Page 31
Plan and Prepare the Site 2-8Issue 1 September 1995 Lay Out and Ensure Appropriate Grounding Grounding is relatively simple for an AC-powered switch. First, connect the cabinets to each other. Then, connect a single ground wire from the Processor Port Network (PPN) to the a p proved protective ground. Grounding of the system must comply with the general rules for grounding contained in Article 250 of the National Electrical Code (NEC), National Fire Protection Agency (NFPA) 70, or the applicable...
Page 32
Determine the Location of the Equipment Closets Issue 1 September 1995 2-9 NOTE: Check location of the AC p ower receptacle. The receptacle must be on a separately current limited (fuse or circuit breaker) circ uit not controlled by a wall switch. Determine the Location of the Equipment Closets Determine the location of the e quipment closets where larg e cables can be connected out into smaller ones. Determine locations of terminating resisters for Basic Rate Interface (BRI) station circuits to...
Page 33
Plan and Prepare the Site 2-10Issue 1 September 1995 . Table 2-2. Example of a Provisioning Plan Station or Trunk Type or Feature/ServiceBuilding Location (floor/room/ desk/ information outletExtension Number or Trunk Group and Member DEFINITY G3 cabinet/ carrier/slot/ circuitRoute from equipment closetsAuxiliary Power Required? 8410 8403 Attendant Console Analog CO Digital Tie ..... Music on Hold
Page 34
September 1995 Issue 1 3-1 3 Unpack the Cabinet This chapter describes the system unpacking procedures. The DEFI NI TY System Generic 3 (G3) single-carrier cabinets are shipped in a polyethylene bag, packed in a cardboard container. The cabinet is fastened to a wood/Styrofoam pallet with two metal b ands. The cardboard container is strapped to the p allet with another metal band. !DANGER: Lifting the cabinet requires two people, as it may weigh as much as 130 pounds/60 kilograms. Use caution to...
Page 35
Unpack the Cabinet 3-2September 1995 Issue 1 !CAUTION: Deep knife penetration may damage the cabinet. 4. O pen and remove the front door and back panels from cabinet. The screw location is shown in the following figures. Figure Notes: 1. Screw that opens front cabinet door Figure 3-1. Front Cabinet Door Latch Screw Location Figure 3-2 shows the back panel screw locations. 1
Page 36
September 1995 Issue 1 3-3 Figure Notes: 1. Screws to remove 2. Screws to loosen 3. Screws to remain Figure 3-2. Back Cabinet Panel Screw Locations 1. Remove all packing material from inside the cabinet. Inspect Cabinet 2. Inspect cabinet for any d amage that may have occurred during ship ping. Report any damages according to local shipping instructions. 3 2 1 1 223 2 11
Page 37
Unpack the Cabinet 3-4September 1995 Issue 1 3. Verify the label near the circuit b reaker on the power supply toward the rear of each cabinet corresp onds to your local voltage type. !DANGER: If the label is different than the voltage typ e at your site, notify your A T & T representative immediately for a replacement power supply. Do not, under any circumstances, connect the system to power! Check Circuit Packs 4. Ensure all circ uit packs are fully inserted into the proper slots according to the...
Page 38
Issue 1 September 1995 4-1 4 Install and Connect the Cabinets This chapter describes how to install the Processor Port Network (PPN) and Expansion Port Network (EPN) single-carrier cabinets for DEFINITY System Generic 3. Directions are provided for the following configurations: nStandard reliability nHigh reliability nCritical reliability Refer to Ab out This Book for a description of each configuration. This chapter discusses single-carrier cabinets only. For information on multiple- carrier...
Page 39
Install and Connect the Cabinets 4-2Issue 1 September 1995 Install Earthquake Mounting If earthquake protection is required for your area, install earthquake floor mounting as directed in Ap pendix B. Position and Stack the Cabinets Follow the d iagram in the Customer Service Document (CSD) ship p ed with each cabinet, and stack the DEFI NI TY System Generic 3 cabinets using these steps: 1. Place the control c a binet in position at the location determined when room layout was planned. NOTE: Check...
Page 40
Connect System Cabinet Grounds Issue 1 September 1995 4-3 Connect System Cabinet Grounds To connect ground, refer to Figure 4-2 on p a ge 4-4 and perform the following: 1. At lower left rear of the Processor Port Network (PPN) cabinet (Control Cabinet A), connect a 6 AWG ground wire to the cabinet ground block. See Ap pendix F for international wire conversions for outside North America. NOTE: A screwdriver is required to loosen and tighten the screws securing the ground wire to the ground bloc k....