Home
>
ATT
>
Communications System
>
ATT DEFINITY Communications System Generic 3 For Single-Carrier Cabinets Instructions Manual
ATT DEFINITY Communications System Generic 3 For Single-Carrier Cabinets Instructions Manual
Here you can view all the pages of manual ATT DEFINITY Communications System Generic 3 For Single-Carrier Cabinets Instructions Manual. The ATT manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 1
555-230-894 Issue 1 September, 1995 DEFINITY® Communications System Generic 3 Installation (For Single-Carrier Cabinets) Graphics © AT&T 1988 Table of Contents
Page 2
Contents Issue 1 September 1995 iii Table of Contents i About This Book xv n This Book’s Organization xv n Other Books xvi n Trademarks xvii 1 Overview and Roadmap 1-1 n System Reliability 1-1 Standard Reliability 1-2 High Reliability 1-2 Critical Reliability 1-2 n DEFI NI TY System Installation Roadmap 1-3 Plan and Prepare the Site 1-3 Unpack the Cabinets 1-3 Install and Connect the Cabinets 1-3 Install Telecommunications Cabling 1-4 Install Generic 3 Management Terminal (G3-MT) 1-4 Ac...
Page 3
Contents ivIssue 1 September 1995 Generic 3 Management Terminal (G3-MT) Requirements 2-2 Cross-Connect Fields 2-2 Space Requirements 2-2 Room Layout 2-2 Figure Notes: 2-3 Cable Slack Manager (Optional) Requirements 2-4 Tools Needed 2-4 Lay Out and Ensure Ap propriate Power 2-6 Power Arrangements for AC Power 2-6 Power Arrangements for DC Power 2-7 n Lay Out and Ensure Appropriate Grounding 2-8 Connect Coupled Bonding Conductor 2-8 n Determine the Location of the Equipment Closets 2-9 n...
Page 4
Contents Issue 1 September 1995 v Figure Notes: 4-11 Connect Single-Carrier Network Grounding4-11 Figure Notes: 4-12 Coupled Bonding Conductor (CBC) 4-12 Figure Notes: 4-13 Connect DC Power to Networks 4-14 Connect AC Power to DC Power Cabinet4-14 Test DC Power Plant4-14 Connect Stand-by Power 4-14 n Locate and Connect Time Division Multiplexing (TDM) Bus 4-15 Figure Notes: 4-16 n Locate and Connect Inter-Cabinet Cables (ICC) 4-17 Figure Notes: 4-18 n Install Fibre-Optic Cables 4-19...
Page 5
Contents viIssue 1 September 1995 Install Front Plates on Systems with Earthquake Protection4-35 Install Cabinet Clip On Systems without Earthquake Protection4-35 Figure Notes: 4-36 5 Install Telecommunications Cabling 5-1 n Install the Cross-Connect Field 5-1 Typical Cross-Connect Field Using 110-Typ e Hardware 5-1 Figure Notes: 5-2 Hardware Installation 5-3 n Install Cable Slack Managers 5-3 n Route Cables from Cabinet to Cross-Connect Field 5-3 Figure Notes: 5-5 Figure Notes: 5-6 n Connect...
Page 6
Contents Issue 1 September 1995 vii Power up AC-Powered Switch 7-3 Power up DC-Powered Switc h 7-3 Verify Messages on Terminal 7-3 n Introduction to Terminal Screens and Commands 7-4 Screens 7-4 Commands 7-5 Getting Help 7-5 n Log in to the System 7-5 n Set Required Country Options 7-6 n Change Craft Password 7-9 n Set Date and Time 7-11 n Set System Maintenance Parameters 7-14 n Save Translations 7-15 Logoff 7-17 8 Test the System 8-1 n Check the System Status for Each Cabinet 8-1 n Check...
Page 7
Contents viiiIssue 1 September 1995 n Re-install Front Doors 8-20 n Next Steps 8-20 9 Install and Wire Telephones and Other Equipment 9-1 n Telephone Connection Example 9-1 Connect Adjunct Power 9-3 n Analog Station or 2-Wire Digital Station Examp le 9-5 n Analog Tie Trunk Examp le 9-6 n Digital Tie Trunk Examp le 9-9 n Auxiliary Connector Outputs 9-10 n APP Connector and Cable Diagrams (Pinout Charts) 9-15 n Install Initialization and Ad ministration System (INADS) Interface 9-21 Figure Notes:...
Page 8
Contents Issue 1 Septemb er 1995 ix Figure Notes: 9-32 Reset Light Emitting Diodes (LED) on Power Distribution Unit 9-33 n Install the MSP-1 Power Sup p ly 9-34 Underwriter’s Laboratories (UL) Information 9-34 Important Safety Instructions 9-35 Description of the MSP-1 Power Supply 9-36 Locate the MSP-1 Power Supp ly9-36 Mount the MSP-1 Power Su p ply9-36 Connect the Power Supply 9-37 Figure Notes: 9-38 Figure Notes: 9-39 n Install the Basic Rate Interface (BRI) Terminating Resistor 9-39...
Page 9
Contents xIssue 1 September 1995 Install Federal Communications Commission (FCC) Registered Music Source 9-54 Install Record ed Announcement Equipment9-54 Re quirements 9-54 Figure Notes: 9-55 n Install Processor Data Modules (PDMs) 9-55 Re quirements 9-55 Installation9-56 Figure Notes: 9-57 Connection to Individual Processor Data Modules (PDMs) 9-57 Figure Notes: 9-58 n Install Call Management System (CMS) Interface 9-58 Figure Notes: 9-59 n Install Property Management System (PMS)...
Page 10
Contents Issue 1 Septemb er 1995 xi Desc ription 10-3 Procedure10-3 n Make Test Calls (Three-Cabinet Switch) 10-4 Desc ription 10-4 Procedure10-5 n Test the Attendant Console 10-8 Description10-8 Procedure10-8 n Test the Selector Console 10-9 Description10-9 Procedure10-9 n Test External Ringing 10-9 Description10-9 Procedure—Ringing Device Installed 10-9 Procedure—Ringing Device Not Installed 10-10 n Test Queue Warning Indicator 10-10 Description10-10 Procedure—Queue Warning Indicator...