Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Administration For Network Connectivity Instructions Manual
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Administration For Network Connectivity Instructions Manual
Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Administration For Network Connectivity Instructions Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 81
Configuration 1: R8r R8si 61 Administration for Network Connectivity 555-233-504— Issue 1 — April 2000 CID: 77730 3 C-LAN Administration Prerequisite Administration There are some system administration tasks that need to be completed before you can proceed with the connectivity administration described in this section. Review the checklist of prerequisite administration tasks in Checklist for Prerequisite Administration (page 54), before proceeding with the connectivity administration in this...
Page 82
Configuration 1: R8r R8si 3 C-LAN Administration Administration for Network Connectivity CID: 77730 555-233-504 — Issue 1 — April 2000 62 Switch 1 Task — Assign Node Names This task assigns node names and IP addresses to each node in the network. This screen is administered on Switch 1. A Node Names screen must be administered on each switch in the network. The node names and IP addresses in any network should be assigned in a logical and consistent manner from the point of view of the whole...
Page 83
Configuration 1: R8r R8si 63 Administration for Network Connectivity 555-233-504— Issue 1 — April 2000 CID: 77730 3 C-LAN Administration Switch 1 Task — Assign Link via ppp Data Module to Switch 2 This task administers a ppp data module on Switch 1 for the ppp connection to Switch 2. The data module defines a network interface — it associates a link number with a port address and node name for the C-LAN port on Switch 1. It also specifies the node name for the destination node, which is a C-LAN...
Page 84
Configuration 1: R8r R8si 3 C-LAN Administration Administration for Network Connectivity CID: 77730 555-233-504 — Issue 1 — April 2000 64 > Submit the screen End COS The values for these fields will be specified by the system administrator. COR: TN: BCC: Bearer Capability Class. This is a display-only field. Node Name: The node name for the interface (C-LAN port) defined by this data module. This must be a name previously entered on the Node Names screen. Subnet Mask: Establish Connection?y means...
Page 85
Configuration 1: R8r R8si 65 Administration for Network Connectivity 555-233-504— Issue 1 — April 2000 CID: 77730 3 C-LAN Administration Switch 1 Task — Assign Processor Channels This task associates data links (hardware) with processor channels (software) on Switch 1 and specifies the destination node and machine ID. Begin Steps > Open the Processor Channel Assignment form — enter ch com p > Enter values for processor channel 12 change communications-interface processor-channels...
Page 86
Configuration 1: R8r R8si 3 C-LAN Administration Administration for Network Connectivity CID: 77730 555-233-504 — Issue 1 — April 2000 66 >Submit the screen End Destination Node Name of the far-end node for this channel. This must be a name entered on the Node Names screen. For ppp connections, it must match the Destination Node Name entered on the ppp Data Module screen. Destination Port A value of 0 allows any available interface channel on the destination node to be used for this connection. The...
Page 87
Configuration 1: R8r R8si 67 Administration for Network Connectivity 555-233-504— Issue 1 — April 2000 CID: 77730 3 C-LAN Administration Switch 2 Task — Assign Node Names This task assigns node names and IP addresses to each node in the network. This screen is administered on Switch 2. A Node Names screen must be administered on each switch in the network. The node names and IP addresses in any network should be assigned in a logical and consistent manner from the point of view of the whole...
Page 88
Configuration 1: R8r R8si 3 C-LAN Administration Administration for Network Connectivity CID: 77730 555-233-504 — Issue 1 — April 2000 68 Switch 2 Task — Assign Link via ppp Data Module to Switch 1 This task administers a ppp data module on Switch 2 for the ppp connection to Switch 1. The data module defines a network interface — it associates a link number with a port address and node name for the C-LAN port on Switch 2. It also specifies the node name for the destination node, which is a C-LAN...
Page 89
Configuration 1: R8r R8si 69 Administration for Network Connectivity 555-233-504— Issue 1 — April 2000 CID: 77730 3 C-LAN Administration >Press the ENTER/SAVE key to save and exit End COS The values for these fields will be specified by the system administrator. COR: TN: BCC: This is a display-only field. Node Name: The node name for the interface (C-LAN port) defined by this data module. This must be a name entered on the Node Names screen. Subnet Mask: Establish Connection?n means that the...
Page 90
Configuration 1: R8r R8si 3 C-LAN Administration Administration for Network Connectivity CID: 77730 555-233-504 — Issue 1 — April 2000 70 Switch 2 Task — Assign Processor Channels This task associates data links (hardware) with processor channels (software) on Switch 2. Begin Steps > Open the Processor Channel Assignment form — enter ch com p > Enter values change communications-interface processor-channels Page 1 of X PROCESSOR...