Home > Namco > Games > Namco World Kicks Operators Manual

Namco World Kicks Operators Manual

Here you can view all the pages of manual Namco World Kicks Operators Manual. The Namco manuals for Games are available online for free. You can easily download all the documents as PDF.

Page 51

Page 51 (d) How to I/F Initialize.  When selected the following screen is displayed.
I/O TEST
LINK : OFF
I/F INITIALIZE : ANOTHER WAY
HOLDING SERVICE SW
AND PUSH TEST SW
GO TO [I/F INITIALIZE] ............................ (1)
EXIT
SELECT SW :CHOOSE ENTER SW : ENTER
(1) When selected and the Enter button is pressed the following screen is displayed.
I/F INITIALIZE
KEEP STICKS CENTRE POSITION
AND PRESS SERVICE SW
GO TO [SWITCH TEST] ............................ (2)
SELECT SW :CHOOSE ENTER SW : ENTER
Note:...

Page 52

Page 52 (e) Switch Test When Switch Test is selected and entered from the I/F Initaialize
screen the following screen is displayed.
I/O TEST
LINK : OFF
SWITCH TEST [ON : RED]
COIN 0 (1)
SERVICE OFF (2)
TEST OFF (3)
SELECT (UP/DOWN) OFF/OFF (4)
ENTER OFF (5)
STICK
   (L / R) 8765 7765 6765 5765 (7)
   (U / D) 8765 7765 6765 5765 (8)
BUTTON OFF OFF OFF OFF (9)
   KICK 0000 0000 0000 0000 (10)
 (FRONT / BACK) OFF/OFF OFF/OFF OFF/OFF OFF/OFF (11)
(12)
UP SELECT SW  +  ENTER SW  :  EXIT
(6)
The SWITCH TEST...

Page 53

Page 53 6-2-4 Monitor Test
1. Select “MONITOR TEST” on the menu screen to test and adjust the
Monitor. The following screen is displayed.
2. Use the Select Up/Down switch to choose the required item then press the
Enter button. To return to the Monitor Test Menu from a test pattern press
the Enter button.
3. Select “EXIT” and press the Enter button to return to the menu screen.
MONITOR TEST
GRADATION PATTERN ................................................ (a)
CROSSHATCH PATTERN (CRT)...

Page 54

Page 54 6-2-5 Sound Test
1. Select “SOUND TEST” on the menu screen to adjust the volume and test
the sound. The following screen is displayed.
2. Use the Select Up/Down switch to choose the required item then press the
Enter button.
3. Use the Select Up/Down switch to change the selected item settings
Note: Item (d) only. To select the digit to be adjusted press the Enter button.
4. Press the Enter button after the setting changes have been made to return
to option select
5. Select “EXIT” and press the...

Page 55

Page 55 MONITOR TEST
ROM Ver - - - - / - - - - / - -  - - - - - : - - : - - ....................... (a)
CLOCK - - - - / - - - - / - -  - - - - - : - - : - - ....................... (b)
S / N 123456 - 123456 ........................................ (c)
LANGUAGE ENG............................................... (d)
PAUSE OFF............................................... (e)
NAOMI TEST MODE............................................................. (f)
BACKUP MEMORY...

Page 56

Page 56
7. INITIALIZATION
Adjustments when Replacing Parts 
The following operation 
must always be performed after replacing the NAOMI Game
PCB, Joystick Potentiometers or initializing the backup data.. 
The game will not operate correctly if these adjustments are not made. 
1. Slide the TEST switch ON while pressing and holding the SERVICE switch. The following screen is displayed.
I/F INITIALIZE
KEEP STICKS CENTRE POSITION AND PRESS SERVICE SW
GO TO [SWITCH TEST] ............................ (a)...

Page 57

Page 57
8. MAINTENANCE
  
Adjustment or maintenance on this machine should be carried out by
qualified personnel only.
Ensure that the 
POWER to the machine is turned OFF before commencing
any maintenance work. (Trouble shooting, service or repairs etc.)
  
Einstellungen und Wartung des Gerätes dürfen nur von dafür qualifiziertem
Fachpersonal vorgenommen werden.
Vor Beginn aller Wartungsarbeiten (Fehlersuche, Reparaturen etc.) muß der
Netzstecker gezogen werden.
  
Justeringer eller...

Page 58

Page 58
  
Aanpassingen of onderhoud aan deze machine dient alleen uitgevoerd te
worden door bekwaam personeel.
Zorg ervoor dat de machine UITgeschakeld is voordat er enig
onderhoudswerk wordt verricht (troubleshooting, reparaties etc.)
  
Afinações ou manutenção nesta maquina, deverão ser efectuadas sómente
por pessoal qualificado.
Certifique-se que a maquina se encontra desligada sempre que iniciar
qualquer tipo de trabalho de manutenção. (identifação de avarias,
reparação etc.)...

Page 59

Page 59 8-1 Replacing the Ball Assy
1. Remove 4off hex head screw (M8x40), with flat and spring washer, and remove
the Ball Assy and Ball Mounting Wood.
2. Replace the Ball Assy, ensuring that the Ball Mounting Wood is refitted.
Note: The holes in the ball, ball mounting wood and kicker assy are not equally
spaced. Ensure that all holes line-up before fitting any screws.
Ball mounting wood Ball Assy
Kicker Assy
Hex head screw (M8x40)
with spring washer (M8)
and flat washer (M8) NOTE
Mounting holes are...

Page 60

Page 60
Whizz nut(M10)
Fixing bracket
8-2 Replacing the Kicker Assy
1.  Seperate the Kicker Cabinet from the Monitor Cabinet.  (see 5-2 page 39)
2.   Remove the Ball  Ass y.  (See 8-1  page 59)
3. Remove 2off whizz nuts (M10) and remove the rear Fixing Bracket. 
Start reading Namco World Kicks Operators Manual

Related Manuals for Namco World Kicks Operators Manual

All Namco manuals