GTE Omni Scbs Installation And Maintenance Manual
Here you can view all the pages of manual GTE Omni Scbs Installation And Maintenance Manual. The GTE manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 92
eview Exercis s 8. COMPLETE THE FOLLOWING DIAGRAMS INDICATING THE CROSS CONNECTIONS THAT WERE MADE FOR THE EIGHT TRUNKS THAT WERE INSTALLED (POWER FAIL, CO, LOOP TIE LINES, AND E&M TIE LINES). CABLE 10 CABLE 11 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1.83 CABLE 12 14 - - 40 - - :: I I 16 - _ 42 - _ 17 - - 43- - I8 - - 44- - 19 - - 45- - 20 - _ 46- - 21 - - 47 - _ 22 - _ .l8- - 23 - - 49 24 I 1 50 - _ , 25 - _ - - - - - - - - - -
Page 93
Review Exercise (1.3) - Peripheral lation (Continued) 9. THE PMP MAY BE CONNECTED TO EITHER OMNI SBCS PORT OR . 10. BEFORE THE FLOPPY DISKETTE DRIVE MAY BE INSTALLED, THE PMP REQUIRES THAT ADDITIONAL MUST FIRST BE INSTALLED. 11. MATCH THE FOLLOWING TYPES OF CABLES TO THEIR APPROPRIATE CONNECTIONS: # 715 (A) FLOPPY DISKETTE DRIVE UNIT TO PMP # 707 (B) PMP TO OMNI SBCS PORT 12. THE SMDR PRINTER IS INSTALLED IN WHAT OMNI SBCS PORT? OPTIONAL PERIPHERAL QUESTIONS (NIGHT BELL AND MUSIC-ON-HOLD...
Page 96
1.4 Enabling Objective/Start Up and GIVEN: 0 0 0 ACTION: 0 0 0 CRITERIA: 0 0 INSTALLED GTE OMNI SBCS AND PERIPHERALS GTE OMNI SBCS COURSE AND SITE DOCUMENTATION PACKAGE REVIEW EXERCISE POWER ON SYSTEM AND PERFORM COLD RESTART TO INITIALIZE DEFAULT STANDARD DATA BASE. PERFORM SYSTEM OPERATION CHECKS. COMPLETE REVIEW EXERCISE. SYSTEM WILL BE INITIALIZED AND OPERATION WILL BE VERIFIED IN ACCORDANCE WITH GTE OMNI SBCS GTEP MANUAL. REVIEW EXERCISE QUESTIONS WILL BE COMPLETED CORRECTLY IN...
Page 97
CPM Controls & Indicat GREEN LED SHOWS SYSTEM STATUS. NORMAL CONDITION IS ON. I C LA ALM (RED) LED INDICATES A MINOR ALARM. TO (RED) LED INDICATES A MAJOR ALARM. / UP-COLD RESTART J CAUTION REESTABLISHES DEFAULT DATA BASE ODDB IS LOST CENTER- COLD RESET MOMENTARY INTERRUPT (8 HOT DOWN- HOT RESTART %b lo 0 r - RUN (GREEN) - RESTART BUTTON 1 1.88 I
Page 98
System Initialization DESCRIPTION: . LOADS SYSTEM OPERATING PROGRAM AND DATA BASE MANAGEMENT PROGRAM FROM ROM TO WORKING ROM AND EPROM. @ INITIALIZES SYSTEM BY LOADING DEFAULT STANDARD DATA BASE AT TIME OF INSTALLATION. . REQUIRES THAT AT LEAT ONE LINE CARD AND ONE TRUNK CARD ARE SEATED IN CARD SLOTS FOR SYSTEM PROGRAMMING. . MUST BE PERFORMED WHENEVER CPM OR MEM CARDS ARE REPLACED. . MUST ALSO BE PERFORMED AFTER SERIOUS POWER OUTAGE WITH LOSS OF SYSTEM BATTERY BACKUP. PROCEDURE: (1) HOLD TOGGLE...
Page 99
AFTER SYSTEM HAS BEEN lNlTlALlZED WITH A COLD RESTART AND PROGRAMMED ACCORDING TO CUSTOMER SPECIFICATIONS, PERFORM THE FOLLOWING CHECKS AS APPLICABLE: (1) TEST STATION INSTRUMENTS TO ENSURE THAT EACH IS OPERATING CORRECTLY. LISTEN FOR DIAL TONE, TEST FEATURE BUTTONS, AND VERIFY CAPABILITY TO MAKE STATION-TO-STATION CALLS AND TRUNK CALLS. (2) TEST PERSONAL LINES AND KEY SYSTEM TYPE LINES. (3) TEST SYSTEM ACCESS CODES. (4) TEST CLASSES OF RESTRICTION. (5) TEST LEAST COST ROUTING. (6) TEST SMDR...