Home
>
ATT
>
Communications System
>
ATT DEFINITY Communications System Generic 3 For Single-Carrier Cabinets Instructions Manual
ATT DEFINITY Communications System Generic 3 For Single-Carrier Cabinets Instructions Manual
Here you can view all the pages of manual ATT DEFINITY Communications System Generic 3 For Single-Carrier Cabinets Instructions Manual. The ATT manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 41
Install and Connect the Cabinets 4-4Issue 1 September 1995 Figure 4-2. Typical AC Power and Grounding Arrangement for Single-Carrier Cabinet (Rear View) ON ON OFF OFF ON ON OFF OFFON ON OFF OFFON ON OFF OFF 8 13 9 5 10 6 11 7 77 712 12 11 3 4 2 1. Expansion Port Network (EPN) Con tro l Cabinet A 2. Circuit breaker 3. Power sup ply 4. Power receptacle in power supply 5. Processor Port Network (PPN) Control Cabinet A 6. Cabinet-stac k single-point ground block 7. Power cord 2.5 meters8. National...
Page 42
Connect Battery Leads Issue 1 September 1995 4-5 Connect Battery Leads To prevent the batteries from discharging, the control c a binet is shipped with the battery lead disc onnected. To connect the batteries, perform the following: At cabinet(s): 1. Ensure the circuit breakers on each cabinet are OFF. Each cabinet has its own power supply and the circuit breaker is located on the rear of each power supply. See Figure 4-3. 2. Connect the battery lead: See Figure 4-3. The b attery is near the top of...
Page 43
Install and Connect the Cabinets 4-6Issue 1 September 1995 Connect Power Connect either AC or DC power as d esc rib e d in this section. Verify the label near the circuit breaker on the power supply toward the rear of each cabinet corresp onds to your local voltage type. !DANGER: If the label is different than the voltage type at your site, notify your A T & T representative immediately for a replacement power supply. Do not, under any circumstances, connect to power! Connect AC Power Figure 4-2...
Page 44
Connect Power Issue 1 September 1995 4-7 GRD -48V -48V RTN 1 GRD -48V -48V RTN 1 GRD -48V -48V RTN 1 GRD -48V -48V RTN 1 -48V RTN -48V GRD 1 1 1 1 1 1 1 1 3 8 13 18 4 9 14 5 5 10 15 15 15 15 1 1 1 6 11 11 16 16 16 2 2 2 2 7 7 7 12 17 (-48V RTN & GRD) 75A-48V -48V GR D GR D -48V -48V RTN 75A
Page 45
Install and Connect the Cabinets 4-8Issue 1 September 1995 Figure 4-4. Typical Single-Carrier Cabinet System Direct Current (DC) Power and Grounding Wiring !CAUTION: Grounding of the system shall comply with the general rules for grounding contained in Article 250 of the National Electrical Code (NEC), National Fire Protection Agency (NFPA) 70, or the applicable code in your area. See Appendix G for more information. Determine the a p proved ground in the building to be wired. See Ap pendix A....
Page 46
Connect Power Issue 1 September 1995 4-9 Connect Power Plant Ground To connect the power plant ground, complete the following steps: 1. At the DC power cabinet, connect a 1 AWG ground wire to the GROUND DIS CHA RGE b a r. 2. Route the g round wire out of the c a binet and terminate it on the approved ground (see Figure 4-5). The a pproved ground must be identified with a grounding tag (AT&T FORM 15657NR, or equivalent). Figure 4-5. Power Plant Grounding 1 2 34 1. 1 AWG wire 2. Approved ground. Must...
Page 47
Install and Connect the Cabinets 4-10Issue 1 September 1995 Connect Frame Ground Connect the 6 AWG frame ground cable to the cabinet frame by following these steps: 1. Measure and cut a length of 6 AWG cable. Use the provided cable or measure and cut a length of 6 AWG cable long enough to reach between the GROUND CONNECTION terminal in the DC Battery Cabinet and the GROUND DISCHARGE bar in the DC Power Cabinet. 2. Crimp terminal lugs on each end of the wire. Terminal lugs are furnished as part of...
Page 48
Connect Power Issue 1 September 1995 4-11 Connect DC Power Distribution Box Grounding Run the 6 AWG ground cable from the DC Power Cabinet to each DC Power Distribution Unit, using the following steps: 1. At the DC Power Cabinet, connect 6 AWG wire to the GROUND DISCHARGE bar. Route the cable to the DC Power Distribution Unit. Connect the cable to the GRD Terminal Block in the DC Power Distribution Unit (see Figure 4-6). 2. Repeat Step 1 for each remaining DC Power Distribution Unit. Figure 4-7. DC...
Page 49
Install and Connect the Cabinets 4-12Issue 1 September 1995 1. At the DC Power Cabinet, connect a 6 AWG cable to the GROUND DISCHARGE bar. Route the cable to the port Cabinet Carrier A. Connect the cable to the single-point ground block in the Control Carrier (see Figure 4-7). 2. Repeat Step 1 for each port Cabinet Carrier A in the system. Figure 4-8. Ground Connection for Single-Carrier Network Coupled Bonding Conductor (CBC) The coupled bonding conductor (CBC) connects the cabinet single-point...
Page 50
Connect Power Issue 1 September 1995 4-13 1. Connect a 10 AWG wire to the power cabinet ground discharge bar. See Figure 4-9). 2. Repeat for each port network c a binet. NOTE: A Coupled Bonding Conductor (CBC) must be tie-wrapped to all trunk c a bles and terminated at the coupled bonding conductor terminal bar. Figure 4-9. Coupled Bonding Conductor 3 3 3 8 13 4 9 14 14 5 10 15 1 6 11 2 7 1212 1. 25-Pair tip and ring cables to network cabinets. 2. Coupled bonding conductor terminal bloc k 3....