Philips Epiq 5 Manual
Here you can view all the pages of manual Philips Epiq 5 Manual. The Philips manuals for Ultrasound System are available online for free. You can easily download all the documents as PDF.
Page 11
3 INTRODUCTION 3.1 AUDIENCE This document is intended for hospital staff, health care system integrators, software designers or implementers. It is assumed that the reader has a working understanding of DICOM. 3.2 REMARKS DICOM, by itself, does not guarantee interoperability. However, the Conformance Statement facilitates a first - level validation for interoperability between different applications supporting the same DICOM func tionality. This Conformance Statement is not intended to...
Page 12
IOD Information Object Definition ISO International Standard Organization LOINC Logical Observ ation Identifiers Names and Codes MPPS Modality Performed Procedure Step MW L Modality Worklist R Required Key Attribute O Optional Key Attribute PDIR Patient Directory screen on EPIQ/Affiniti PDU Protocol Data Unit PDE Patient Data Entry screen on EPIQ/Aff initi PS3.x Reference to part ‘x’ the DICOM 3.0 Standard PSC Philips Support Connect. It is the primary...
Page 13
Integrated Healthcare Enterprise (IHE) Cardiology Technical Framework, Vol. 2, Transactions, Revision 4.0, Final Text, August 5, 2011 Integrated Healthcare Enterprise (IHE) Cardiology Technical Framework S upplement, Stress Testing Workflow, Trial Implementation Revision 2.1, October 15, 2010 Joint VA / DoD DICOM Conformance Requirements for Digital Acquisition Modalities, Version 3.0, September 28, 2005 E7 and E5/A70 and A50 1.5.x.x DICOM Conformance Statement 000490000000111 Rev...
Page 14
4 NETWORKING 4.1 IMPLEMENTATION MODEL 4.1.1 Applicati on Data Flow Send Images, Reports, Commits; Query ImagesStorage Application Entity Update Worklist Acquire Images Workflow Application Entity Film ImagesHardcopy Application Entity DICOM Standard Interface Local AE's Connected AE's Receives Images, Reports, Commits; Returns Commitments Sends images Receives queries Provides Worklist Items Receives MPPS Create / Set Prints Film Sheets E7 and E5/A70 and A50 1.5.x.x...
Page 15
Figure 1: APPL IC AT ION DAT A FLOW DI AG R AM — The Storage Application Entity sends Images and Structured Reports to a remote AE. It is associated with the local real -world activity “Acquire” on EPIQ/Affiniti . Sending of images may occur automatically when configured to do so, either “After Each Print/Acquire” or “At End of Exam” w ith or without “Send on Demand”, with separate export destination configurati on of each acquisition control. The system can also be configured to...
Page 16
o Append from Patient Directory Select an Ended study from the Patient Directory and press c hoose “Append.” Two options are available: • “Add” (if less than 24 hours old), allows images to be added to the original Study, using the same Study Instance UID, and a new Performed Procedure Step SOP Instance UID. If more than 24 hours old, only “Create” will be available. • “Create”, which will create a new Study Instance UID. o Append from Image Review Open the Study in...
Page 17
• Retrieve using the Query/Retrieve service • Unsolicited push from a Storage SCU to EPIQ/Affiniti acting as a Storage SCP. This mechanism requires that the Storage SCU to have previously been configured as an acceptable DICOM Storage Device. 4.1.2.2 Function al Definition of Workflow Application Entity Update Worklist attempts to download a Modality Worklist from a Modality W orklist SCP with studies matching the search criteria. Default query criteria are Modality of US (ultrasound)...
Page 18
4.1.3 Sequencing of Real -World Activities StorageHardcopyWorkflowDepartment SchedulerPrinterImage Manager 1 Query Worklist 2 Receive Worklist 3 Create MPPS 9 Complete MPPS 5 Print Film Sheet 10 Image and SR Document Commit Request 12 Accept Commitment Response user update or query 7 Store SR Document 4 Store Image acquire first image end exam store completion acquireimage end exam sheet full commit status update 8 Discontinued MPPS cancel exam optional append11 Optional Append or Accept...
Page 19
Notes: • Messages may slightly change order occasionally. • All selected store, print and workflow devices are sent data during the exam when configured for send “After Each Print/ Acquire” or at “At End of Exam.” • Selecting a study from Review for export will send to all selected devices. Other workflow situations (e.g. unscheduled procedure steps) will have other sequencing constr aints. Printing or storage could equally take place after image acquisition. Printing could be...
Page 20
Figures 2c Illustrates Flow Changes to Send At End of Exam with Send on Demand (SoD) StorageHardcopyWorkflowDepartmentSchedulerPrinterImageManager 3 Create MPPS 7 Complete MPPS 4 Print Film Sheet 8 Image and SR Document Commit Request 9 Accept Commitment Response 6 Store Final SR Document 1 Acquire Images first storedimage end exam storecompletion end exam sheet full commit statusupdate Send onDemand2 Store Images, SR and Print Film Sheets since last SoD 5 Store Remaining Images, Send Remaining...