Home > Inter-Tel > Communications System > Inter-Tel Glx Plus Issue 2 Installation And Field Maintenance Manual

Inter-Tel Glx Plus Issue 2 Installation And Field Maintenance Manual

Here you can view all the pages of manual Inter-Tel Glx Plus Issue 2 Installation And Field Maintenance Manual. The Inter-Tel manuals for Communications System are available online for free. You can easily download all the documents as PDF.

Page 41

INTER-TEL PRACTICES 
GLX-PLUS INSTALLATION % MAINTENANCE INSTALLATION Issue 2, June 1993 
FIGURE 3-5. 
CO LINE TERMINATIONS FROM RJ14 JACKS 
TO C.O. 
‘zLIN~SO~ 
PER JACK) 
2-PAIR 
MOD-TO-MOD 
LINE CORDS P-PAIR 
CABLES 
MDF 
BACK- 
BOARD 
_ 2-PAIR MOD-TO-MOD 
LINE CORDS -KSU 
FIGURE 3-6. MODULAR JACK ASSEMBLY WIRING FOR CO LINES 
TIP 1 TIP 2 
RING 1 RING 
2 
Page 3-13  

Page 42

JNSTALLATJON INTER-TEL PRACTICES 
Issue 2. June 1993 GLX-PLUS INSTALLATION & MAINTENANCE 
C. CO LINES TERMINATED ON AN RJ21X 
BLOCK 
5.5 Before using this procedure, read the 
IMPOR- 
ZWT NOTES following paragraph 5.2 on page 3-12. 
Also, refer to Figure 3-7 below for a diagram of the 
complete layout. 
(1) 
(2) 
(3) 
Mount a CO (66Ml-50-type) connecting block 
on the MDF backboard. 
For every two CO lines, mount a four-conductor 
modular jack assembly on the MDF backboard 
near the KSU. The modular jack...

Page 43

INTER-TEL PRACTICES 
GLX-PLUS INSTALLATION & MAINTENANCE INSTALLATION 
Issue 2, June 1993 
6. KSU INSTALLATION 
A. UNPACK AND INSPECT THE KSU 
(1) Unpack the KSU and lay it on a flat surface with 
the cover facing up. Open it by removing the four 
retaining screws and lifting off the cover. 
CAUTION 
The PCBs contain static-sensitive components 
Lift them only by the edges and carefully handle 
the components while inspecting them in the next 
step. 
(2) Inspect the fuses for the correct voltage and cur-...

Page 44

INSTALLATION 
Issue 2. June 1993 INTER-TEL PRACTICES 
GLX-PLUS INSTALLATION & MAINTENANCE 
NOTE: If you are adding the Expansion PCB after the 
system has been installed, turn off the KSU AC power 
switch (PWR), unplug the KSU AC power cord, and un- 
plug the 25pair station cable and C1) line cords from the 
KSU. Remove the KSU from the wall and open it 
according to the instructions in section A. 
(1) 
(2) 
(3) Remove the six retaining screws (eight in some 
KSUs) holding the Main Control PCB to the...

Page 45

INTER-TEL PRACTICES 
GLX-PLUS INSTALLATION & MAINTENANCE INSTALLATION 
Issue 2, June 1993 
FIGURE 3-9. INSTALL THE EXPANSION PCB 
c -- @iv’ 
EXPANSION PCS 
FIGURE 3-10. INSTALL THE APM 
MAIN CONTROL PCB 
Page 3-17  

Page 46

INSTALLATION 
Issue 2, June 1993 INTER-TEL PRACTICES 
GLX-PLUS INSTALLATION & MAINTENANCE 
D. MOUNT THE KSU 
(3) Drive a #KS pan-head screw into the center of each 
marking, allowing the head of the screw to pro- 
(1) Refer to Figure 3-11 below. On a large sheet of trude y4- to J$inch (0.6 to 1.2 centimeters). 
paper, trace the outline of the back of the KSU 
and the two mounting screw holes. (4) Hang the KSU on the screws. Adjust the screws if 
necessary to ensure that the KSU is securely 
(2) Transfer...

Page 47

INTER-TEL PRACTICES 
GLX-PLUS INSTALLATJON & MAINTENANCE INSTALIATION 
Issue,2, June 1993 
Grounding Requirements 
6.3 The KSU must be properly grounded to an earth 
ground point. A copper, cold water pipe is usually a 
good ground point 
NOTE: According to UL 1459, “an insulated grounding 
conductor that is not smaller in size and equivalent in in- 
sulation material and thickness to the grounded and un- 
grounded branch-circuit supply conductors, except that 
it is green with or without one or more...

Page 48

INSTALLATION INTER-TEL PRACTICES 
Issue 2, June 1993 
GLX-PLUS INSTALLATION & MAINTENANCE 
6.7 If the KSU and telco protector are separated by 
more than 30 feet or if the telco protector ground is inac- 
cessible, additional protection for the C.O. line pairs is 
recommended. Use a Cook gas protector (part number 
502Al-2-LCGX for 2-line, 502Al-4-LCGX for 
4-line, 502Al-6-LCGX for 6-line) or equivalent and 
connect a 1OAWG wire between the KSU grounding lug and the Cook protector’s grounding lug as...

Page 49

INTER-TEL PRACTICES 
GLX-PLUS INSTALLATION 8z MAINTENANCE INSTALLATION 
Issue 2, June 1993 
E. COMPLETE ALL CONNECTIONS FOR 
THE KSU 
(1) To complete the station connections (from the 
station connecting block to the KSU), attach the 
station female amphenol-type connector to the (3) 
male connector on the left side of the KSU. 
(2) To complete the CO line connections (from the 
CO modular jacks mounted next to the KSU), 
plug each mod-to-mod CO line cord into the cor- 
(4) 
responding CO jack on the...

Page 50

INSTALLATION 
Issue 2, June 1993 INTER-TEL PRACTICES 
GLX-PLUS INSTALLATION & MAINTENANCE 
7. STATION INSTALLATION 
A. KEYSET INSTALLATION 
7.1 Before installing keysets, unpack each one and 
check for damage. If items are damaged or missing, con- 
tact your supplier. Each keyset should have the follow- 
ing: 
0 Baseplate 
0 Extra blank key designation tabs 
l One six-foot, three-pair line cord 
l One handset 
l One four-conductor coiled handset cord 
l Slide-out directory card 
NOTE: The GLX-Plus Keyset...
Start reading Inter-Tel Glx Plus Issue 2 Installation And Field Maintenance Manual

Related Manuals for Inter-Tel Glx Plus Issue 2 Installation And Field Maintenance Manual

All Inter-Tel manuals