Home > Lucent Technologies > Communications System > Lucent Technologies Definity Release 8.2 Atm Installation Manual

Lucent Technologies Definity Release 8.2 Atm Installation Manual

Here you can view all the pages of manual Lucent Technologies Definity Release 8.2 Atm Installation Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.

Page 21

DEFINITY ECS Release 8.2 ATM Installation,
Upgrades, and Administration  555-233-124  Issue 1
April 2000
Preparing for Installation and Upgrades 
1-3 Review Configuration and Equipment 
1
Review Configuration and Equipment
Figure 1-1 shows and  examp le of the b asic  ATM c onnec tions for Release 8r and  
Release 8c si system using  ATM-PNC and  ATM-CES. For more d etailed  
c onnec tion d iag rams of the reliab ility op tions, refer to ‘‘DEFINITY ECS 
configurations’’ on page 1-6.
Figure Notes
Figure...

Page 22

DEFINITY ECS Release 8.2 ATM Installation,
Upgrades, and Administration  555-233-124  Issue 1
April 2000
Preparing for Installation and Upgrades 
1-4 Review Configuration and Equipment 
1
Required Hardware
Table 1-1 lists the req uired  eq uip ment for stand ard , high, c ritic al reliab ility, and  
ATM network d up lic ation c onfig urations.
To test the sync hronization sp litters, you need  the following  eq uip ment:
nPhoenix 1541C Test Set with ac c essory c ord kit
nPhoenix 5575A T1 Test Set with...

Page 23

DEFINITY ECS Release 8.2 ATM Installation,
Upgrades, and Administration  555-233-124  Issue 1
April 2000
Preparing for Installation and Upgrades 
1-5 Review Configuration and Equipment 
1
nRJ45-to-Bantam test c ab le from the 1541CC c ab le kit
nSystem capacities
Table 1-2
 lists the maximum numb er of TN2305/TN2306 c irc uit p ac ks allowed  in 
a DEFINITY ECS.
Table 1-2. Maximum number of ATM interface TN2305/TN2306 circuit packs
PlatformMaximum ATM circuit 
packs allowed Description
r 176 2 x 44 port...

Page 24

DEFINITY ECS Release 8.2 ATM Installation,
Upgrades, and Administration  555-233-124  Issue 1
April 2000
Preparing for Installation and Upgrades 
1-6 Review Configuration and Equipment 
1
DEFINITY ECS configurations
Figure 1-2, Figure 1-3, and  Figure 1-4 show the ATM-PNC c onnec tions for 
stand ard , hig h, and  c ritic al reliab ility, resp ec tively.
Figure 1-2. ATM-PNC connections for standard
 reliability Figure Notes
1. Pub lic  switc hed telep hone network (PSTN)
2. Main d istrib ution frame...

Page 25

DEFINITY ECS Release 8.2 ATM Installation,
Upgrades, and Administration  555-233-124  Issue 1
April 2000
Preparing for Installation and Upgrades 
1-7 Review Configuration and Equipment 
1
Figure 1-3. ATM-PNC connections for high reliability Figure Notes
1. Pub lic  switc hed telep hone network (PSTN)
2. Main d istrib ution frame (MDF) or smart jac k
3. Sync hronization splitter
4. DS1 c irc uit p ac k (TN464F)
5. TN2305/TN2306 c irc uit pac ks
6. DEFINITY ECS ac c ess terminal
7. Timing  signal from sync...

Page 26

DEFINITY ECS Release 8.2 ATM Installation,
Upgrades, and Administration  555-233-124  Issue 1
April 2000
Preparing for Installation and Upgrades 
1-8 Review Configuration and Equipment 
1
Figure 1-4. ATM-PNC connections for critical
 reliability or ATM network 
duplication Figure Notes
1. Pub lic  switc hed telep hone network (PSTN)
2. Main d istrib ution frame (MDF) or smart jac k
3. Sync hronization splitter
4. DS1 c irc uit p ac k (TN464F)
5. TN2305/TN2306 c irc uit pac ks
6. DEFINITY ECS ac c ess...

Page 27

DEFINITY ECS Release 8.2 ATM Installation,
Upgrades, and Administration  555-233-124  Issue 1
April 2000
Preparing for Installation and Upgrades 
1-9 Determine ATM Switch Suitability 
1
Determine ATM Switch Suitability
To fully sup p ort DEFINITY ATM-PNC and provid e nonb loc king  ATM ac c ess 
b etween all p ort networks, ATM switc hes must supp ort at least 400 
p oint-to-multip oint switc hed  virtual c onnec tion (SVC) roots or leaves p er 
OC-3/STM-1 interfac e. Bec ause d ifferent switc hes have d...

Page 28

DEFINITY ECS Release 8.2 ATM Installation,
Upgrades, and Administration  555-233-124  Issue 1
April 2000
Preparing for Installation and Upgrades 
1-10 Determine ATM Switch Suitability 
1
Figure 1-3 shows an example of a calculation.
PROBABLY
 means that this application is okay under any reasonable loads. 
Check the constraint tests results to see what kind of loads might be a problem.
YES means that this application is okay under any load.
NO
 means that this ap p lic ation is not reasonab le. See the...

Page 29

DEFINITY ECS Release 8.2 ATM Installation,
Upgrades, and Administration  555-233-124  Issue 1
April 2000
Preparing for Installation and Upgrades 
1-11 Determine ATM Switch Suitability 
1
UNKNOWN
 means that sp ec ial eng ineering  is req uired  for this ap p lic ation 
b ec ause of the transit traffic . The sp ec ial treatment is nec essary b ec ause the 
feasib ility d ep end s on the volume of the transit traffic . Making  any of the c hang es 
sug g ested  for NO
 ab ove mig ht make it feasib le reg...

Page 30

DEFINITY ECS Release 8.2 ATM Installation,
Upgrades, and Administration  555-233-124  Issue 1
April 2000
Preparing for Installation and Upgrades 
1-12 Determine ATM Switch Suitability 
1
Final notes
The g oal is to engineer the network so that in all reasonab le app lic ations, you 
always run out of DEFINITY time slots before running  out of ATM switc h 
resourc es. This is req uired  to p rovid e ac c ep table servic e to the c ustomer. 
These calculations factor in phone calls only. There is no...
Start reading Lucent Technologies Definity Release 8.2 Atm Installation Manual

Related Manuals for Lucent Technologies Definity Release 8.2 Atm Installation Manual

All Lucent Technologies manuals