Indicators • System LED Color Status Meaning On The switch unit is power on. PWR Green Off No power. On The industrial switch is the master of X-Ring group. R.M. Green Off The industrial switch is not a ring master in X-Ring group. On Power 1 is active. PWR1 Green Off Power 1 is inactive. On Power 2 is active. PWR2 Green Off Power 2 is inactive. On Power or port failure. FAULT Red Off...
Page 26
Chapter 2: Installation 22 GE-DSH-73/DSH-82 and DSH-82-PoE User Manual • PoE port link – Port-1 to Port-8 LED Color Status Meaning On An IEEE 802.3af PoE power device is detected. FWD (P1 to P8) Green Off No IEEE 802.3af PoE power device attached • 10/100/1000Base-T / SFP combo in terface - Port-9, Port-10 LED Color Status Meaning On A network device is detected. Blinking The port is transmitting or receiving packets from the TX device. Green (Upper LED) Off No device attached...
Page 27
Chapter 2: Installation GE-DSH-73/DSH-82 and DSH-82-PoE User Manual 23 Installing the Switch This section describes how to install yo ur Managed Industrial Switch and make connections to the Managed Industrial Switch. Please read the following topics and perform the procedures in the order being presented. To install your switch on a desktop or shelf, simply co mplete the following steps. In this paragraph, we will describe how to install the 8 10/100TX w/ X-Ring Managed Industrial Switch and...
Page 28
Chapter 2: Installation 24 GE-DSH-73/DSH-82 and DSH-82-PoE User Manual DIN-Rail Mounting The DIN-Rail is screwed on the Industrial Switch when out of factory. If the DIN-Rail is not screwed on the Industrial Switch, plea se see the following pictures to screw the DIN-Rail on the Switch. Follow the steps below to hang the Industrial Switch. Figure 2-10: Rear Panel - DIN-Rail Kit 1. Insert the top of DIN-Rail into the track. Figure 2-11 : Rear Panel - DIN-Rail Kit
Page 29
Chapter 2: Installation GE-DSH-73/DSH-82 and DSH-82-PoE User Manual 25 2. Lightly push the DIN-Rail into the track. Figure 2-12 : DIN-Rail mounting 3. Check if the DIN-Rail is ti ghtened on the track or not. 4. To remove the industrial switch from the track, reverse above steps. Wall Mount Plate Mounting Follow the steps below to mount the Indu strial Switch with wall mount plate. 1. Remove the DIN-Rail from the Industrial Switch; loose the screws to remove the DIN-Rail. 2. Place the...
Page 30
Chapter 2: Installation 26 GE-DSH-73/DSH-82 and DSH-82-PoE User Manual Figure 2-13: Wall mounting Wiring the Power Inputs The 6-contact terminal block connector on the top panel of GE-DSH-82-PoE is used for two DC redundant power inputs. NOTE: This product is intended to be supplied by a UL Listed Direct Plug-In Power Unit marked Class 2 or LPS and output rated 48 VDC, 380 mA minimum. Please follow the steps below to insert the power wire. 1. Insert the positive / negative DC power...