GE Pqm 2 Manual
Here you can view all the pages of manual GE Pqm 2 Manual. The GE manuals for Power Products are available online for free. You can easily download all the documents as PDF.
Page 131
CHAPTER 5: SETPOINTS PQMII POWER QUALITY METER – INSTRUCTION MANUAL5–45 process control. A minimum of 20 V applied must exist on all voltage inputs before this feature will operate. •POWER FACTOR LEAD 1(2) PICKUP: When a leading power factor equals or exceeds the level set by this setpoint , a Power Factor Lead 1(2) condition will occur. •POWER FACTOR LEAD 1(2) DROPOUT: When a leading power factor drops below this level, the Power Factor Lead 1(2) condition will drop out . •POWER FACTOR LEAD 1(2)...
Page 132
5–46PQMII POWER QUALITY METER – INSTRUCTION MANUAL CHAPTER 5: SETPOINTS 5.5.6 Demand Alarms PATH: SETPOINTS S4 ALARMS/CONTROL DEMAND •PHASE A/B/C/NEUTRAL CURRENT DMD RELAY: Phase/neutral current demand detection can either be disabled or used as an alarm or process control. Set this setpoint to “Off ” if the feature is not required. Selecting “Alarm” activates the alarm relay and displays an alarm message whenever a phase/neutral current demand level DEMAND [] PHASE A CURRENT DMD RELAY:...
Page 133
CHAPTER 5: SETPOINTS PQMII POWER QUALITY METER – INSTRUCTION MANUAL5–47 is equalled or exceeded. Selecting “Aux1”, “Aux2”, or “Aux3” activates the respective auxiliary relay with no message displayed. This is intended for process control. •PHASE A/B/C/NEUTRAL CURRENT DMD LEVEL: When the phase A/B/C/ or neutral current demand equals or exceeds this setpoint , a phase A/B/C or neutral demand alarm or process control indication occurs. •3Φ POS/NEG REAL PWR DMD RELAY: Three-phase positive/negative real...
Page 134
5–48PQMII POWER QUALITY METER – INSTRUCTION MANUAL CHAPTER 5: SETPOINTS 5.5.7 Pulse Input PATH: SETPOINTS S4 ALARMS/CONTROL PULSE INPUT •PULSE INPUT 1(4) RELAY: Any of the PQMII switch inputs can be assigned to count pulse inputs as shown in 5.3.4 Switch Inputs. This setpoint can be used to give an indication (alarm or control) if the programmed level is equaled or exceeded. Set this setpoint to “Off ” if the feature is not required. Selecting “Alarm” activates the alarm relay and displays an...
Page 135
CHAPTER 5: SETPOINTS PQMII POWER QUALITY METER – INSTRUCTION MANUAL5–49 assigned, a PULSE INPUT 1(4) ALARM message will also be displayed. The units in this setpoint are determined by the S2 SYSTEM SETUP PULSE INPUT PULSE INPUT UNITS setpoint . •PULSE INPUT 1(4) DELAY: This setpoint can be used to allow a time delay before the assigned relay will energize after the PULSE INPUT 1(4) LEVEL has been equaled or exceeded. •TOTALIZED PULSES RELAY: A relay can be selected to operate based upon a...
Page 136
5–50PQMII POWER QUALITY METER – INSTRUCTION MANUAL CHAPTER 5: SETPOINTS •PICKUP TIME: The relay assigned in the TIME RELAY setpoint energizes when the PQMII clock time equals or exceeds the time specif ied in this setpoint . Follow the example below to set the PICKUP TIME. •DROPOUT TIME: The relay assigned in the TIME RELAY setpoint de-energizes when the PQMII clock time equals or exceeds the time specif ied in this setpoint . Follow the example above to set the DROPOUT TIME. 5.5.9 Miscellaneous...
Page 137
CHAPTER 5: SETPOINTS PQMII POWER QUALITY METER – INSTRUCTION MANUAL5–51 5.6 S5 Testing 5.6.1 Test Relays and LEDs PATH: SETPOINTS S5 TESTING TEST RELAYS & LEDS To verify correct operation of output relay wiring, each output relay and status indicator can be manually forced on or off via the keypad or serial port . While the OPERATION TEST setpoint is displayed, use the VA L U E keys to scroll to the desired output relay and/or status indicator to be tested. As long as the test message remains...
Page 138
5–52PQMII POWER QUALITY METER – INSTRUCTION MANUAL CHAPTER 5: SETPOINTS •SIMULATION ENABLED FOR: Select the desired length of time to enable simulation. When the programmed time has elapsed, current and voltage simulation will turn off. If “Unlimited” is selected, simulated currents and voltages will be used until simulation is turned off via the SIMULATION setpoint or via the serial port or until control power is removed from the PQMII. •PHASE A/B/C/NEUTRAL CURRENT: Enter the desired phase and...
Page 139
CHAPTER 5: SETPOINTS PQMII POWER QUALITY METER – INSTRUCTION MANUAL5–53 NoteSimulated values for Analog outputs may only be entered while SIMULATION mode is set to “On”. 5.6.4 Analog Input PATH: SETPOINTS S5 TESTING ANALOG INPUTS SIMULATION •SIMULATION: Enter “On” to switch from an actual analog input to the programmed simulated value. Set this setpoint “Off ” after simulation is complete. •SIMULATION ENABLED FOR: Select the desired length of time to run simulation. When the programmed time has...
Page 140
5–54PQMII POWER QUALITY METER – INSTRUCTION MANUAL CHAPTER 5: SETPOINTS is turned off via the SIMULATION setpoint or via the serial port or until control power is removed from the PQMII. •SWITCH INPUT A(D): Enter the switch input status (open or closed) to be simulated. 5.6.6 Factory Use Only PATH: SETPOINTS S5 TESTING FACTORY USE ONLY These messages are for access by GE Multilin personnel only for testing and service. FACTORY USE [] ONLYSERVICE PASSCODE: 0Range: N/A
All GE manuals