TiE Businesscom Plus Hardware Manual
Here you can view all the pages of manual TiE Businesscom Plus Hardware Manual. The TiE manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 71
II-4INSTALLING THE AND CHECKING WIRING Static Precautions The are sensitive to static electricity. The rules below are safe-handling techniques for sensitive equipment. Following them when installing or maintaining will help you to guard against static damage. o Always handle a PCB in the static-free, conductive bag in which it was shipped. Do not use this bag as a holder for the PCB when it is outside the bag. o Do not slide the PCB across a work surface. o Only surfaces or items at ground...
Page 72
II-4INSTALLING THE AND CHECKING WIRING ---------------------------------------------------------------------- Cover C/O FIGURE 2-7 BUSINESSCOM KSU (P/N 15000 or P/N 15001) 2-20
Page 73
II-4INSTALLING THE AND CHECKING WIRING Preparation, BUSINESSCOM PLUS Before installing optional prepare the as 1. 2. 3. 4. follows: Strap the battery into place, but do not plug it into connector CNBT.When the battery is weak or is not connected, the letters BAT flash in the upper right-hand corner of all Display phones. On switch set toggle 1 so that it is opposite the number 1. On set toggle 2 so that it is next to the number 2 for internal Music On Hold or opposite the number 2 for external...
Page 74
II-4INSTALLING THE AND CHECKING WIRING BatteryBe sure that the lithium battery is in place but unconnected.Display phones indicate if the battery is not connected by flashing the letters BAT in the upper right corner of the display. Inserting in BUSINESSCOM PLUS & To install a (when only key telephone circuits are used), and/or a PCB, refer to Figure 2-7 and Figure 2-8Installing the B-COU-A PCB, BUSINESSCOM PLUS and connect the ribbon cables as follows: Connector & CNA2 & or CNB2 CNB2...
Page 75
II-4INSTALLING THE AND CHECKING WIRING ------ ------ ---------- ----------- Cover FIGURE 2-8 INSTALLING THE PCB, BUSINESSCOM PLUS 2-23
Page 76
II-4INSTALLING THE AND CHECKING WIRING Inserting in the BUSINESSCOM PLUS Setting WR Set the WR switch on the B-MPU- PCB to the initial position. Setting B-TSU-ATo select internal or external Music On Hold on a BUSINESSCOM PLUS set SW1 on the B-TSU-A PCB as follows: Feature Internal MOHPosition 1 External MOHOpposite end of Position 1 Potentiometer AdjustmentsPotentiometer on the B-TSU-A PCB is used to adjust the background level for MOH. (For installation of optional see INSTALLING OPTIONAL...
Page 77
INSTALLING OPTIONAL EQUIPMENT This section provides information on equipment and accessories required to use optional features. Installing the B-LBR-A PCB for Loud Bell Relay Operation Refer to Figure 2-9Installation of B-TBU-D PCB for B-LBR-A Operation. Installation 1. 2. 3. 4. 5. 1 Unplug the telephone, if previously installed. Remove two screws from bottom of telephone, and open it. Remove the existing B-TBU-A/B/C and replace it with the B-TBU-D Remove the existing 4-conductor Replace it with the...
Page 78
INSTALLING OPTIONAL EQUIPMENT ----- ______ FIGURE 2-9INSTALLATION OF B-TBU-D FOR B-LBR-A OPERATION
Page 79
INSTALLING OPTIONAL EQUIPMENT For any station position r 66 Block I --1111GRN BCP-LBR DC INI I I M C Make Common Break Make Common Break Station Cable I KSLJSTA GRN WHT Modular Jack FIGURE 2-10 BUSINESSCOM PLUS LOUD BELL RELAY WIRING 2-27
Page 80
INSTALLING OPTIONAL EQUIPMENT Installing the B-LBR-A PCB for Loud Bell Relay Operation Refer to Figure 2-10BUSINESSCOM PLUS Loud Bell Relay Wiring. At the Station Block end: 1. Terminate the and pairs normally. Do not install bridging clips. 2. Connect: o the lead to screw terminal C on the B-LBR-A box o the lead on terminal E. o one pair of cross-connect cabling between the two L terminals on the B-LBR-A box and each side of the AT station leads on the B Block, for this extension. 3. Install...