Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies Definity Release 8.2 Atm Installation Manual
Lucent Technologies Definity Release 8.2 Atm Installation Manual
Here you can view all the pages of manual Lucent Technologies Definity Release 8.2 Atm Installation Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 21
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Preparing for Installation and Upgrades 1-3 Review Configuration and Equipment 1 Review Configuration and Equipment Figure 1-1 shows and examp le of the b asic ATM c onnec tions for Release 8r and Release 8c si system using ATM-PNC and ATM-CES. For more d etailed c onnec tion d iag rams of the reliab ility op tions, refer to ‘‘DEFINITY ECS configurations’’ on page 1-6. Figure Notes Figure...
Page 22
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Preparing for Installation and Upgrades 1-4 Review Configuration and Equipment 1 Required Hardware Table 1-1 lists the req uired eq uip ment for stand ard , high, c ritic al reliab ility, and ATM network d up lic ation c onfig urations. To test the sync hronization sp litters, you need the following eq uip ment: nPhoenix 1541C Test Set with ac c essory c ord kit nPhoenix 5575A T1 Test Set with...
Page 23
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Preparing for Installation and Upgrades 1-5 Review Configuration and Equipment 1 nRJ45-to-Bantam test c ab le from the 1541CC c ab le kit nSystem capacities Table 1-2 lists the maximum numb er of TN2305/TN2306 c irc uit p ac ks allowed in a DEFINITY ECS. Table 1-2. Maximum number of ATM interface TN2305/TN2306 circuit packs PlatformMaximum ATM circuit packs allowed Description r 176 2 x 44 port...
Page 24
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Preparing for Installation and Upgrades 1-6 Review Configuration and Equipment 1 DEFINITY ECS configurations Figure 1-2, Figure 1-3, and Figure 1-4 show the ATM-PNC c onnec tions for stand ard , hig h, and c ritic al reliab ility, resp ec tively. Figure 1-2. ATM-PNC connections for standard reliability Figure Notes 1. Pub lic switc hed telep hone network (PSTN) 2. Main d istrib ution frame...
Page 25
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Preparing for Installation and Upgrades 1-7 Review Configuration and Equipment 1 Figure 1-3. ATM-PNC connections for high reliability Figure Notes 1. Pub lic switc hed telep hone network (PSTN) 2. Main d istrib ution frame (MDF) or smart jac k 3. Sync hronization splitter 4. DS1 c irc uit p ac k (TN464F) 5. TN2305/TN2306 c irc uit pac ks 6. DEFINITY ECS ac c ess terminal 7. Timing signal from sync...
Page 26
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Preparing for Installation and Upgrades 1-8 Review Configuration and Equipment 1 Figure 1-4. ATM-PNC connections for critical reliability or ATM network duplication Figure Notes 1. Pub lic switc hed telep hone network (PSTN) 2. Main d istrib ution frame (MDF) or smart jac k 3. Sync hronization splitter 4. DS1 c irc uit p ac k (TN464F) 5. TN2305/TN2306 c irc uit pac ks 6. DEFINITY ECS ac c ess...
Page 27
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Preparing for Installation and Upgrades 1-9 Determine ATM Switch Suitability 1 Determine ATM Switch Suitability To fully sup p ort DEFINITY ATM-PNC and provid e nonb loc king ATM ac c ess b etween all p ort networks, ATM switc hes must supp ort at least 400 p oint-to-multip oint switc hed virtual c onnec tion (SVC) roots or leaves p er OC-3/STM-1 interfac e. Bec ause d ifferent switc hes have d...
Page 28
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Preparing for Installation and Upgrades 1-10 Determine ATM Switch Suitability 1 Figure 1-3 shows an example of a calculation. PROBABLY means that this application is okay under any reasonable loads. Check the constraint tests results to see what kind of loads might be a problem. YES means that this application is okay under any load. NO means that this ap p lic ation is not reasonab le. See the...
Page 29
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Preparing for Installation and Upgrades 1-11 Determine ATM Switch Suitability 1 UNKNOWN means that sp ec ial eng ineering is req uired for this ap p lic ation b ec ause of the transit traffic . The sp ec ial treatment is nec essary b ec ause the feasib ility d ep end s on the volume of the transit traffic . Making any of the c hang es sug g ested for NO ab ove mig ht make it feasib le reg...
Page 30
DEFINITY ECS Release 8.2 ATM Installation, Upgrades, and Administration 555-233-124 Issue 1 April 2000 Preparing for Installation and Upgrades 1-12 Determine ATM Switch Suitability 1 Final notes The g oal is to engineer the network so that in all reasonab le app lic ations, you always run out of DEFINITY time slots before running out of ATM switc h resourc es. This is req uired to p rovid e ac c ep table servic e to the c ustomer. These calculations factor in phone calls only. There is no...