TiE Businesscom Plus Hardware Manual
Here you can view all the pages of manual TiE Businesscom Plus Hardware Manual. The TiE manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 61
II-2 INSTALLING THE KSU AND POWER SUPPLY Mounting the BUSINESSCOM PLUS 64 Expansion Cabinet the BUSINESSCOM PLUS 36 KSU-B (P/N 15201) according to the preceding paragraph. 2 . Remove the top of the KSU. 3. Position the Expansion Cabinet on top of the KSU. 4. Drill pilot holes at these points, and insert fasteners having a shank diameter. Screw in fasteners until the clearance between the fastener head and the mounting surface is inch. 5. Refer to Figure 2-4 BUSINESSCOM 64 KSU-B (P/N 153011,and...
Page 62
II-2INSTALLING THE KSU AND POWER SUPPLY Grounding the Power Supply ,The power supply is grounded through the third-wire ground lead in the AC power cord. For BUSINESSCOM PLUS systems, connect a grounding wire AWG or heavier) between the KSU grounding lug and the power supply ground lug to prevent electromagnetic interference. Connecting the Power Supply to the KSU WARNING: BEFORE CONNECTING OR DISCONNECTING THE POWER SUPPLY, THE POWER SUPPLY MUST BE OFF. --- Turn off the power,and connect the power...
Page 63
II-2 INSTALLING THE KSU AND POWER SUPPLY Initializing the SystemFor a complete system initialization: Disconnect lithium battery on B-MPU- or PCB. 2. Place the WR switch in the up position (initial) position (see Figure 2-5 Programming Switch WR, B-MPU-PCB). 3. Plug in the power supply, and turn it on. After approximately 10 seconds: 1. Move the WR switch to the down position (i.e., normal). 2. Plug in the lithium battery. Data in memory is now protected against power failure. 3. Remove Programming...
Page 64
II-2INSTALLING THE KSU AND POWER SUPPLY Mn Battery INITIAL NORMAL FIGURE 2-5 PROGRAMMING SWITCH WR, B-MPU- PCB 2-12
Page 65
INSTALLING THE RSU AND POWER SUPPLY ----- (DO NOT use pointed object), KNTERING THE PROGRAMMING MODE
Page 66
INSTALLING STATION CABLING SYSTEM CONNECTIONS Connecting Blocks Mounting Connecting BlocksMount the connecting blocks or equivalent) to the right of the KSU. These blocks are recommended for station cable, console cable, External Paging, Background music and alarm terminations (see Tables 2-l through By specification, COM PLUS systems use twisted-pair station cabling wiring in which each pair has ten twists per length of cable. Port Assignments on BlockUse 25-pair cables to connect the station...
Page 67
INSTALLING STATION CABLING AND SYSTEM CONNECTIONS TABLE 2-l BUSINESSCOM PLUS CUT DOWN BLOCKTABLE 2-2 BUSINESSCOM PLUS 12 CUT DOWN BLOCK T Modular Adaptor Number 1 2 3 4 5 6 7 8 9 11 12 13 14 15 16 25 Pair CableModular Adaptor Number 2 5 PairCable Conn ColorCode 26 WHT-BLU 1BLU-WHT 27 2 ORN-WHT 28WHT-GRN 3 GAN-WHT 29 WHT-BRN 4BRN-WHT 3 0 WHT-SLT 5 31RED-BLU 6BLU-RED 32 RED-ORN 7ORN-RED 33 RED-GRN I Block Term 1 3 4 5 7 910 11 12 13 1516 17 1920 2324 25 2728 29 3132 33a3435 a36 37 38 39 40 4142...
Page 68
CABLE BUSINESSCOM 36 KSU-B (P/N 15201) l .. BCP 24 KSU-B (15101) BUSINESSCOM 64 EXP CAB BUSINESSCO (P/N 15301) (P/N 15101 P/N BLOCK T CLIP NO.2 3 BLOCK BLOCK CONN.PIN27228 3 29 4 CABLECOLORWHT-BLUBLU-WHT WHT-ORN ORN-WHT WHT-GRN GRN-WHT WHT-BRN BRN-WHTWHT-SLT SLT-WHTRED-BLU BLU-RED RED-ORN ORN-RED RED-GRN GRN-RED RED-BRN BRN-RED RED-SLT SLT-RED BLK-BLUBLU-BLKBLK-ORN ORN-BLK BLK-GRN GRN-BLK BLK-BRN BRN-BLKBLK-SLT SLT-BLKYEL-BLU BLU-YEL YEL-ORN ORN-YEL YEL-GRN GRN-YEL YEL-BRN BRN-YELYEL-SLT...
Page 69
INSTALLING STATION CABLING AND SYSTEM CONNECTIONS Connecting Blocks Unsupervised Conference Mounting a Jack Assembly Station Cabling Installing Sta- tion Cabling Cabling OPX Lines Terminating Cabling at BlocksIf Unsupervised Conference is used, punch down at the following points a 600-ohm resistor with a rating of Watt and a 10% tolerance: System No.Clip BUSINESSCOM PLUS 21, 22 BUSINESSCOM PLUS 24 33, 34 BUSINESSCOM PLUS 36 B2 BUSINESSCOM PLUS 64B35, When the B-MPU-C PCB is installed, the station...
Page 70
INSTALLING STATION CABLING AND SYSTEM CONNECTIONS Station Cabling CAUTION:FOR PROPER OPERATION, IT IS IMPORTANT TO MAINTAIN PAIR-FOR-PAIR CONNECTIONS AND OBSERVE POLARITY OF PAIRS AT ALL LOCATIONS WHERE TERMINATIONS OR CROSS CONNECTIONS ARE MADE. Install bridging clips for the AT, AR, BT, and BR terminals. Connecting CO Lines, BUSINESSCOM PLUS The telco installs the RJllC connectors to which the KSU is attached. CAUTION:HAVE THE TELCO PERSONNEL INSTALL THE CO LINES WITHIN SIX FEET OF THE SYSTEM...