Home
>
Panasonic
>
Communications System
>
Panasonic Kx-tvs90 Voice Processing System Installation Manual
Panasonic Kx-tvs90 Voice Processing System Installation Manual
Here you can view all the pages of manual Panasonic Kx-tvs90 Voice Processing System Installation Manual. The Panasonic manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 21
VOICE PROCESSING SYSTEM OVERVIEW Installation Manual 21 1.3.5 Specifications 1.3.6 Hardware 2 Flash Memory Cards. 2 Telephone Inputs (RJ11C) 1 RS-232C Connector 1 DIP Switch (4-bit) 1.3.7 Recommendations for System Configuration General guideline: a ratio of 6/1 (for every 6 lines, 1 port). There are 2 questions to ask when considering how many ports are desirable: Are the ports answering all incoming calls or just forwarded/transferred calls? If they are answering incoming calls, how busy are the...
Page 22
VOICE PROCESSING SYSTEM OVERVIEW 22 Installation Manual One port may not support an Automated Attendant configuration with 5 CO lines. The preceding recommendations for Automated Attendant ports may have to be modified for heavy traffic. Table 4 CO Lines Port 1-4 1 5-8 2
Page 23
VOICE PROCESSING SYSTEM OVERVIEW Installation Manual 23 1.4 DIGITAL INTEGRATION 1.4.1 General There are 2 types of Digital Integration: APT Integration and DPT Integration. APT Integration is available when the VPS is connected to a KX-TA624. DPT Integration is available when the VPS is connected to a KX-TD or KX-TA1232 digital PBX. 1.4.2 APT Integration To the Panasonic KX-TA624, the VPS ports look like proprietary telephones. The PBX thinks that the VPS is a proprietary telephone, and the VPS mimics...
Page 24
VOICE PROCESSING SYSTEM OVERVIEW 24 Installation Manual 1.4.4 DPT Integration To the Panasonic KX-T series PBX that uses DPT Integration, the VPS ports look like digital extensions. The PBX thinks that the VPS is a digital phone, and the VPS mimics all actions of a digital set. Another advantage of digital integration is that the 2B+D communication provides 2 VPS ports for each Digital Station port. Communication between the VPS and the PBX through digital integration requires the proper software...
Page 26
INSTALLATION 26 Installation Manual 2.1 SAFETY PRECAUTIONS Please read the following precautions before installing the VPS. 2.1.1 Installation The VPS needs to be mounted on a wall. Improper placement of the system may result in malfunction, noise, or discoloration. Avoid installing the VPS in the following places: in direct sunlight; in hot, cold, or humid places in new areas where there are thermal springs, etc. (where sulfuric gas may damage the equipment or contacts). where shocks or vibrations...
Page 27
INSTALLATION Installation Manual 27 2.1.2 Wiring To assure good quality telephone connection, it is recommended new and modifications to existing installation of customer premise wiring shall use solid twisted pair copper conductors with minimum 24 gauge that comply with the electrical specifications for Category 3 wiring as detailed in ANSI/EIA/TIA-570A Building Wiring Standards. Do not wire the telephone cable parallel to an AC power source, computer, etc. If cables are run near those wires,...
Page 28
INSTALLATION 28 Installation Manual 2.2 UNPACKING Unpack the box and check the items below. Table 5 Main Unit 1 AC Cord 1 Screws (Wall Mounting) 3 Anchor Plugs (Wall Mounting) 3
Page 29
INSTALLATION Installation Manual 29 2.3 MOUNTING THE VPS ON THE WALL The wall where the VPS is to be mounted must be able to support the weight of the VPS. If screws other than the ones supplied are used, use the same-sized diameter screws as the enclosed ones. To Mount on a Wooden Wall: 1. Place the template (included) on the wall to mark the 3 screw positions. 2.Install the 3 screws (included accessories) into the wall. 3.Hook the unit on the screw heads. Template Wooden Wall Drive the screw to this...
Page 30
INSTALLATION 30 Installation Manual 2.4 FRAME GROUND CONNECTION IMPORTANT!!! Connect the frame of the main unit to the ground. 1.Loosen the screw. 2.Insert the grounding wire. 3.Tighten the screw. 4.Connect the grounding wire to the ground. In most of North America, the ground provided by the Third wire ground at the commercial or residential power outlet will be satisfactory. However, in some cases this ground may be installed incorrectly. Therefore, the following test procedure should be performed....