Page 21
DEFI NI TY System Installation Road ma p Issue 1 September 1995 1-5 Activate the System Complete this task by following the instructions provided in Chapter 7. 1. Power u p switch. 2. Log in to the system. 3. Set required country options. 4. Change craft password. 5. Set date and time. 6. Set system maintenance parameters, if Packet Controller (TN778 Circuit Pack) is included. 7. Save and back up translations. Test the System Complete this task by following the instructions provided in Chapter 8. 1....
Page 22
Overview and Roadmap 1-6Issue 1 September 1995 Install and Wire Telephones and Other Equipment Complete this task by following the instructions provided in Chapter 9. NOTE: For easier reference, installation steps and test steps are grouped in separate chapters. It may be b etter to install each hardware component, administer it, and then test it before going on to install another c omponent. As an example, install the Attendant Console using the procedures in Chapter 9, Install and Wire...
Page 23
DEFI NI TY System Installation Road ma p Issue 1 September 1995 1-7 Administer the DEFINITY System According to Customer Requirements After the hardware is installed and the system is activate d, the data for system and telephone features must be administered, using the provisioning plan created for this customer in Step 7 in Chapter 2, Plan and Prepare the Site. All steps for the administration of the system are provided in the United Kin g dom English book, DEFI NIT Y Com munications System...
Page 24
Issue 1 September 1995 2-1 2 Plan and Prepare the Site This chapter describes tasks required to plan, prepare, and provision the site depending upon which DEFI NI TY System Generic 3 was ordered. Perform the following: nCheck the customer’s ord er. nLocate and lay out the equipment room. nLay out and ensure appropriate power. nLay out and ensure appropriate grounding. nDetermine location of equipment closets. nDetermine location of external trunk lines. nCreate a provisioning plan. Check the...
Page 25
Plan and Prepare the Site 2-2Issue 1 September 1995 Locate and Lay Out the Equipment Room Determine where the DEFI NI TY System Generic 3 equipment room is located, and then lay out the equipment room floor plan for DEFI NI TY System c a binets, management terminal and desk, cross-connect hardware and adjuncts, etc. Generic 3 Management Terminal (G3-MT) Requirements In general, the Management Terminal must be directly connected to the c abinet with the shortest possible cable. For maintenance...
Page 26
Locate and Lay Out the Equipment Room Issue 1 September 1995 2-3 Additional Notes: AC receptacles must be separately current protected (fuse or circuit breaker) and not under the control of a wall switch. Rec eptacles must not be shared with other equipment and should be located away from the cross-connect field. System must be grounded by one of the approved methods. See Appendix A. Earthquake protection and/or electromagnetic shielding may be required. See Appendix B. Figure 2-1. Typical Floor...
Page 27
Plan and Prepare the Site 2-4Issue 1 September 1995 Cable Slack Manager (Optional) Requirements A cable slack manager (optional) is 32 inches (81 cm) wide and 40 inches (102 cm) deep. Normally, one slack manager is needed for each c abinet stack. Extra slack managers may be ordered, if necessary. Tools Needed Table 2-1 lists the tools and test equipment required to install the switch. Make sure all tools are available before installing the DEFINITY S y st em Generic 3.
Page 28
Locate and Lay Out the Equipment Room Issue 1 September 1995 2-5 * Electric drill and drill bits are required for earthquake mounting. † Since U.S./English fasteners are used, U.S./English tools are required unless an exact match can b e found among metric tools. ‡ Required when installing an AC p owere d switch. Table 2-1. Tools and Test Equipment Inventory Tasks Equipment RequiredRecommended TypeRecommended Types for Europe Unpacking CabinetTin Snips Utility Knife Adjustable Wrench 6- or 8-inch...
Page 29
Plan and Prepare the Site 2-6Issue 1 September 1995 Lay Out and Ensure Appropriate Power 1. Lay out and ensure appropriate power for switch cabinets and management terminal in equipment room. 2. Provide one power outlet per single-carrier c a binet. 3. Have an electrician check the commercial power and verify power is available and present. Power Arrangements for AC Power The following procedures apply to both the Processor Port Network (PPN) cabinet(s) and Expansion Port Networks (EPN) cabinet(s)...
Page 30
Locate and Lay Out the Equipment Room Issue 1 September 1995 2-7 Power Arrangements for DC Power The following table shows the input DC requirements for the system -48 VDC Input Power Re quirements Parameter Requirements Static Voltage -48 VDC nominal, -42.5 VDC minimum, -52.5 VDC maximum (measured at input to System cabinet) under normal operating conditions. Dynamic Vol t a g eTransient change in volta ge— + /- 5% of steady state voltage. Allowed transient duration—Up to 200 milliseconds. AC...