GE Pqm 2 Manual
Here you can view all the pages of manual GE Pqm 2 Manual. The GE manuals for Power Products are available online for free. You can easily download all the documents as PDF.
Page 81
CHAPTER 4: SOFTWARE PQMII POWER QUALITY METER – INSTRUCTION MANUAL4–21 4.6 Using EnerVista Viewpoint with the PQMII 4.6.1 Plug and Play Example EnerVista Viewpoint is an optional software package that puts critical PQMII information onto any PC with plug-and-play simplicity. EnerVista Viewpoint connects instantly to the PQMII via serial, ethernet or modem and automatically generates detailed overview, metering, power, demand, energy and analysis screens. Installing EnerVista Launchpad (see previous...
Page 82
4–22PQMII POWER QUALITY METER – INSTRUCTION MANUAL CHAPTER 4: SOFTWARE Enter the desired site name in the Site Name field. If desired, a short description of site can also be entered along with the display order of devices defined for the site. Click the OK button when complete. The new site will appear in the upper-left list in the EnerVista PQMII Setup Software window. Click the Add Device button to define the new device. Enter the desired name in the Device Name field and a description...
Page 83
CHAPTER 4: SOFTWARE PQMII POWER QUALITY METER – INSTRUCTION MANUAL4–23 FIGURE 4–9: ‘Plug and Play’ Dashboard Click the Dashboard button below the PQMII icon to view the device information. We have now successfully accessed our PQMII through EnerVista Viewpoint.
Page 84
4–24PQMII POWER QUALITY METER – INSTRUCTION MANUAL CHAPTER 4: SOFTWARE FIGURE 4–10: EnerVista Plug and Play Screens
Page 85
CHAPTER 4: SOFTWARE PQMII POWER QUALITY METER – INSTRUCTION MANUAL4–25 For additional information on EnerVista viewpoint , please visit the EnerVista website at http://www.enervista.com.
Page 87
PQMII POWER QUALITY METER – INSTRUCTION MANUAL5–1 PQMII Power Quality Meter Chapter 5: Setpoints Digital Energy Setpoints 5.1 Introduction 5.1.1 Setpoint Entry Methods Prior to operating the PQMII, it is necessary to program setpoints to def ine system characteristics and alarm settings by one of the following methods: • Front panel, using the keys and display. • Rear terminal RS485 port COM1 or COM2, or front RS232 port and a computer running the EnerVista PQMII Setup Software included with the...
Page 88
5–2PQMII POWER QUALITY METER – INSTRUCTION MANUAL CHAPTER 5: SETPOINTS 5.1.2 Setpoints Main Menu SETPOINTS [] S1 PQMII SETUP PREFERENCES []See page 5–5. MESSAGE SETPOINT [] ACCESSSee page 5–6. MESSAGE COM1 RS485 [] SERIAL PORTSee page 5–7. MESSAGE COM2 RS485 [] SERIAL PORTSee page 5–7. MESSAGE FRONT PANEL [] RS232 SERIAL PORTSee page 5–7. MESSAGE DNP 3.0 [] CONFIGURATIONSee page 5–8. MESSAGE CLOCK []See page 5–9. MESSAGE CALCULATION [] PARAMETERSSee page 5–10. MESSAGE CLEAR...
Page 89
CHAPTER 5: SETPOINTS PQMII POWER QUALITY METER – INSTRUCTION MANUAL5–3 MESSAGE ANALOG INPUT []See page 5–25. MESSAGE SWITCH INPUT A []See page 5–27. MESSAGE SWITCH INPUT B []See page 5–27. MESSAGE SWITCH INPUT C []See page 5–27. MESSAGE SWITCH INPUT D []See page 5–27. MESSAGE PULSE OUTPUT []See page 5–28. MESSAGE PULSE INPUT []See page 5–29. MESSAGE DATA LOGGER []See page 5–30. MESSAGE VOLTAGE DIST. [] RECORDERSee page 5–30. MESSAGE END OF PAGE S2 [] MESSAGE SETPOINTS...
Page 90
5–4PQMII POWER QUALITY METER – INSTRUCTION MANUAL CHAPTER 5: SETPOINTS MESSAGE POWER FACTOR []See page 5–43. MESSAGE DEMAND []See page 5–46. MESSAGE PULSE INPUT []See page 5–48. MESSAGE TIME []See page 5–49. MESSAGE MISCELLANEOUS []See page 5–50. MESSAGE END OF PAGE S4 [] MESSAGE SETPOINTS [] S5 TESTING TEST RELAYS & [] LEDSSee page 5–51. MESSAGE CURRENT/ [] VOLTAGE SIMULATIONSee page 5–51. MESSAGE ANALOG OUTPUTS [] SIMULATIONSee page 5–52. MESSAGE ANALOG INPUT []...
All GE manuals