Page 51

round Wire T 
(1) 
(2) 
(3) 
/ 
--EQUIPMENT CABINET 
 
SIGNAL GROUND TERMINAL 
FRAME GROUND 
TERMINAL POWER 
SUPPiY 
UNIT 
BT 
---------- 
,FRAME GROUND TERMINAL 
GROUND BOTH FRAME GROUND TERMINALS (FOR EQUIPMENT 
CABINET AND POWER SUPPLY UNIT) TO AN APPROVED EARTH 
GROUND. 
RUN SEPARATE GROUND WIRE FOR THE SIGNAL GROUND. 
USE #6 AWG STANDARD CABLE. 
1.44  

Page 52

e 
. 
2 
4  

Page 53

Laboratory Activity (1.2) - 
PERFORM THE INSTALLATION TASKS IN THE SEQUENCE OUTLINED BELOW, IN ACCORDANCE WITH THE 
GTE OMNI SBCS GTEP MANUAL. COMPLETE THE REVIEW EXERCISE QUESTIONS PERTAINING TO CABINET 
INSTALLATION UPON COMPLETION OF THIS LABORATORY ACTIVITY. 
(1) MOUNT CABINET AND POWER SUPPLY TO MOUNTING BRACKET. 
(A) REFER TO GTEP MANUAL OR STUDENT WORKBOOK FOR MOUNTING BRACKET REQUIREMENTS. 
(B) MOUNT THE BRACKET TO A SOLID SURFACE OR TO A STUD IN THE WALL. USE 24” CENTERS. 
(C) ENSURE THAT...

Page 54

(4) ENSURE THAT SYSTEM IS GROUNDED AND THAT YOU ARE WEARING A GROUNDED ANTI-STATIC 
WRIST STRAP DEVICE. 
(5) REMOVE HINGED CABINET DOOR AND TEMPORARILY STORE IT OUT OF THE WAY. 
(6) BEGIN INSTALLING THE DESIGNATED PRINTED CIRCUIT BOARDS (IN THE SEQUENCE OUTLINED 
BELOW), FROM LEFT TO RIGHT IN THE SYSTEM CABINET: 
(A) INSTALL THE RING GENERATOR IN THE MARKED SLOT TO THE FAR LEFT. ENSURE THAT 
COMPONENTS FOR THIS CARD ARE ON THE RIGHT SIDE OF THE BOARD. 
NOTE: FOR INSTALLATION OF ALL OTHER PCB CARDS, THE...

Page 55

INSTRUCTIONS: THE FOLLOWNG EXERClSE CONSlSTS OF WlULTlPLE CHOICE. FILL 
1. 
2. 
3. 
4. 
5. 
6. 
IN THE BLANK OR MATCHING TYPE QUESTIONS. ALL AVAILMiLE 
RESOURCES (I.E. STUDENT WORKBOOK, NOTES, AND GTEP 
MANUAL) MAY BE USED AS REFERENCES. SUBMIT EXERCISE TO 
INSTRUCTOR FOR GRADING WHEN LAST QUESTION HAS BEEN 
COMPLETED. 
THE MOUNTING BRACKET IS DESIGNED TO PERMIT MOUNTING ON 
OR INCH CENTERS. 
(TRUE OR FALSE) THE POWER SUPPLY IS MOUNTED TO THE RIGHT OF THE 
SYSTEM CABINET. 
THREE GROUND WIRES ARE REQUIRED...

Page 56

Review Exer (1.2) - Cabinet 
7. COMPLETE THE OMNI SBCS FRAME IMAGE BELOW, BY IDENTIFYING WHAT TYPE 
OF CARDS WERE INSTALLED IN EACH CARD SLOT DURING THE LAB ACTIVITY. 
8. 
9. 
10. 
11. 
12. 
13. 
14. 
POWER 
SUPPLY 
11 RGEN RGEN t 
WHICH CARD IS INSERTED WITH COMPONENTS FACING THE RIGHT SIDE OF THE 
CABINET WHEN INSTALLED CORRECTLY? 
OTHER THAN LINE OR TRUNK CARDS, WHICH THREE TYPES OF CARDS ARE 
CONSIDERED TO BE OPTIONAL? 
9 , AND 
HOW MANY CIRCUITS CAN BE ASSIGNED AS POWER FAIL TRANSFER CIRCUITS? 
HOW...

Page 57


				            

Page 58

FEATUPF ACCESS CODE ASSIGNMENTS 
PACKAGE C 
(Continued) 
SBCSISTARLOG 
Feature Default Enter New 
Number Access Access Code 
Pl 
Code P2 
48 *0 
2 NONE 
160 67 
49 #!fJ 
151 *7 
91 P7 
130 6 I. * 
70 NONE 
78 NONE 
79 NONE  Feature Name 
!??xon speed calling 
Station Prefix 
Subordinate data call setup (2.0) 
System speed calling 
Trunk camp-on (activate) 
Trunk camp-on (cancel) 
Trunk access - direct trunk access 
Wake-up other (activate) (2.0) 
Wake-up self (activate) (2.0) 
Wake-up self (cancel) (2.0)  

Page 59


				            

Page 60

1.3 Enabling Objective/ 
Peripheral Installation 
GIVEN: 0 
0 
e 
0 
0 
0 
ACTION: 0 
0 
0 
0 
0 
0 
0 
CRITERIA: 8 
0 
GTE OMNI SBCS 
GTE OMNI SBCS PERIPHERALS 
ASSORTED GAUGE WIRE, AMP CONNECTOR CABLES, CDF BLOCKS, MODULAR 
TELEPHONE JACKS, AND HARDWARE 
GTE OMNI SBCS COURSE AND SITE DOCUMENTATION PACKAGE 
STANDARD INSTALLATION TOOLS 
REVIEW EXERCISE 
CONNECT AND FASTEN AMP CONNECTOR CABLES FROM OMNI SBCS TO CDF 
BLOCKS. 
INSTALL PERIPHERAL DEVICES BY MAKING CORRECT CROSS CONNECTIONS 
FROM MODULAR...
Start reading GTE Omni Scbs Installation And Maintenance Manual

Related Manuals for GTE Omni Scbs Installation And Maintenance Manual

All GTE manuals