Page 71
Install and Connect the Cabinets 4-34Issue 1 September 1995 Install Cable Clamps At the back of the cabinets, on each ground plate, install two cable clamp s using the screws provided (see Figure 4-23). These clamp s hold the 25-pair input/output or cross-connect field cables in place. Figure 4-23. Location of Cable Clamps 452 1 3 Figure Notes: 1. Cable Clamp 2. Cable Slack Manager 3. Switch Cabinet4. Cabinet Trough for Port Cables 5. Spare Center Troughs
Page 72
Install Front Plates Issue 1 September 1995 4-35 Install Front Plates The front plates provide electromagnetic radiation and radio frequency (RF) shielding and earthquake protection. If you do not have a requirement for electromagnetic radiation shielding, radio frequency shielding, or earthquake protection, use the cabinet clips as described in this section. Install Front Plates on Systems with Earthquake Protection Refer to Ap pendix B to install the front plates to help provide earthquake...
Page 73
Install and Connect the Cabinets 4-36Issue 1 September 1995 Figure 4-25. Location of Cabinet Clips 1 2 3 4 5 1. Port Cabinet D 2. Port Cabinet C 3. Cabinet clips4. Port Cabinet B 5. Basic Control Cabinet A Figure Notes:
Page 74
Issue 1 September 19955-1 5 Install Telecommunications Cabling This chapter describes how to install telecommunications cables and cross- connect equipment. The specific equipment being installed varies on what was ordered for your site. Use the material presented in this chapter as an example. Install the Cross-Connect Field This section describes how to connect to the cross-connect field. Typical Cross-Connect Field Using 110-Type Hardware The cross-c onnect field is normally located directly...
Page 75
Install Telecommunications Cabling 5-2Issue 1 September 1995 Figure 5-1. Typical Cross-Connect Field Installation: 110A-Type Terminal Blocks 3 2 87 4 5 5 5 5 1 6 1. D Ri n g 2. Trunk auxiliary field 3. Port distribution field 4. Station distribution field5 . Sta ti on c a b l es 6 . Swi tch c a b ine t 7. Z113A cable slack manager 8. 25-pair cable to switch cabinet Figure Notes:
Page 76
Issue 1 September 19955-3 In Figure 5-1, a pproximately 576 4-Pair or 768 3-Pair Station Capacity is illustrated. Hardware Installation These hardware installation instructions are written so one system technician can install the following equipment: nCross-c onnec t field nCable slac k managers nSneak c urrent p rotec tor (507B) The preferred cross-connect field location is directly b ehind the switch cabinet. Install Cable Slack Managers To install the cable slack managers (Figure 5-2), proceed...
Page 77
Install Telecommunications Cabling 5-4Issue 1 September 1995 nRoute the cable from the cabinet to the wall. Place the c a ble beside one of the rows of columns in the cable slack manager (see following note). NOTE: Retainers mounted on the columns keep the cable from protruding above the top of the base of the cable slack manager. nDetermine the length of the cable required to reach from the cable slack manager to the assigned connecting/terminal block. nThe c a ble must be supp orte d on the wall....
Page 78
Issue 1 September 19955-5 Figure 5-2. Cable Routing Through Cable Slack Manager for Single Cabinet Installation 452 1 3 1. Cable Clamp 2. Trunk Auxiliary Field3 . Swi tch Ca b i ne t 4. Cabinet Trough for Port Cables 5. Spare Center Troughs Figure Notes:
Page 79
Install Telecommunications Cabling 5-6Issue 1 September 1995 Figure 5-3. Typical Port Cable Installation at Switch Cabinet Connect Control Carrier Outputs Cable Plug the connector c able in the AUX connector on the rear of the control carrier. Route the connector cable through the c a ble slack manager to the assigned connecting block in the yellow field of the trunk/auxiliary field. Refer to Table 9-9 for pinout information. The output wiring connections for the Initialization Ad ministration...
Page 80
Issue 1 September 19955-7 Label Cables Label the cables as d esc rib e d in this section. The port label shown in the next figure is installed on both ends of the 25-pair cables connecting to the trunk/auxiliary field and/or the distribution field. See Table 5-1 for the c a ble label and colour code. The building and floor labels connect from the equipment room to a site/satellite location on another floor or in another building. The auxiliary circuits connect to the trunk/auxiliary field. Figure...