Nortel Modular Ics Companion Installer Guide
Have a look at the manual Nortel Modular Ics Companion Installer Guide online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 211 Nortel manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
Installation / 25 P0992639 01 Modular ICS Companion Installer Guide Input connector pinout Input wiring Connector Pin Signal Output connector IBIX1 1, 2 TCM 1 OBIX1 3, 4 TCM 2 OBIX2 5, 6 TCM 3 OBIX3 7, 8 TCM 4 OBIX4 IBIX2 1, 2 TCM 5 OBIX5 3, 4 TCM 6 OBIX6 5, 6 TCM 7 OBIX7 7, 8 TCM 8 OBIX8 IBIX3 1, 2 TCM 9 OBIX9 3, 4 TCM 10 OBIX10 5, 6 TCM 11 OBIX11 7, 8 TCM 12 OBIX12 IBIX4 1, 2 TCM 13 OBIX13 3, 4 TCM 14 OBIX14 5, 6 TCM 15 OBIX15 7, 8 TCM 16 OBIX16 IBIXn Pin 3 Pin 1 Pin 2 Pin 4 Pin 6 Pin 8Pin 5 Pin 7
26 / Installation Modular ICS Companion Installer Guide P0992639 01 RPI-8 BIX wiring chart PinRPI Connector BoardLabelWire color 26OBIX1 BS1-PWRWhite-Blue 1Blue-White 27TCMWhite-Orange 2Orange-White 28+PWRWhite-Green 3Green-White 29OBIX2 BS2-PWRWhite-Brown 4Brown-White 30TCMWhite-Slate 5Slate-White 31+PWRRed-Blue 6Blue-Red 32OBIX3 BS3-PWRRed-Orange 7Orange-Red 33TCMRed-Green 8Green-Red 34+PWRRed-Brown 9Brown-Red 35OBIX4 BS4-PWRRed-Slate 10Slate-Red 36TCMBlack-Blue 11Blue-Black 37+PWRBlack-Orange 12Orange-Black 38OBIX5 BS5-PWRBlack-Green 13Green-Black 39TCMBlack-Brown 14Brown-Black 40+PWRBlack-Slate 15Slate-Black
Installation / 27 P0992639 01 Modular ICS Companion Installer Guide 41 OBIX6 BS6 -PWRYellow-Blue 16Blue-Yellow 42TCMYellow-Orange 17Orange-Yellow 43+PWRYellow-Green 18Green-Yellow 44 OBIX7 BS7 -PWRYellow-Brown 19Brown-Yellow 45TCMYellow-Slate 20Slate-Yellow 46+PWRViolet-Blue 21Blue-Violet 47 OBIX8 BS8 -PWRViolet-Orange 22Orange-Violet 48TCMViolet-Green 23Green-Violet 49+PWRViolet-Brown 24Brown-Violet Pin RPI Connector BoardLabelWire color
28 / Installation Modular ICS Companion Installer Guide P0992639 01 RPI-16 BIX wiring chart PinRPI Connector BoardLabelWire color 26OBIX9 BS9-PWRWhite-Blue 1Blue-White 27TCMWhite-Orange 2Orange-White 28+PWRWhite-Green 3Green-White 29OBIX10 BS10-PWRWhite-Brown 4Brown-White 30TCMWhite-Slate 5Slate-White 31+PWRRed-Blue 6Blue-Red 32OBIX11 BS11-PWRRed-Orange 7Orange-Red 33TCMRed-Green 8Green-Red 34+PWRRed-Brown 9Brown-Red 35OBIX12 BS12-PWRRed-Slate 10Slate-Red 36TCMBlack-Blue 11Blue-Black 37+PWRBlack-Orange 12Orange-Black 38OBIX13 BS13-PWRBlack-Green 13Green-Black 39TCMBlack-Brown 14Brown-Black 40+PWRBlack-Slate 15Slate-Black
Installation / 29 P0992639 01 Modular ICS Companion Installer Guide 41 OBIX14 BS14 -PWRYellow-Blue 16Blue-Yellow 42TCMYellow-Orange 17Orange-Yellow 43+PWRYellow-Green 18Green-Yellow 44 OBIX15 BS15 -PWRYellow-Brown 19Brown-Yellow 45TCMYellow-Slate 20Slate-Yellow 46+PWRViolet-Blue 21Blue-Violet 47 OBIX16 BS16 -PWRViolet-Orange 22Orange-Violet 48TCMViolet-Green 23Green-Violet 49+PWRViolet-Brown 24Brown-Violet 50 25 Pin RPI Connector BoardLabelWire color
30 / Installation Modular ICS Companion Installer Guide P0992639 01 Installing base stations Before installing wireless equipment, ensure that a site planner has determined base station locations and recorded them. Before installing or relocating wireless equipment in the United States, verify that you have approval from UTAM Inc. by calling the Nortel Customer Response Center at 1-800-321- 2649. You will be given codes and credits that are necessary to activate the system. Please see Software keys (U.S. only) on page 67 before calling. Positioning a base station Avoid installing base stations on large concrete or marble columns. This affects radio coverage. If possible, place the base station at least 1m (40 in.) from such columns. Do not mount a base station where metalwork is near the antenna housings. Be careful not to damage existing wiring or panels. Do not position base stations in ducts, plenums, or hollow spaces used to transport environmental air except where the duct, plenum or hollow space is created by a suspended ceiling having lay-in panels or tiles. If more than one Companion base station is required in one cell to meet traffic demands, position all the base stations at the same cell center, as follows: USA: a minimum of 54 in. and a maximim of 9 ft. 9 in. apart from the center of one base station to the center of the next Canada: a minimum of 9 cm and a maximim of 1.5 m apart from edge to edge Never mount base stations in rows.
Installation / 31 P0992639 01 Modular ICS Companion Installer Guide Position base stations away from an office area or where a portable is used by at least the amounts shown in the following table. Installing the base station on the ceiling or high on walls helps to maintain these minimum distances. Minimum distance between office areas and base stations Mounting a base station Base stations can be mounted on a wall or on a ceiling. When mounting on a wall, install them with their covers at the bottom, as shown in the following illustrations. Allow for clearances around the base station as indicated in the following illustration. Clearance for the base stations Number of base stations in the cellMinimum distance between office areas and base stations 11 m (40 in.) 2 1.4 m (56 in.) 3 1.8 m (72 in.) 42 m (80 in.) Clearance conditions Canada USA Clearance from all other objects 9 cm 3.5 in. Vertical clearance from base station center to base station center 27 cm 54 in. Horizontal clearance from base station center to base station center 41 cm 54 in.
32 / Installation Modular ICS Companion Installer Guide P0992639 01 To mount a base station: 1. Fasten the bracket into position using two #8 38-mm (1½-in.) screws. 2. Route the cable from the ICS through the top (or bottom) opening. 3. Wind any excess cable around the posts to secure it, then fasten it under the strain relief. 4. Connect the wires to the BIX connector on the bracket termination board as shown in the following illustration. The polarity of the TCM connections is not important. If two power pairs are brought in, they must be connected with the same polarity to the base station bracket termination board. Bracket termination board Ensure that the RPI is off before connecting power pairs to the base station. -PWR(1)TCM +PWR(1) +PWR(2) -PWR(2) TCM RJ11 jackRJ11 jack TCM -Power 1 -Power 2 TCM +Power 1 +Power 2
Installation / 33 P0992639 01 Modular ICS Companion Installer Guide 5. Mount the base station onto the bracket, snapping it into position. 6. Connect the power RJ11 jumper lead to the RJ11 jacks on the termination board and the base station. 7. For plug-top power supplies only, connect the power supply connector to the base station power connector. Make sure the base station is powered by a class 2 plug-top power source only. 8. Record the associated ICS port number in the space provided on the printed label affixed on the lower right corner of the mounting bracket. Include the labeling information for each Companion base station on the completed installation floor plans. 9. Slide the cover onto the bracket, using the guide to position it properly. Snap it into place. Inserting the power supply connector in the wrong direction may damage the plug-top power supply and the base stations. Position the power supply connector in the proper direction and push it into place securely.
34 / Installation Modular ICS Companion Installer Guide P0992639 01 Sliding cover onto bracket Installing portable telephones To use Norstar Companion portables, you must first install radio base stations to transceive radio signals to and from the portable telephones, then bring the system on-line. Installing base stations on page 30 Companion Portable Telephones are installed differently than traditional desk sets. There are no direct connections between the portables and the Norstar system. Do the following: Install the batteries and battery charging units for each portable, using the instructions that come with the portable. Register each Companion portable for use with the Norstar system. For complete instructions, see the Registration information beginning on page 73.