    							1. Installing the
    Cabinet
    1-9
    Hanging the Cabinet(Figures 1-6 and 1-7)
    1. Hang the Main Equipment Cabinet on the wall mount hang-
    er as shown:
    
    See Figure 1-6 when hanging a 4 slot cabinet.
    
    See Figure 1-7 when hanging an 8 slot cabinet.
    2. Using the remaining screws that were packed with the hang-
    er, secure the cabinet to the plywood backboard.
    Figure 1-6  HANGING THE 4 SLOT CABINET
    80000 - 13
    INSTALLING THE CABINET 
    						
    							1-10
    INSTALLING THE CABINETFigure 1-7  HANGING THE 8 SLOT CABINET
    80000 - 60 
    						
    							1. Installing the
    Cabinet
    1-11
    GROUNDING THE CABINET
    Removing the Right Side Panel (Figure 1-8)
    Remove the cabinet right side panel to gain easy access to the
    ground lugs and system cabling. The cabinet has two ground
    connections: ETH (Earth Ground) and PBXG (PBX Ground).
    1. Remove the two screws that secure the right side panel to
    the cabinet.
    2. Carefully slide the right side panel down until it swings clear
    of the cabinet.
    Figure 1-8  REMOVING THE SIDE PANELS
    80000 - 16
    4 Slot Cabinet
    Shown 
    						
    							1-12
    GROUNDING THE CABINET
    — For Your Notes — 
    						
    							1. Installing the
    Cabinet
    1-13
    GROUNDING THE CABINET
    Attaching the Ground Wires (Figure 1-9)
    The system provides two ground terminations. Each ground
    connects from the system to the ground termination using 12
    AWG stranded copper wire (see Figure 1-9).
    Use the ETH (Earth Ground) for safety/system ground. You
    mustconnect ETH to a known earth ground.
    
    Use the PBXG (PBX Ground) if you have trunks that require
    telco ground (such as ground start trunks). This ground is not
    required for loop start trunks.
    1. Remove the lug on the ground connection you want to connect.
    2. Follow Figure 1-10 and run the ground wire(s) through the
    RFI Suppressor Assembly as shown.
    3.For Ear
    th Gr
    ound:
    Run a ground wire from the ETH lug to a known earth ground.
    For PBX Gr
    ound:
    Run a ground wire from the PBXG lug to the telco ground.
    4. Crimp ring terminals as required to the ground wires.
    5. Reinstall and firmly tighten the lug(s) removed in step 1 above. 
    Do not plug in the power cord or reinstall the right sidepanel until all PCB installation and cabling are complete.
    Figure 1-9  ATTACHING THE GROUND WIRES
    80000 - 17
    To earth ground
    To telco ground
    4 Slot Cabinet
    Shown 
    						
    							1-14
    RFI SUPPRESSOR ASSEMBLIES
    Installing RFI Suppressor Assemblies (Figure 1-10)
    You must install RFI Suppressor Assemblies as follows. The
    suppressors mustbe mounted inside the cabinet and as close to
    the appropriate PCB as possible.
    For Station and Trunk Cables— Only install these assemblies if you are installing non-A
    station and trunk PCBs in a 4 slot cabinet. If you have a
    mixture of A and non-A PCBs, you only need to install
    the assemblies on the non-A PCBs.
    — RFI assemblies on station and trunk cables are not
    required with 8 slot cabinets, since these cabinets use only
    APCBs.
    
    For Ground Wires— You must install a separate RFI assembly for the ground
    wire(s) in all systems.
    — If your system has 2 ground wires, install them both in
    the same assembly.
    
    For CPU Connections— You must install a separate RFI assembly for the CPU
    mod jack and RS-232 cables in all systems. Install both
    cables in the same assembly.
    ow!!he
    RS-
    f-
    onal
    able.
    s
    g.,
    nly
    0021. 
    						
    							1. Installing the
    Cabinet
    1-15
    RFI SUPPRESSOR ASSEMBLIES
    80000 - 67
    Figure 1-10  INSTALLING RFI SUPPRESSOR ASSEMBLIES For Station and Trunk Cables
    
    Required only when using non-A
    sta-
    tion and trunk PCBs in 4 slot cabinets:
    —16DSTU PCB P/N 80021
    —8ASTU PCB P/N 80041
    —4ASTU PCB P/N 80040
    —4ATRU PCB P/N 80010
    —8ATRU PCB P/N 80011
    
    Not required for 8 slot cabinets. All 8
    slot cabinets must use A
    station and
    trunk PCBs.For CPU Connections
    
    Required on CPU mod jack and
    RS-232 cables for all installations. For Ground Wire(s)
    
    Required for all installations. 
    						
    							1-16
    POWER SUPPLY INSTALLATION
    Installing the Power Supply (Figures 1-11 and 1-12)
    The power supply provides the
    DC power sources required to
    operate the system:
    1. Slide the power supply into the
    CN101 slot as shown at right.
    2. Using a long-shaft phillips
    head screwdriver, tighten the
    two screws that secure the
    power supply.
    An 8 slot cabinet may require up
    to 3 power supplies, using slots
    CN101, CN102 and CN103.
    Refer to System Configuration
    on page 1-17 for more.
    Figure 1-11  POWER SUPPLYFigure 1-12  Installing the Power Supply
    80000 - 29
    4 Slot Cabinet
    Shown 
    						
    							1. Installing the
    Cabinet
    1-17
    SYSTEM CONFIGURATION - U SLOT
    U Slot Configuration Guidelines
    U Slot systems use software version 02.**.** or higher.
    The total number of components you can install and connect
    depends on power supply capacity and the System Load Factor.
    Review the Configuration Guidelines at right and System Load
    Factor Calculationson page 1-18 when configuring your sys-
    tem. Also  read U Slot Default Settingson page 1-19. You may
    find that the default setup is adequate for your needs.
    Also see Where to Install the PCBs in your U Slot Systemon
    page 2-2.
    Notes for U Slot Software
    
    U Slot (02.nn.nn) software is available with both 4 and 8 slot cabinets.
    4 Slot Cabinets
    
    Do not install more than 2 16DSTU PCBs installed under any circumstances.
    
    The  rst 16DSTU PCB you install must be in the  rst slot.
    
    You can install up to 
    40 extensions
     maximum, as follows:
    (2) 16DSTU PCBs = 32 digital extensions
    (1) 8ASTU PCB = 8 analog extensions
    Total = 40 extensions
    
    You can install up to 
    24 trunks
     maximum, as follows:
    (3) 8ASTU PCBs = 24 analog trunks
    
    Maximum con guration is 
    48 ports
    .
    
    The total of all extensions and trunks cannot exceed 
    48.
    
    Always use the System Load Factor Table to check you system con guration.
    8 Slot Cabinets
    
    Do not install more than 2 16DSTU PCBs for each power supply.
    
    The  rst 16DSTU PCB you install must be in the  rst slot (CN1).
    
    You can install up to 
    96 extensions
     maximum.
    
    You can install up to 
    48 trunks
     maximum.
    
    The total of all extensions and trunks installed cannot exceed 
    104
    .
    
    Maximum con guration is 
    104 ports
    .
    
    8-slot cabinet require, A series PCBs, as follows:
    CPU PCB P/N 80025A
    Power Supply P/N 80005A16DSTU Digital Station PCB P/N 80021A8 ASTU 8 Port Analog Station PCB P/N 80041A4ASTU 4 Port Analog Station PCB P/N 80040A8ATRU 8 Port Analog Trunk PCB P/N 80011A4ATRU 4 Port Analog Trunk PCB P/N 80010A
    
    Always use the System Load Factor Table to check your system con guration. 
    						
    							1-18
    System Load Factor Calculations
    To check your system configuration:
    1. In the table at right, indicate the quantity for each item
    installed in the 
    Qty
    column.
    2. For each item, multiply the 
    Qty
    times the Load Factor and
    enter the value in the 
    Total Load
    column.
    3. Add all the values in the 
    Total Load
    column and enter the
    value in 
    Item 1
    .
    4. Determine the System Load Factor capacity of the power
    supplies installed in your system and enter the total in 
    Item 2
    .
    A 4-slot cabinet can have only 1 power supply. An 8-
    slot cabinet can have up to 3 power supplies. You can-
    not have more than two 16DSTU PCBs per power sup-
    ply, regardless of System Load Factor calculations.
    Exceeding the System Load Factor will cause the sys-
    tem’s power supplies to automatically shut down.
    5. Compare the entry in 
    Item 2
    to your entry in 
    Item 1
    . Item 1
    must always be equal to or less than the entry in 
    Item 2
    .
    Do not operate your system if the System Load Factortotal (
    Item 1
    ) exceeds the allowable value (
    Item 2
    ).
    SYSTEM CONFIGURATION - U SLOT
    System Load Factor Calculations
    Description Load Factor Qty Total Load
    16DSTU PCB 16
    4ASTU PCB 8
    8ASTU PCB 12
    110-Button DSS Console 2
    24-Button DSS Console 1
    Total DSS Consoles installed cannot exceed 4.
    2-OPX Module 3
    Item 1: 
    Total load for this con guration:
    Item 2:
     If you have one
     power supply installed, enter 48.
    If you have two power supplies installed, enter 80.
    If you have three power supplies installed, enter 112.
    (2 16DSTU PCBs maximum per power supply)
    Note: An 8-Slot Cabinet can have up to 3 power supplies. You cannot
     have more than 
    two 16DSTU PCBs per power supply, regardless of System Load Factor calculations. 
    						