Page 81
Laboratory Activity (1.3) - Peripheral (1) USING 25 PAIR CABLES WITH MALE CONNECTORS ON ONE END, CONNECT FIVE CABLES TO THE FOLLOWING RECEPTACLES: CN 0, CN 1, CN 10, CN 11, CN 12. (2) RUN CABLES NEATLY FROM THE OMNI SBCS CABINET USING SCREWS TO FASTEN THE CONNECTORS TIGHTLY TO THE RECEPTACLES. CONNECT EACH CABLE TO THE CDF BLOCK DESIGNATED BELOW: (A) CN 0 - FIRST STATION CDF BLOCK (B) CN 1 - SECOND STATION CDF BLOCK (C) CN 10 - FIRST STATION CDF BLOCK (D) CN 11 - SECOND STATION CDF BLOCK (E)...
Page 82
tory ffktivity (1.3) - Peripheral tion (Contin (4) WIRE CROSS CONNECTIONS AND INSTALL THE FOLLOWING STATION INSTRUMENTS USING THE DESIGNATED CONFIGURATIONS: -.- (A) - (W CG’ (C) -/CD) J (El u:.l (F) ‘ii! (G) b’: (H) LA) ’ (J) CS-10 TELEPHONE USING 8EKC CARD IN SLOT 01, CIRCUIT 0. DEFAULT STATION DIRECTORY NUMBER WILL BE 208. DO NOT CONNECT THIS STATION TO THE MODULAR JACK AT THIS TIME. IT WILL BE ADDED DURING A DATA BASE PROGRAMMING LAB ACTIVITY. CS-10 TELEPHONE USING 8EKC CARD IN SLOT...
Page 83
Laboratory Activity (1.3) - Peripheral Hnstallatio (Continue GTE OMNU SBCS (6) WIRE CROSS CONNECTIONS FOR THE POWER FAIL TRANSFER STATION: (A) SINGLE LINE TELEPHONE INSTRUMENT USING 8SLC CARD IN SLOT 02, CIRCUIT 0 TO POWER FAIL TRANSFER CDF BLOCK. (B) POWER FAIL TRANSFER CARD (GPFT) IN SLOT 22, CIRCUIT 0 TO CO TRUNK ON 4BWC CARD IN SLOT 18, CIRCUIT 0. LAB MILESTONE: e VERIFY THAT POWER FAIL TRANSFER CROSS CONNECTIONS ARE WIRED CORRECTLY. . ASK INSTRUCTOR TO INSPECT THE CROSS CONNECTIONS AND...
Page 84
(7) VERIFY THAT POWER FAlL TRANSFER TRUNKS HAVE BEEN INSTALLED FROM CARD SLOT 18, CIRCUIT 0. WIRE CROSS CONNECTIONS AND INSTALL THE FOLLOWING TRUNK LINES USING THE DESIGNATED CONFIGURATIONS: (A) THREE ADDITIONAL CO TRUNK LINES USING 4BWC CARD IN SLOT 18, CIRCUITS 1,2, AND 3. (B) TWO LOOP TIE LINES USING 2TTL CARD IN SLOT 16, CIRCUITS 0 AND 1. THESE TIE LINES WILL BE USED TO ACCESS OTHER OMNI SBCS LAB SYSTEMS. INSTRUCTOR WILL PROVIDE INSTRUCTIONS REGARDING CONNECTION. (6) TWO E&M TIE LINE (TYPE...
Page 85
(8) CONNECT PORTABLE MAINTENANCE PANEL (PMP) TO OMNI SBCS CABINET. CONNECT DIN PLUG OF EPSON CABLE #715 TO PORT MARKED “RS-232-C” ON BACK OF PMP. CONNECT DB-25 CONNECTOR END OF CABLE TO PORT CN13 (I/O 0) ON THE SBCS CABINET. (9) ENSURE THAT BOTH OMNI SBCS AND PMP POWER SWITCHES ARE OFF. (10) INSTALL FLOPPY DISKETTE UNIT TO PMP USING PROCEDURE FOUND IN THE STUDENT WORKBOOK. DO NOT POWER ON THE PMP OR FLOPPY DISKETTE DRIVE UNIT UNTIL INSTRUCTED TO DO SO DURING THE INITIALIZATION LAB ACTIVITY. (11)...
Page 86
COMPLETE ALL OR PART OF THE FOLLOWlNG ACTIVITY IF TlME PERMITS OR IF INSTRUCTOR DIRECTS YOU TO DO SO. (1) WIRE CROSS CONNECTIONS AND INSTALL ONE OR BOTH OF THE FOLLOWING OPTIONAL PERIPHERAL EQUIPMENT USING THE DESIGNATED CONFIGURATIONS BELOW: (A) NIGHT BELL USlNG 8SLC CARD IN SLOT 02, CIRCUIT 3. (B) MUSIC SOURCE FOR MUSIC-ON HOLD USING 4BWC CARD IN SLOT 18, CIRCUIT 2. LAB MILESTONE: 8 VERIFY THAT NIGHT BELL AND MUSIC SOURCE ARE WIRED AND INSTALLED CORRECTLY. @ ASK INSTRUCTOR TO INSPECT CROSS...
Page 87
Review Exercise (1.3) - Peripheral I tisn INSTRUCTIONS: THE FOLLOWING EXERClSE CONSISTS OF MULTIPLE CHOICE, FILL IN THE BLANK OR MATCHING TYPE QUESTIONS. ALL AVAILABLE RESOURCES (I.E. STUDENT WORKBOOK, NOTES, AND GTEP MANUAL) MAY BE USED AS REFERENCES. SUBMIT EXERCISE TO INSTRUCTOR FOR GRADING WHEN LAST QUESTION HAS BEEN COMPLETED. 1. WHAT CARD SLOTS AND CIRCUITS DO THESE SYSTEM CABLES SUPPORT (ALL SPACES WILL NOT BE REQUIRED); CABLE CARD SLOT / CIRCUITS CARD SLOT / CIRCUITS CARD SLOT / CIRCUITS...
Page 88
ewiew 4. COMPLETE THE FOLLOWING DIAGRAM INDICATING THE CROSS CONNECTIONS THAT WERE MADE FOR THE SIX EKT TELEPHONES. ONE OF THE CS-10 TELEPHONES HAS BEEN COMPLETED, AS AN EXAMPLE. cs-20 (CKT4) _ - _ - _ - _ - _ - _ - _ - _ - _ _ _ - _ - _ - _ - _ - _ - _ - _ - _ - ” - _ - _ - _ - _ - _ - _ _ _ - _ - - - _ - _ - _ - _ - - - _ - _ - _ - _ - _ _ _ - _ - _ - CABLE 0. MODULAR JACK CABLE 1 cs-10 (CKTO)
Page 89
eview Exercise (1.3) - Peripheral ati 5. COMPLETE THE FOLLOWING DIAGRAM INDICATING THE CROSS CONNECTIONS THAT WERE MADE FOR THE TWO SINGLE LINE TELEPHONES. CABLE 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1.80 SLT (CKTO) I I ET2 t 0 SLT (CKT7)
Page 90
ewiew Exercise 7. COMPLETE THE FOLLOWING DIAGRAM INDICATING THE CROSS CONNECTIONS THAT WERE MADE FOR THE POWER FAILURE TRANSFER INSTALLATION (INCLUDE TRUNK AND INSTRUMENT CROSS CONNECTIONS, AS WELL AS CROSS CONNECTIONS TO THE THREE CARDS). CABLE 1 (TO 8SLC) - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1.81